HomeMy WebLinkAboutPROSPECT STATION - PDP - PDP130004 - CORRESPONDENCE -02/27/2013: The bicyclist on the building are considered signage. Signage is a not approved
through the PDP/FP process. Signs and their locations are approved through separate sign
permits. Please remove these from the elevations plans.
At this time it can not be determined if the Clock on the building is considered a sign. Please
provided greater detail of the clock face. If it is considered a sign the above statement applies
to the clock also. 1,iii
Comment Number: 2
02/27/2013: LUC 3.5.1(1) Mechanical/utility equipment
conduit...) locations need to be identified on the plans w
screen/painted. 1�
How is the transformer screened? Can the
a wall or screening fence?
Comment Number: 3
02/27/2013: The bicycle parking located in
required bicycle parking spaces.
Comment Number: 4 t h),
02/27/2013: LUC 3.2.2(L) Ca
are limited to 40% of the total
will require a modification to th
designated by„ajsign that they
Park
LUC 3.820(C) At least c
or a private park that is 10,
rl R),
how this�baetng met, there
3: "'LightMfixtures labeled CC
t Originated: 02/27/2013
, meters, boxes,
such equipment is
be located closer to th`elbuildinq behind
iment Originated:NO2/27/2013
be used to comply with
NIL
Comment Originated: 02/27/2013
are only allowdfLong-term parking areas and
[,area The proposed plans exceed this 40% and
addition,the combact Waces will need to be
Originated: 02/28/2013
f the dwellings shall be located within 1320 ft of a
q ft in size and publicy accessed. Please Idenfity
1sho be two public parks near by, High School
sdjo verify if they meet the standard.
Comment Originated: 02/28/2013
FF are uplighting. It is unclear why the same desired
not 156,,I thieved with downlighting. This may require alternative compliance for
Comment"Number: 7'"' 1 Comment Originated: 02/28/2013
i111l�1,
02/28/2013: LUC 3.5.1(G) All structures over 40ft in height require a special height review that
tl1 ItlI�h
requires both ashadow and visual analysis (see section for details).
location(s) on every new building equipped with a required fire sprinkler or fire alarm system.
The top shall not be higher than 6 feet above finished floor.
2006 International Fire Code 506.1 and Poudre Fire Authority Bureau Policy 88-20
Comment Number: 07 Comment Originated: 02/20/2013
02/20/2013: PREMISE IDENTIFICATION
New and existing buildings shall be plainly identified. Address numbers shall be visible from
AEI},
the street fronting the property, plainly visible, and posted with a minima iof six-inch numerals
on a contrasting background.` '
2006 International Fire Code 505.1 , 1
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932,
Topic: Erosion Control
Comment Number: 1
Comment
03/04/2013: The site disturbs more than'10100,0 sq-ft therefo(diErosion and SedimeriF06ntrol
Materials need to be submitted for FDP. The erosion conntrr I requirements are in the
'�r,1}; { ntt
Stormwater Design Criteria under the Amendments D. Volume 3 Chapter 7 Section 1.3.3. If you
n411Jt4
need clarification concerning this section, or if there are an.y questions please contact Jesse
i #k11
Schlam 970-218-2932 or emailt(a7 ischlam @fcaov.com 1 lth.
Department: Transportation Planning
Contact: Emma McArdle,jj, 970-224-6
Topic: GeneralANI I
3
t+Number: w11 �� Comment Originated: 03/04/2013
3: Thank you fob including a pullout as we discussed in the conceptual review for this
fhe size looks
Ito as we discussed: Can you please do one final verification by
pullout size with atu Wing templa e�for a 40' bus at the speed of Prospect at this
�cof and/or .W,ard Stanford for questions on this. Please !�ntact mysel
�itltliii
t mbe r:,, 2 Comment Originated: 03/04/2013
iitlltR .
