HomeMy WebLinkAboutBOARDWALK CROSSING @ MASON STREET - PDP/FDP - FDP130003 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYBicycle LOS Worksheet
Level
of Service — Connect
vity
Minimum
Actual
Proposed
Base Connectivity.
C
A
A
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320'
Destination
Area
classification
1
Mason Street Trail
Recreational
g
A
A
2
3
4
29
SCALE: 1"=1000'
BICYCLE INFLUENCE AREA
_-f/LDELICH
4 [---ASSOCIATES 28
Pedestrian LOS Worksheet
Project Location Classification: Commercial Cooridor
Description of Destination Level of Service (minimum based on project location classification)
Applicable Destination Area street visual
Area Within 1320' Classification Directness continuity Crossings Interest & Security
AmenitiesMinimum
1
Commercial to the
north
Commercial
B
B
C
B
B
Actual
A
B
B
B
B
Proposed
A
8
B
B
B
2
Commercial to the east
Commercial
Minimum
B
B
C
I B
B
Actual
A
B
C
B
B
Proposed
A
B
C
B
B
3
south Commercial to the
s
Commercial
Minimum
B
B
C
B
B
Actual
A
8
B
8
B
Proposed
A
B
B
B
B
4
Minimum
Actual
Proposed
5
Minimum
Actual
Proposee.4
6
Minimum
Actual
Proposed
7
Minimum
Actual
Proposed
8
Minimum
Actual
Proposed
9
Minimum
Actual
Proposed
10
Minimum
Actual
Proposed
27
SCALE: 1"=1000'
PEDESTRIAN INFLUENCE AREA
m�/L-DELICH
t=ASSOCIATES 26
APPENDIX F
25
HCM 2010 TWSC 8: Access Driveway & Boardwalk
Short Total PM
Intersection
Intersection Delay; s/veh
Movement
3.8-
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Vol,veh/h
1
118
21
71
115
24
20
2
69
13
1
1
Conflicting Peds,lNhr
0
0
0
0
0
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
None
None
None
None
None
None
None
None
None
None
None
None
Storage Length
150
0
150
0
150
0
150
0
Median Width
12
12
12
12
Grade, %
0%
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
1
139
25
84
135
28
24
2
81
15
1
1
Number of Lanes
1
1
0
1
1
0
1
1
0
1
1
0
Major/Minor
Major 1
Major 2
Minor 1
Minor 2
Conflicting Flow All
164
0
0
164 0
0 472
485
151
511
482
149
Stage 1
-
-
-
- -
- 154
154
-
316
316
-
Stage 2
-
-
-
- -
- 318
331
-
195
166
-
Follow-up Headway
2.218
-
-
2.218 -
- 3.518
4.018
3.318
3.518
4.018
3.318
Pot Capacity-1 Maneuver
1414
-
-
1414 -
- 502
482
895
473
484
898
Stage 1
-
-
-
- -
- 848
770
-
695
655
-
Stage 2
-
-
-
- -
- 693
645
-
807
761
-
Time blocked -Platoon, %
0
-
-
0 -
- 0
0
0
0
0
0
Mov Capacity-1 Maneuver
1414
-
-
1414 -
- 477
453
895
409
455
898
Mov Capacity-2 Maneuver
-
-
-
- -
- 477
453
-
409
455
-
Stage 1
-
- 847
769
-
695
616
Stage 2
-
- 650
607
-
731
760
Approach
EB
WB
NB
SB
HCM Control Delay, s
0.1
2.6
10.4
13.6
HCM LOS
-
-
B
B
Minor Lane / Major Mvmt
NBLn1
NBLn2
EBL EBT
EBR WBL
WBT
WBR
SBLn1
SBLn2
Cap,veh/h
477
813
1414 -
- 1414
-
-
409
455
HCM Control Delay, s
12.8
10
7.548 -
- 7.706
-
-
14
13
HCM Lane V/C Ratio
0.03
0.11
0.00 -
- 0.06
-
-
0.03
0.02
HCM Lane LOS
8
B
A -
- A
-
-
B
B
HCM 95th-tile Q, veh
0.1
0.4
0.0 -
- 0.2
-
-
0.1
0.1
Notes
- : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
24
HCM 2010 TWSC 4: Mason & Access
Short Total PM
Intersection
Intersection Delay, s/veh 2.3
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Vol, veh/h
7
2
11
21
0
62
3
319
26
35
323
5
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
0
0
0
0
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Free
Free
Free
Free
Free
Free
RT Channelized
None
None
None
None
None
None
None
None
None
None
None
None
Storage Length
0
0
0
0
0
0
0
0
Median Width
0
0
0
0
Grade, %
0%
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
8
2
13
25
0
73
4
375
31
41
380
6
Number of Lanes
0
1
0
0
1
0
0
1
0
0
1
0
Major/Minor
Minor 2
Minor 1
Major 1
Major 2
Conflicting Flow All
899
878
383
871
866
391
386
0
0
406
0
0
Stage 1
465
465
-
398
398
-
-
-
-
-
-
-
Stage 2
434
413
-
473
468
-
-
-
-
-
-
-
Follow-up Headway
3.518
4.018
3.318
3.518
4.018
3.318
2.218
-
-
2.218
-
-
Pot Capacity-1 Maneuver
260
287
664
271
291
658
1172
-
-
1153
-
-
Stage 1
578
563
-
628
603
-
-
-
-
-
-
-
Stage 2
600
594
-
572
561
-
-
-
-
-
-
-
Time blocked -Platoon, %
0
0
0
0
0
0
0
-
-
0
-
-
Mov Capacity-1 Maneuver
223
273
664
254
277
658
1172
-
-
1153
-
-
Mov Capacity-2 Maneuver
223
273
-
254
277
-
-
-
-
-
-
-
Stage 1
576
538
-
625
601
Stage 2
531
592
-
533
536
Approach
EB
WB
NB
SB
HCM Control Delay, s
15.6
14.7
0.1
0.8
HCM LOS
C
B
-
-
Minor Lane / Major Mvmt
NBL
NBT
NBR
EBLn1
WBLn1
SBL
SBT
SBR
Cap, veh/h
1172
-
-
362
469
1153
-
HCM Control Delay, s
8.081
0
-
15.6
14.7
8.238
0
HCM Lane WC Ratio
0.00
-
-
0.07
0.21
0.04
-
HCM Lane LOS
A
A
-
C
B
A
A
HCM 95th-tile Q, veh
0.0
-
0.2
0.8
0.1
Notes
— : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
23
HCM 2010 TWSC 3: Mason & Boardwalk
Short Total PM
Intersection
Intersection Delay, s/veh 3.2
Movement
WBL
WBR
NBT
NBR
SBL
SBT
Vol, veh/h
35
103
362
26
106
328
Conflicting Peds, Whr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
None
None
None
None
None
None
Storage Length
150
0
0
150
Median Width
12
12
12
Grade, %
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
Mvmt Flow
41
121
426
31
125
386
Number of Lanes
1
1
1
0
1
1
Major/Minor
Major 1
Major 2
Conflicting Flow All
1076
441
0
0
456
0
Stage 1
441
-
-
-
-
-
Stage 2
635
-
-
-
-
-
Follow-up Headway
3.518
3.318
-
-
2.218
-
Pot Capacity-1 Maneuver
243
616
-
-
1105
-
Stage 1
648
-
-
-
-
-
Stage 2
528
-
-
-
-
-
Time blocked -Platoon, %
0
0
-
-
0
-
Mov Capacity-1 Maneuver
216
616
-
-
1105
-
Mov Capacity-2 Maneuver
216
-
-
Stage 1
648
Stage 2
468
Approach
WB
NB
SB
HCM Control Delay, s
15.7
0
2.1
HCM LOS
C
-
-
Minor Lane / Major Mvmt
NBT NBR
WBLn1
WBLn2
SBL
SBT
Cap,veh/h
- -
216
616
1105
-
HCM Control Delay, s
- -
25.6
12.3
8.672
-
HCM Lane V/C Ratio
- -
0.19
0.20
0.11
-
HCM Lane LOS
- -
D
B
A
-
HCM 95th-tile Q, veh
- -
0.7
0.7
0.4
-
Notes
- : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
22
APPENDIX E
Ml
HCM 2010 TWSC 8: Access Driveway & Boardwalk
Short Background PM
Intersection
Intersection Delay, slveh 3.3
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Vol,veh/h
1
114
12
57
110
24
12
2
53
13
1
1
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
None
None
None
None
None
None
None
None
None
None
None
None
Storage Length
150
0
150
0
150
0
150
0
Median Width
12
12
12
12
Grade, %
0%
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
1
134
14
67
129
28
14
2
62
15
1
1
Number of Lanes
1
1
0
1
1
0
1
1
0
1
1
0
Major/Minor
Major 1
Major 2
Minor 1
Minor 2
Conflicting Flow All
158
0
0
148
0
0
423
436
141
454
429
144
Stage 1
-
-
-
-
-
-
144
144
-
278
278
-
Stage 2
-
-
-
-
-
-
279
292
-
176
151
-
Follow-up Headway
2.218
-
-
2.218
-
-
3.518
4.018
3.318
3.518
4.018
3.318
Pot Capacity-1 Maneuver
1422
-
-
1434
-
-
541
514
907
516
518
903
Stage 1
-
-
-
-
-
-
859
778
-
728
680
-
Stage 2
-
-
-
-
-
-
728
671
-
826
772
-
Time blocked -Platoon, %
0
-
-
0
-
-
0
0
0
0
0
0
Mov Capacity-1 Maneuver
1422
-
-
1434
-
-
520
490
907
461
493
903
Mov Capacity-2 Maneuver
-
-
-
-
-
-
520
490
-
461
493
-
Stage 1
-
-
858
777
-
727
648
Stage 2
-
-
692
640
-
766
771
Approach
EB
WB
NB
SB
HCM Control Delay, s
0.1
2.3
10
12.7
HCM LOS
-
-
B
B
Minor Lane / Major Mvmt
NBLn1
NBLn2
EBL
EBT
EBR
WBL
WBT
WBR
SBLn1
SBLn2
Cap,veh/h
520
840
1422
-
-
1434
-
-
461
505
HCM Control Delay, s
12.1
9.7
7.534
-
-
7.634
-
-
13
12.2
HCM Lane V/C Ratio
0.02
0.08
0.00
-
-
0.05
-
-
0.02
0.01
HCM Lane LOS
B
A
A
-
-
A
-
-
B
B
HCM 95th-tile Q, veh
0.1
0.3
0.0
-
-
0.1
-
-
0.1
0.0
Notes
: Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
20
HCM 2010 TWSC 4: Mason & Access
Short Background PM
Intersection
Intersection Delay, s/veh 1.5
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Vol, veh/h
7
2
11
10
0
41
3
319
19
15
323
5
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
0
0
0
0
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Free
Free
Free
Free
Free
Free
RT Channelized
None
None
None
None
None
None
None
None
None
None
None
None
Storage Length
0
0
0
0
0
0
0
0
Median Width
0
0
0
0
Grade, %
0%
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
8
2
13
12
0
48
4
375
22
18
380
6
Number of Lanes
0
1
0
0
1
0
0
1
0
0
1
0
Major/Minor
Minor 2
Minor 1
Major 1
Major 2
Conflicting Flow All
836
823
383
820
815
386
386
0
0
398
0
0
Stage 1
418
418
-
394
394
-
-
-
-
-
-
-
Stage 2
418
405
-
426
421
-
-
-
-
-
-
-
Follow-up Headway
3.518
4.018
3.318
3.518
4.018
3.318
2.218
-
-
2.218
-
-
Pot Capacity-1 Maneuver
287
309
664
294
312
662
1172
-
-
1161
-
-
Stage 1
612
591
-
631
605
-
-
-
-
-
-
-
Stage 2
612
598
-
606
589
-
-
-
-
-
-
-
Time blocked -Platoon, %
0
0
0
0
0
0
0
-
-
0
-
-
Mov Capacity-1 Maneuver
261
302
664
281
305
662
1172
-
-
1161
-
-
Mov Capacity-2 Maneuver
261
302
-
281
305
-
-
-
-
-
-
-
Stage 1
610
579
-
628
603
Stage 2
565
596
-
580
577
Approach
EB
WB
NB
SB
HCM Control Delay, s
14.6
12.8
0.1
0.4
HCM LOS
B
B
-
-
Minor Lane / Major Mvmt
NBL
NBT
NBR
EBLn1
WBLn1
SBL
SBT
SBR
Cap,veh/h
1172
-
-
400
523
1161
-
HCM Control Delay, s
8.081
0
-
14.6
12.8
8.149
0
HCM Lane V/C Ratio
0.00
-
-
0.06
0.12
0.01
-
HCM Lane LOS
A
A
-
B
B
A
A
HCM 95th-tile Q, veh
0.0
-
0.2
0.4
0.0
Notes
- : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
19
HCM 2010 TWSC 3: Mason & Boardwalk
Short Background PM
Intersection
Intersection Delay, s/veh
3
Movement
WBL
WBR
NBT
NBR
SBL
SBT
Vol, veh/h
30
95
345
22
100
313
Conflicting Peds, Whr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
None
None
None
None
None
None
Storage Length
150
0
0
150
Median Width
12
12
12
Grade, %
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
Mvmt Flow
35
112
406
26
118
368
Number of Lanes
1
1
1
0
1
1
Major/Minor
Major 1
Major 2
Conflicting Flow All
1023
419
0
0
432
0
Stage 1
419
-
-
-
-
-
Stage 2
604
-
-
-
-
-
Follow-up Headway
3.518
3.318
-
-
2.218
-
Pot Capacity-1 Maneuver
261
634
-
-
1128
-
Stage 1
664
-
-
-
-
-
Stage 2
546
-
-
-
-
-
Time blocked -Platoon, %
0
0
-
-
0
-
Mov Capacity-1 Maneuver
234
634
-
-
1128
-
Mov Capacity-2 Maneuver
234
-
-
-
-
-
Stage 1
664
Stage 2
489
Approach
WB
NS
SB
HCM Control Delay, s
14.6
0
2.1
HCM LOS
B
-
-
Minor Lane / Major Mvmt
NBT NBR
WBLn1
WBLn2
SBL
SBT
Cap, veh/h
- -
234
634
1128
-
HCM Control Delay, s
- -
23.1
11.9
8.563
-
HCM Lane V/C Ratio
- -
0.15
0.18
0.10
-
HCM Lane LOS
- -
C
B
A
-
HCM 95th-tile C, veh
- -
0.5
0.6
0.3
-
Notes
— : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
18
APPENDIX D
17
Table 4-3
Fort Collins (City Limits)
Motor Vehicle LOS Standards (Intersections)
Land Use (from structure plan)
Other corridors within:
Low density
Intersection type
Commercial
Mixed use
mixed use
All other
corridors
districts
residential
areas
Signalized intersections
D
E*
D
D
(overall)
Any Leg
E
E
D
E
Any Movement
E
E
D
E
Stop sign control
N/A
F**
F**
E
(arterial/collector or local —
any approach leg)
Stop sign control
N/A
C
C
C
(collector/local—any
approach leg)
mitigating measures required
considered normal in an urban environment
In
UNSIGNALIZED INTERSECTIONS
Level -of -Service
Average Total Delay
sec/veh
A
<10
B
>10and <15
c
> 15 and < 25
D
> 25 and < 35
E
> 35 and < 50
F
> 50
15
HCM 2010 TWSC 8: Access Driveway & Boardwalk
Recent PM
Intersection
Intersection Delay, s/veh 3.4