3 Please include the crosswalk across Prospect for the trail on your site plan.
tact: Aaron Ive'rsi
Topic: General
Comment t
03/06/2013:
mlber: 3 Comment Originated: 03/06/2013
?Thie
TIS for Prospect Station concludes that the Pedestrian LOS cannot be
kki}ui
No; iteria.We will need to have more information about the specific reasons the
of achieved, and what would be needed to meet the standard. The way it is
provides no recommendations or mitigation. We need more information so that
we camaeciae whether or not this project needs to make off -site improvements to meet the
LOS standard.
Department: Zoning
Contact: Noah Beals, 970-416.2313, nbeals(a)fcclov.com
Topic: General
Comment Number: 1 Comment Originated: 02/27/2013
a
Comment Number: 5 Comment Originated: 02/19/2013
02/19/2013: After the plans are final, an Autocad drawing (versiion 2008) of the utility plan will
need to be sent to Terry Cox at TCOX@FCGOV.COM.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(cDpoudre-fire.org
Topic: General
Comment Number: 01
02/20/2013: GROUP S-2 AUTOMATIC SPRINKLER
An automatic sprinkler system shall be provided throui
parking garages (Group S-2 occupancy) in accordance
beneath other groups. Exception: Enclosed parkng gi
occupancies. r�r (
, �
2006 International Fire Code 903.2.9 & 903`:M �1
Comment Number: 02 N }I,
02/20/2013: BALCONIES AND DECKS
Sprinkler protection shall be provided for exterior
dwelling units where the build;ingisr,of Type V con
2006 International Fire Codef903.3.12 ,
Comment Number: 03�a'
02/20/2013: FIRE STANDPIPE SYSTEM
Originated: 02/20/2013
paildings clas`sifi�ed as enclosed
IBC 406.4 ORhere located
located beneathtGrouD R3
Originated: '0490/2013
and ground floor patios of
Originated: 02/20/2013
Standpipe �sy ie ',lshal be provided in ew"Uilildings"and stRuctures in accordance with
Section 905,'or the 2006 nternational Fire" b e. Approved standpipe systems shall be installed
�(ii4l+yt' . ` 1 ,h j
throughout buildings w e��the floor level�of the highest story is located more than 30 feet
above the lowest level Afire department vehicle access, or where the floor level of the lowest
. , ...
story�loccated morre h��a mz30 feet below theihighest level of fire department vehicle access.
The standpipe ys{tem shall op able of supplying at minimum of 100 psi to the top habitable
floor. An approve fire pump may bet{required to achieve this minimum pressure.
I
rFire Code Sections 905and 913
i
Comment,Number 1 04 Comment Originated: 02/20/2013
Fire Department Connections shall be installed in accordance with NFPA standards. Fire
department connections shall be located on the street side of buildings, fully visible and
.Ofll
recognizable fromtthe street or nearest point of fire department vehicle access. The location of
.the FDC shalt be approved by the fire department.
N, �`ii IN
20}06 International Fire Code 912.2
Co`mmeotiNu tuber: 05 Comment Originated: 02/20/2013
02/2012013: ROOF ACCESS
New buildings four or more stories in height shall be provided with a stairway to the roof.
Stairway access to the roof shall be in accordance with IFC 1009.12. Such stairways shall be
marked at street and floor levels with a sign indicating that the stairway continues to the roof.
2006 International Fire Code 504.3
Comment Number: 06 Comment Originated: 02/20/2013
02/20/2013: KEY BOXES REQUIRED
Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in approved
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(cDfcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 03/06/2013
03/06/2013:
Contact the City Forester for an on -site meeting to review existing OR and any need to
provide mitigation and the need to provide identification, condition assessment and size.
Comment Number: 2 j Com assessment
Originated: 03/06/2013
03/06/2013:
Existing trees to retain along Prospect need to be`I'� d as to species. Theccurb for the
1"s?4 i#i ` ,,, .
proposed Transfort pull out appears to be (lose#town existing tree and may impact the root
system. Review the curbs placement with City Forester at the on -site meeting.
Department: Historical Preservation
Contact: Josh Weinberg, 970-221.6206,
Topic: General 11!r ",
Comment Number: 1
The proposed plans appear to
Prospect, that has been deten
Department:
Ma
spatial
LUC 3.4.