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Vol, vehm
1
106
12
57
102
24
12
2
53
13
1
1
Conflicting Peds, Whr
0
0
0
0
0
0
0
0
0
0
0
0
Sign Control
Free
Free
Free
Free
Free
Free
Stop
Stop
Stop
Stop
Stop
Stop
RT Channelized
None
None
None
None
None
None
None
None
None
None
None
None
Storage Length
150
0
150
0
150
0
150
0
Median Width
12
12
12
12
Grade, %
0%
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
1
125
14
67
120
28
14
2
62
15
1
1
Number of Lanes
1
1
0
1
1
0
1
1
0
1
1
0
Major/Minor
Major 1
Major 2
Minor 1
Minor 2
Conflicting Flow All
148
0
0
139
0
0
403
416
132
434
409
134
Stage 1
-
-
-
-
-
-
134
134
-
268
268
-
Stage 2
-
-
-
-
-
-
269
282
-
166
141
-
Follow-up Headway
2.218
-
-
2.218
-
-
3.518
4.018
3.318
3.518
4.018
3.318
Pot Capacity-1 Maneuver
1434
-
-
1445
-
-
558
527
917
532
532
915
Stage 1
-
-
-
-
-
-
869
785
-
738
687
-
Stage 2
-
-
-
-
-
-
737
678
-
836
780
-
Time blocked -Platoon, %
0
-
-
0
-
-
0
0
0
0
0
0
Mov Capacity-1 Maneuver
1434
-
-
1445
-
-
536
502
917
476
507
915
Mov Capacity-2 Maneuver
-
-
-
-
-
-
536
502
-
476
507
-
Stage 1
-
-
868
784
-
737
655
Stage 2
-
-
701
647
-
776
779
Approach
EB
WB
NB
SB
HCM Control Delay, s
0.1
2.4
9.9
12.4
HCM LOS
-
-
A
B
Minor Lane / Major Mvmt
NBLnl
NBLn2
EBL
EBT
EBR
WBL
WBT
WBR
SBLn1
SBLn2
Cap,veh/h
536
852
1434
-
-
1445
-
-
476
520
HCM Control Delay, s
11.8
9.6
7.513
-
-
7.613
-
-
12.7
12
HCM Lane V/C Ratio
0.02
0.08
0.00
-
-
0.05
-
-
0.02
0.01
HCM Lane LOS
B
A
A
-
-
A
-
-
B
B
HCM 95th-file Q, veh
0.1
0.3
0.0
-
-
0.1
-
-
0.1
0.0
Notes
- : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
14
HCM 2010 TWSC 4: Mason & Access
Recent PM
Intersection
Intersection Delay, s/veh 1.5
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Vol,veh/h
7
2
11
10
0
41
3
293
19
15
289
5
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
0
0
0
0
Sign Control
Stop
Stop
Stop
Stop
Stop
Stop
Free
Free
Free
Free
Free
Free
RT Channelized
None
None
None
None
None
None
None
None
None
None
None
None
Storage Length
0
0
0
0
0
0
0
0
Median Width
0
0
0
0
Grade, %
0%
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
2
2
2
2
2
2
Mvmt Flow
8
2
13
12
0
48
4
345
22
18
340
6
Number of Lanes
0
1
0
0
1
0
0
1
0
0
1
0
Major/Minor
Minor 2
Minor 1
Major 1
Major 2
Conflicting Flow All
765
752
343
749
744
356
346
0
0
367
0
0
Stage 1
378
378
-
363
363
-
-
-
-
-
-
-
Stage 2
387
374
-
386
381
-
-
-
-
-
-
-
Follow-up Headway
3.518
4.018
3.318
3.518
4.018
3.318
2.218
-
-
2.218
-
-
Pot Capacity-1 Maneuver
320
339
700
328
343
688
1213
-
-
1192
-
-
Stage 1
644
615
-
656
625
-
-
-
-
-
-
-
Stage 2
637
618
-
637
613
-
-
-
-
-
-
-
Time blocked -Platoon, %
0
0
0
0
0
0
0
-
-
0
-
-
Mov Capacity-1 Maneuver
292
331
700
315
335
688
1213
-
-
1192
-
-
Mov Capacity-2 Maneuver
292
331
-
315
335
-
-
-
-
-
-
-
Stage 1
641
603
-
653
623
Stage 2
590
616
-
611
601
Approach
EB
WB
NB
SB
HCM Control Delay, s
13.7
12.2
0.1
0.4
HCM LOS
B
B
-
-
Minor Lane / Major Mvmt
NBL
NBT
NBR
EBLn1
WBLnl
SBL
SBT
SBR
Cap, veh/h
1213
-
-
437
558
1192
-
HCM Control Delay, s
7.977
0
-
13.7
12.2
8.066
0
HCM Lane V/C Ratio
0.00
-
-
0.05
0.11
0.01
-
HCM Lane LOS
A
A
-
B
B
A
A
HCM 95th-tile Q, veh
0.0
-
0.2
0.4
0.0
Notes
- : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
13
HCM 2010 TWSC 3: Mason & Boardwalk
Recent PM
Intersection
Intersection Delay, s/veh
2.8
Movement
WBL
WBR
NBT
NBR
SBL
SBT
Vol, veh/h
28
89
321
21
93
291
Conflicting Peds, ff/hr
0
0
0
0
0
0
Sign Control
Stop
Stop
Free
Free
Free
Free
RT Channelized
None
None
None
None
None
None
Storage Length
150
0
0
150
Median Width
12
12
12
Grade, %
0%
0%
0%
Peak Hour Factor
0.85
0.85
0.85
0.85
0.85
0.85
Heavy Vehicles, %
2
2
2
2
2
2
Mvmt Flow
33
105
378
25
109
342
Number of Lanes
1
1
1
0
1
1
Major/Minor
Major 1
Major 2
Conflicting Flow All
951
390
0
0
402
0
Stage 1
390
-
-
-
-
-
Stage 2
561
-
-
-
-
-
Follow-up Headway
3.518
3.318
-
-
2.218
-
Pot Capacity-1 Maneuver
288
658
-
-
1157
-
Stage 1
684
-
-
-
-
-
Stage 2
571
-
-
-
-
-
Time blocked -Platoon, %
0
0
-
-
0
-
Mov Capacity-1 Maneuver
261
658
-
-
1157
-
Mov Capacity-2 Maneuver
261
-
-
-
-
-
Stage 1
684
Stage 2
517
Approach
WB
NB
SB
HCM Control Delay, s
13.7
0
2
HCM LOS
B
-
-
Minor Lane / Major Mvmt
NBT NBR
WBLn1
WBLn2
SBL
SBT
Cap, veh/h
- -
261
658
1157
-
HCM Control Delay, s
- -
20.8
11.5
8.436
-
HCM Lane V/C Ratio
- -
0.13
0.16
0.10
-
HCM Lane LOS
- -
C
B
A
-
HCM 95th-tile Q, veh
- -
0.4
0.6
0.3
-
Notes
: Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error: Computation Not Defined
Synchro 8 Light Report
12
APPENDIX C
11
0
R = right turn
S = straight
L = left turn
MATTHEW J. DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND,CO 80538
Phone: 970 669.2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/5/2013 Observer: Sue
Day: Tuesday Jurisdiction: Fort Collins
Intersection: Boardwalk/Access Driveway
Time
Begins
Northbound: Access
Southbound: Access
Total
north/south
Eastbound: Boardwalk
Westbound: Boardwalk
Total
east/west
Total
All
L
S
R
Total
L
S
R
Total
L
S
R
Total
L
S
R
Total
7:30
0
0
0
0
0
0
0
7:45
0
I 0
0
0
0
0
0
8:00
0
j 0
0
0
0
0
0
8:15
0
0
0
0
0
0
0
7:30.8:30
0
1 0
1 0
0
0
1 0
1 0
0
0
0
1 0
1 0
0
0
1 0
1 0
0
0
[77707
PHF
n/a
n/a
nla
n/a
4:30
3
0
12
15
2
0
0
2
17
0
28
5
33
10
14
4
28
61
78
4:45
2
0
12
14
2
0
0
2
16
0
24
1
25
14
32
6
52
77
93
5:00
2
1
14
17
3
1
0
4
21
0
23
3
26
15
23
5
43
69
90
5:15
4
1
11
16
5
0
0
5
21
0
23
2
25
14
26
7
47
72
93
4:30.5:30
11
1 2
1 49
62
12
1 1
1 0
13
75
0
1 98
1 11
109
53
1 95
1 22
170
279
354
PHF
0.91
0.65
0.83
0.82
0
R = right turn
S = straight
L = left turn
MATTHEW J. DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: 970 669.2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/612013 Observer: Sue
Day: Wednesday Jurisdiction: Fort Collins
Intersection: Mason/Access Driveway
Time
Begins
Northbound: Mason
Southbound: Mason
Total
northisouth
Eastbound: Access
Westbound: Access
Total
eastlwest
Total
All
L
S
R
Total
L
S
R
Total
L
S
R
Total
L
S
R
Total
7:30
0
0
0
0
0
0
0
7:45
0
0
0
0
0
0
0
8:00
0
0
0
0
0
0
0
8:15
0
0
1 0
0
0
0
O
7:30.8:30
0
1 0
1 0
0
0
1 0
1 0
0
0
0
1 0
1 0
0
0
1 0
1 0
0
0
0
PHF
nla
nla
nla
nla
4:30
2
84
5
91
5
80
0
85
176
3
0
3
6
1
0
11
12
18
194
4:45
1
69
8
78
1
98
1
100
178
0
2
2
4
5
0
8
13
17
195
5:00
0
85
5
90
5
79
3
87
177
3
0
4
7
3
0
9
12
19
196
5:15
0
73
2
75
5
72
1
78
153
1
0
3
4
2
0
15
17
21
174
4:30.5:30
1 3
1 311
1 20
334
16
329
1 5
1 350
1 684
1 7
1 2
1 12
1 21
1 11
1 0
1 43
1 54
75
759
PHF
0.92
0.88
0.75
0.79
u
R = right turn
S = straight
L = left turn
MATTHEW J. DELICH, P.E.
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: 970 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/512013 Observer: Sue
Day: Tuesday Jurisdiction: Fort Collins
Intersection: Boardwalk/Mason
Time
Begins
Northbound: Mason
Southbound: Mason
Total
north/south
Eastbound:
Westbound: Boardwalk
Total
east/west
Total
All
L
S
R
Total
L
S
I R
Total
L
S
R
Total
L
S
R
Total
7:30
0
0
0
0
0
0
0
7:45
0
I 0
0
0
0
0
0
8:00
0
0
0
0
0
0
0
8:15
0
0
0
0
0
0
0
7:30.8:30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PHF
nla
nla
nla
nla
4:30
69
8
77
22
60
82
159
0
7
11
18
18
177
4:45
69
2
71
23
62
85
156
0
6
29
35
35
191
5:00
84
5
89
20
71
91
180
0
8
17
25
25
205
5:15
79
5
84
19
69
88
172
0
4
26
30
30
202
4:30.5:30
1 0
1 301
1 20
1 321
1 84
262
1 0
1 346
1 667
1 0
1 0
1 0
1 0
1 25
1 0
1 83
1 108
1 108
775
PHF
0.9
0.95
nla
0.77
APPENDIX B
bf'�;.TiCIBUTID.ti
>uALk-'
i.