� Comment Originated: 02/25/2013
se impact on the adjacent building, 303 West
jlfv�lig� 16e for designation as a Fort Collins
?Ii ib ) I1!1; n
nd south serveas a buffer between the
maintains a historic view corridor, and
of the historic building and surrounding area,
ComM0Number'`iE1' Comment Originated: 02/19/2013
02/19/201#3# ,he bwldinkgfheight of 4 stories typically triggers the need for a fire buster pump,
which will likely need 3 ph`ase power. Please coordinate power and special metering
requirements #i Light & Power Engineering 970 221-6700.
4 `suu,., r 9 9 9( )
Comment Number: 2 Comment Originated: 02/19/2013
02/19/2013: jTh�e developer will need to coordinate power requirements and transformer
lill{T~ ltt
ocation with'Light & Power Engineering. The electric transformer pad must be a minimum of 2
�lr�rf�
feet from! ny sidewalk. A Commercial Service Information (C-1) form will be needed for all
non residential services.
Comment Number: 3 Comment Originated: 02/19/2013
02/19/2013: After the plans are final, a 1-line diagram of the electric service(s) will need to be
provided to Light & Power Engineering.
Comment Number: 4 Comment Originated: 02/19/2013
02/19/2013: An off -site utility easement adjacent to Prospect Rd. along the front of the adjacent
property to the west may be required to bring 3 phase power to the site.
existing easement on lot 1. Specifically the Access and emergency access easement
portions that will now have the parking and sidewalk improvements included inside of them.
Comment Number: 12 Comment Originated: 03/05/2013
03/05/2013: Sheet 4 - Provide a note at the trail crossing onto Prospect that the site contractor
will need to tie to and match existing. This is due to construction occuring currently on MAX
and some grades may not reflect in the field what is shown on these plans.
Topic: GeneralINl
''
Comment Number: 2 Coin ment Originated: 02/28/2013
ifli�
02/28/2013: A letter of understanding will be required fromthe property owners to the south
AMf4t *u i
stating that they are aware of the proposed portion of Tamasag easementivacation and do not
111 J.
take issue to the impact on their property., "�4','.,
Topic: Plat it ik
Comment Number: 9 Comment Originated1l3/05/2013
03/05/2013: The Mason Trail Easement vacation is cited within�the easement and dee
141411MIMN rttt*tEt �a
agreement for Rec. # 20090061268. City of'F.�o ft4Collins�woulydi ike to proceed with the
Modification of easement as per paragraph 10 of this `agreement, however in order to achieve
the "purpose and use" of the}sement to install, perate,maintain, repair, reconstruct,
replace, inspect and remove the traiii wwe will need to reser`ve`m 6portion of the easement on
the west side of the trail. f,
'� i�i+,
Comment Number: 10 Comment Originated: 03/05/2013
03/05/2013: EasemenqN
t should be inlcluded fo�dth , s£Stat o . This will be a transit
,fii1 tfflf�ff,fln �a th �ft i �t ��€ �
easementiandlspeciflc�lanouaoe may needle added toitI,, blat for what is included in a
Topic: R�e6"p';�d�its - Soils, Su
Comment Number:.
Ntlfl�+ A02/28/2013 Please
iitRr�;3,�Ptti
j i 11
supply a pavement
proyideja copy`of soi
Topic: Site PI'ant
Comment Originated: 02/28/2013
ict Tome KKdo� tman�for additional information, 970-221-6576. Please
for the bus stop,in Public Right of Way on Prospect. Please
ement design report on next submittal to Tom Knostman.
Comment'Number: 13 4fji Comment Originated: 03/06/2013
03/06/201318treet trees along Prospect need to be located so that they will work with in the
"future" parkway,## A note or callout may need to be added to the landscape drawings to
delineate thei�Iddation and ensure they won't need to be removed when prospect is widened.