�07 A
Ees-Wr440
17. AU
6.6) Ks
fA)
our- 63�po
6.0 (CobL
l %z7. z
L. 0 7- 2
=T4iL
-DA��`'
`rP M
s. �7 <Sr (CZ-6
(44.3z) = z44-
= z-4x zi.48��
Cater
?/Ll o q
io7z
f Al — S
OUr- S(v
5
PROJECT DEVELOPMENT PLAN
)WALK CROSSING AT MASON STREET
I
I
I
I
x
A •.jj
s-
.IIL-\\..M1
i.�
_
_—
I�i11nL�ailll
�'/
O
O1
t
a vu�
SPACM
b0
I . �� I e ...oa w.•.. o„a can
I I i si L w9h ucRr
T. RASH 1111LO W
R RM
SATE 1�c A Q
ry �' m' K'CElS Rqb
SITE PLAN VIN
scar r - m-c•
wa a
E=F�
0 15' 30' 60'
No Text
Chapter 4 — Attachments
Attachment A
Transportation Impact Study
Base Assumptions
Project Information
Project Name 12r,{V''�
Project Location >>:e,
TIS Assumptions r
Type of Study
Full:>,
Interme�#i'ate:lr�f� ,
Study Area Boundaries
North: <i��t fir r<
South:rr_az,7'-%kccs
West:%i ICJ
Study Years
Short Range: -7 ,
c• �I
Lon, Range: ,-��
Future Traffic Growth Rate
1 /. S n: i� ° �✓J tx '
%l =t� L,A; �
Study Intersections
I
1. All access drives
5.
LKMIA
3.
7.
1
!
4.
[Ti Period for Studv
4:00-6:00
Sat Noon: ti!
Trip Generation Rates
Trip Adjustment Factors
I
Passby: / Captive
/V A Market: tit
Overall Trip Distribution
SEE ATTACHED SKETCH
Mode Split Assumptions
Committed Roadway Improvements
Other Traffic Studies
1 ! t ,, WL C i=LI !
%
Areas Requiring Special Study
y r
.i-Il l• IG �t a /•f' �! r" tr1 f,'<<i:l 144
GT�:s ftst-9
Date: __'
Traffic Engineer
Local Entity Engineer: %
f-� f'7'Tf 'l L�Sr.s
Y {7
{
Page 4-34 Larimer County Urban Area Street Standards — Repealed and Reenacted April 1, 2po7
Adnpled by Latimer County, City of Loveland, City of Fort Collins
2
APPENDIX A
c
0
U
m
2
Boardwalk Drive
-IY
Access Driveway
SHORT RANGE (2018) GEOMETRY
—�14—DELICH
ASSOCIATES
A&
N
f— - Denotes Lane
0
Figure.9
Boardwalk Crossing TIS, March 2013
TABLE 4
Short Range (2018) Total Peak Hour Operation
Intersection
Movement
Level of Service
PM
Mason/Boardwalk
(stop sign)
WB LT
D
WB RT
B
WB APPROACH
C
SB LT
A
Mason/Access Driveway
(stop sign)
NB LT/T/RT
A
EB LT/T/RT
C
WB LT/T/RT
B
SB LT/T/RT
A
Boardwalk/Access Driveway
(stop sign)
NB LT
B
NB T/RT
B
NB APPROACH
B
EB LT
A
WB LT
A
SB LT
B
SB T/RT
B
SB APPROACH
B
/I LDELICH Boardwalk Crossing TIS, March 2013
-71 r=ASSOCIATES
C1400 o 103
1 � � 35
N
N
w
C
O
(n
m
►EI
co
�n co co62
21
2����
11 M rn rn
N
M
Boardwalk Drive
135 —�
Access Driveway
N
PM
Cl) 24
115
136 + 71
1�
O 118—
21 --"k N co
>.
f0
X
W
�[
O
C
f0
N
N
m
U
U
SHORT RANGE (2018) TOTAL
AFTERNOON PEAK HOUR TRAFFIC Figure 8
—f/LDELICH Boardwalk Crossing TIS, March 2013
1 f=ASSOCIATES
TABLE 3
Short Range (2018) Background Peak Hour Operation
Intersection
Movement
Level of Service
PM
Mason/Boardwalk
(stop sign)
WB LT
C
WB RT
B
WB APPROACH
B
A
SB LT
Mason/Access Driveway
(stop sign)
NB LT/T/RT
A
EB LTfr/RT
B
WB LTfr/RT
B
SB LTfr/RT
A
Boardwalk/Access Driveway
(stop sign)
NB LT
B
NB T/RT
A
NB APPROACH
B
EB LT
A
WB LT
A
SB LT
B
SB T/RT
B
SB APPROACH
B
// L—DELICH Boardwalk Crossing TIS, March 2013
-7,1 rASSOCIATES
0
95
30
V N
M
w
N
N
L
W
c
0
N
m
L
ce)
Ln Ce) 41
10
2����'
11 � r' 1 rn
cM
f 123
Boardwalk Drive
122 — I )
cli Lr)
Access Driveway
..
X
W
Y
C
m
m
SHORT RANGE (2018) BACKGROUND
AFTERNOON PEAK HOUR TRAFFIC
N
--ow— PM
M 24
-t-110
r �57
57
114 i N N m
"'
Figure 7
—�1 1—DELICH Boardwalk Crossing TIS, March 2013
j r`ASSOCIATES
LO
rn �$
�5
f r
^Y`
^W,
W
L
Y
U)
C
O
N
m
2
O
: N 21
1 \ �11
Boardwalk Drive
13 —►
Access Driveway
f 13
SITE GENERATED AFTERNOON
PEAK HOUR TRAFFIC
—�14—DELICH
'VI ASSOCIATES
f PM
—4— 5
/-14
4
9 ao co
T
2
Figure 6
Boardwalk Crossing TIS, March 2013
45%
N
N
C
O
N
m
2
20%
Boardwalk Drive
SITE
Access Driveway
TRIP DISTRIBUTION
-- J —DELICH
,/ rASSOCIATES
4
N
35%
H
91
m
X
j
W
Y
C
m
N
m
�
U
U
2 go
Figure 5
Boardwalk Crossing TIS, March 2013
PROJECT DEVELOPMENT PLAN
)WALK CROSSING AT MASON STREET
DRIVE
ifA—= �f.f M'r1
— E ��N! fc Y � o �Y• rPM1i�Y�
fora
AMM
SITE PLAN
SITE PLAN
M
Figure 4
-// L-DELICH Boardwalk Crossing TIS, March 2013
-7,1 [-ASSOCIATES
TABLE 1
Current Peak Hour Operation
Intersection
Movement
Level of Service
PM
Mason/Boardwalk
(stop sign)
WB LT
C
WB RT
B
WB APPROACH
B
SB LT
A
Mason/Access Driveway
(stop sign)
NB LT/T/RT
A
EB LT/T/RT
B
WB LT/T/RT
B
SB LTlf/RT
A
Boardwalk/Access Driveway
(stop sign)
NB LT
B
NB T/RT
_
A
NB APPROACH
A
EB LT
A
WB LT
A
SB LT
B
SB T/RT
B
SB APPROACH
B
TABLE 2
Trip Generation
Code
Use
Size
AWDTE
AM Peak Hour
PM Peak Hour
Rate
Trips
Rate
I In
Rate
Out
Rate
I In
Rate
Out
710
General Office
6.0 KSF
11.03
66
0.25
2
1.24
7
932
Sit -Down Restaurant
6.0 KSF
127.15
762
5.95
36
4.86
29
PL
Retail
5.5 KSF
44.32
244
Eq.
15
Eq.
20
Total
1072
53
56
--// LDELICH Boardwalk Crossing TIS, March 2013
-7,1 rASSOCIATES
0) M
14 rn 89
28
N
N
L
c
0
N
m
C
Ln N �
1
IC%1 r
Ce)
41
0
�10
t r
M cM W
N
f- 115
Boardwalk Drive
114 — I N � r
L(�
Access Driveway
w
X
W
Y
C
m
in
BALANCED RECENT AFTERNOON
PEAK HOUR TRAFFIC
-/JL-DELICH
rASSOCIATES
N
f PM
co
Eq
Figure 3
Boardwalk Crossing TIS, March 2013
24
102
57
LO
N � 83
1 i 25
Y
W
L
V
C
O
N
m
t
7
2 —
12
f�
M N
43
� 0
11
CO � o
� N
M
f 106
Boardwalk Drive
104 —a— I � r
N LO
Access Driveway
A&
N
f PM
N 22
�— 53
53
8 9����
11
Lo
RECENT AFTERNOON
PEAK HOUR TRAFFIC Figure 2
--/1 4--DELICH Boardwalk Crossing TIS, March 2013
(-ASSOCIATES
SCALE: 1"=1000'
SITE LOCATION
t-�/L-DELICH
-71 rASSOCIATES
Figure 1
Boardwalk Crossing TIS, March 2013
Figure 9 shows the short range (2018) geometry at the Mason/Boardwalk,
Mason/Access Driveway, and Boardwalk/Access Driveway intersections. Since Mason
Street is an arterial street, according to the "Larimer County Urban Area Street
Standards" (LCUASS), left -turn lanes are required on all arterial streets. Mason Street
was completed prior to adoption of LCUASS. There are left -turn lanes provided at three
locations: 1) Northbound approaching Horsetooth Road; 2) Southbound approaching
Harmony Road; and 3) Southbound approaching Boardwalk Drive. Mason Street is
approximately 40 feet wide, curb -to -curb. If a left -turn lane were striped for its entire
length, the bike lanes would be eliminated. It is suggested that the existing geometry
remain.
The Boardwalk Crossing site is in an area within which the City requires
pedestrian and bicycle level of service evaluations. Appendix F shows a map of the
area that is within 1320 feet of Boardwalk Crossing. The Boardwalk Crossing site is
located within an area termed as "commercial corridor," which sets the level of service
threshold at LOS B for all measured categories except street crossing, which is C.
There are three destination areas within 1320 feet of the proposed Boardwalk Crossing:
1) the commercial area to the north of the site, 2) the commercial area to the east of the
site, and 3) the commercial area to the south of the site. Boardwalk Crossing will add
sidewalk adjacent to their property. Appendix F contains a Pedestrian LOS Worksheet.
Acceptable pedestrian level of service will be achieved for all pedestrian destinations.
Appendix F shows a map of the area that is within 1320 feet of Boardwalk
Crossing. Based upon Fort Collins bicycle LOS criteria, there is one bicycle
destinations: Mason Street Trail to the west. The Bicycle LOS Worksheet is provided in
Appendix F. This site connects directly to bike lanes on Mason Street and Boardwalk,
which achieves level of service B, as shown in Appendix F.
Currently, this area is served by Transfort Route 1 and Flex. It is expected that
transit level of service will be acceptable. This site is 300-400 feet from the Mason
Street BRT corridor. The nearest station will be to the south at Troutman Parkway,
approximately 0.25 miles away. There will also be a station at Horsetooth Road to the
north.
It is concluded that, with development of Boardwalk Crossing, the future level of
service at the Mason/Boardwalk, Mason/Access Driveway, and Boardwalk/Access
Driveway intersections will be acceptable. No new auxiliary lanes are required at the
key intersections. The level of service for pedestrian, bicycle, and transit modes will be
acceptable.
---�/, L—DELICH Boardwalk Crossing TIS, March 2013
rASSOCIATES
westbound left -turn lane and a through/right-turn lane in each direction. There is stop
sign control at the Boardwalk/Access Driveway intersection on the Access Driveway.
Boardwalk Drive has a posted speed of 30 mph.