Department-IEnvir'ori"m"ental Planning
Contact: Lindslay, Ex, 970-224.6143, lex(a)fcgov.com
Topic: General
Comment Number: 1
02/21/2013: No comments.
Comment Originated: 02/21/2013
03/01/2013: Bicycle parking is meeting the standards. However the chart on pg A2 and the
corresponding narrative are incorrect. The chart shows 9 2-bedroom units but there are actually
10. The narrative shows 59 total bedrooms but there are actually 69. Please correct for
revisions. FYI - The most recent bicycle standards can be found at 3.2.2(CY(4).
Comment Number: 2 Comment Originated: 03/01/2013
03/01/2013: Planter boxes or some landscaping at the entrance/exit
required per 3.10.4(D)(c). 4
Comment Number: 3 Coma
03/01/2013:. The proximity to the Mason Trail is a little too
traffic for the trail. Please provide a bit more space with atc
allow for the activity from the live -work units and the retail
AVIY
engineering's comment regarding vacating the easement.
1.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221.6603,
Topic: Construction Drawings
Comment Number: 3 '`1?t'ii:#=ay
replaced and relocated to
Comment Number: 4
Sheet 3 - Letter
parking garage is
Originated: 03/01/2013
nodate the through
lard and soft scape to
should correspond to
Comment Originated: 03/04/2013
utilities are being removed,
;mment Originated: 03/04/2013
Ijacent property owner prior to
ts, fire line, grading, etc.
lieu of a letter we would
Comment Originated: 03/04/2013
on the plat and and plans for the Transfort Bus
Comment Originated: 03/04/2013
- Bike parking is not allowed within the public right of way. Please
iinq from this sheet.
Comment Originated: 03/04/2013
4 - Discussions with Transportation Staff and planning has raised concerns
)se proximity to the Mason Trail for safety and maintenance. Furthermore,
the public trail to be used as the access to the private property along this
Comment Originated: 03/04/2013
The Mason Trail Easement vacation is cited within the easement and deed
agreement for Rec. # 20090061268. City of Fort Collins would like to proceed with the
Modification of easement as per paragraph 10 of this agreement, however in order to achieve
the "purpose and use" of the easement to install, operate, maintain, repair, reconstruct,
replace, inspect and remove the trail we will need to reserve a 6' portion of the easement on
the west side of the trail.
Comment Number: 11 Comment Originated: 03/05/2013
03/05/2013: Sheet 3 - Some consideration should be taken into vacating portions of the
M
City of ;
Fi;rt Collins:
-1� Ro,(ES (0MN'9-JFS
12
March 06, 2013
Cathy Mathis
TB Group
444 Mountain Avenue
Berthoud, CO 80513
RE: Prospect Station, PDP130004,
Please see the following summary of comments from
submittal of the above referenced project. If-youhavi
individual commenter or di�eci;your questions through
sIorson@fcgov.com.A1 '1 1 `` 1141 N111i 1
Department: CuRent Plann
Contact: Seth Lorrson ;kh, .9i
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentre view
de`ireviewing agencies for your
�anycomments, you may contact the
firwh Lorson, at 970-224-6189 or
riunaing tlevations
Il1j1jlN N91110
Commeht Number.Comment Originated: 03/01I2013
03/01/2043.The northa.
televation along the parking structure, without the 60% glazing, is
required to+rriitigate with',ample, enhanced architectural features such as a change in massing
N111111.�}, �r"
or materials, enhanced landscaping, trellises, archades or shallow display window cases."
ea;u;i
(Sec. 3.10.5(G)1Itappears that this standards may be met with the proposal but it is difficult to
tell how the landscaping will integrate with the building. Will trellises be included with the accent
1.
K
Comment Originated: 03/01/2013
03/011,2013: The south elevation is required to carry the brick base element around this side.
Additionally, the upper floors have large expanses of blank stucco walls. This building face is
prominent along the Mason Trail. Is there a reason for not having windows and/or balconies
along the sunniest side of the building? Please provide greater architectural detail and
articulation.
Topic: Site Plan
Comment Number: 1 Comment Originated: 03/01/2013