Figure 2 shows recent afternoon peak hour counts at the Mason/Boardwalk,
Mason/Access Driveway, and Boardwalk/Access Driveway intersections. The count
data was obtained in March 2013. Raw traffic data is provided in Appendix B. Since
the traffic counts were obtained on different days, they were balanced between
intersections and are shown in Figure 3. Table 1 shows the current afternoon peak
hour operation of the Mason/Boardwalk, Mason/ Access Driveway, and
Boardwalk/Access Driveway intersections. Calculation forms are provided in Appendix
C. A description of level of service for unsignalized intersections from the 2010 Highway
Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) are also provided in Appendix C. The Boardwalk Crossing site is in an
area termed "Commercial Corridor" on the Fort Collins Structure Plan. In areas termed
"Commercial Corridor," there is no minimum level service criteria at unsignalized
intersections along arterial streets during the peak hours. The key intersections operate
acceptably during the afternoon peak hour.
Figure 4 shows the site plan for Boardwalk Crossing. Trip Generation, 9th
Edition, ITE was used as the reference document in calculating the trip generation.
Table 2 shows the trip generation for Boardwalk Crossing. This trip generation was
discussed and agreed to in the scoping meeting. The trip generation for Boardwalk
Crossing is calculated at: 1072 daily trip ends and 109 afternoon peak hour trip ends.
The trip distribution for this site is shown in Figure 5. The trip distribution was
determined using the existing traffic counts, knowledge of the existing and planned
street system, development trends, and engineering judgment. Figure 6 shows the site
generated traffic assignment of Boardwalk Crossing.
Figure 7 shows the short range (2018) background afternoon peak hour traffic at
the Mason/Boardwalk, Mason/Access Driveway, and Boardwalk/Access Driveway
intersections. Background traffic volume forecasts for the short range (2018) future
were obtained by reviewing traffic studies for other developments in this area and
reviewing historic counts in the area. The counted traffic was increased at the rate of
1.5 percent per year. Table 3 shows the short range (2018) background afternoon peak
hour operation at the Mason/Boardwalk, Mason/Access Driveway, and
Boardwalk/Access Driveway intersections. Calculation forms are provided in Appendix
D. The Mason/Boardwalk, Mason/Access Driveway, and Boardwalk/Access Driveway
intersections will operate acceptably with the existing control and geometry.
Figure 8 shows the short range (2018) total peak hour traffic at the
Mason/Boardwalk, Mason/Access Driveway, and Boardwalk/Access Driveway
intersections. Table 4 shows the short range (2018) total peak hour operation at the
Mason/Boardwalk, Mason/Access Driveway, and Boardwalk/Access Driveway
intersections. Calculation forms are provided in Appendix E. The Mason/Boardwalk,
Mason/Access Driveway, and Boardwalk/Access Driveway intersections will operate
acceptably during the peak hours.
--// LDELICH Boardwalk Crossing TIS, March 2013
�� �==ASSOCIATES
DELICH ASSOCIATES Traffic & Transportation Engineering
2272 Glen Haven Drive Loveland, Colorado 80538
Phone: (970) 669-2061 Fax: (970) 669-5034 "71 11 r
MEMORANDUM
TO: George HolterNandi Deines, Boardwalk Crossing Ltd.
Steve Steinbicker, Architecture West
Ward Stanford, City of Fort Collins Traffic Engineering
FROM: Joe/Matt Delich
DATE: March 15, 2013
SUBJECT: Boardwalk Crossing Transportation Impact Study
(File: 1318ME01)
This memorandum addresses the transportation impacts of the proposed
Boardwalk Crossing commercial- development. Boardwalk Crossing is located in the
southeast quadrant of the Mason/Boardwalk intersection in Fort Collins. The site
location is shown in Figure 1. The site is currently vacant. The site has two existing
accesses: one to Boardwalk Drive and one to a 30' private access driveway that
connects Mason Street and College Avenue. Boardwalk Crossing will consist of 6,000
square feet of office (Lot 2A), 6,000 square feet of sit-down restaurant (Lot 2A), and
5,500 square feet of retail (Lot 2B). The scope of this study was discussed with the Fort
Collins Traffic Operations Engineer. A brief memorandum was requested. Only the
afternoon peak hour was requested to be analyzed. The Base Assumptions form is
provided in Appendix A. There are sidewalks along Mason Street and Boardwalk Drive,
except for along this site. There are bicycle lanes along Mason Street and Boardwalk
Drive. Transfort Route 1 and Flex provides two-way service on College Avenue.
Mason Street is west of (adjacent to) the proposed Boardwalk Crossing site. It is
a north -south street classified as a two-lane arterial street according to the Fort Collins
Master Street Plan. Currently, Mason Street. has a two-lane cross section. At the
Mason/Boardwalk intersection, Mason Street has a southbound left -turn lane and a
through lane in each direction. At the Mason/Access Driveway intersection, Mason
Street has all movements combined into a single lane. There is stop sign control at the-
Mason/Boardwalk and Mason/Access Driveway intersections on Boardwalk and the
Access Driveway, respectively. Mason Street has a posted speed of 30 mph.
Boardwalk Drive is north of (adjacent to) the proposed Boardwalk Crossing site.
It is a east -west street classified as a two-lane collector street, between Mason Street
and College Avenue according to the Fort Collins Master Street Plan. Currently,
Boardwalk Drive has a two-lane cross section. Boardwalk Drive only has a east leg at
the Mason/Boardwalk intersection. At the Mason/Boardwalk intersection, Boardwalk
Drive has a westbound left -turn lane and a westbound right -turn lane. At the
Boardwalk/Access Driveway intersection, Boardwalk Drive has a eastbound and