Loading...
HomeMy WebLinkAboutARCADIA AT WILLOX LANE - FDP - 5-05B - CORRESPONDENCE - (8)Zoned Size ac UE UE UE UE UE UE UE able land Interim Improvement Cost 33.79 $54,702.76 22.94 $37,137.65 13.19 $21,353.34 14.8 $23,959.78 29 $46,948.21 7 $11,332.33 1.8 $2,914.03 122.52 $198,348.10 $198,348.10 ease contact Matt Baker in Street Oversizing. Willox Lane Cost of Interim Improvements Breakout Between Properties Parcel # Address Current Owner 98353-00-005 938 W WILLOX LN CHARLES R WILLOX HOMESTEAD ONE, LLC 97022-46-702 1550 WOOD LN HAMMOND, GARY NEIL/CAROLYN ELIZABETH 98353-00-007 862 W WILLOX LN KILLION, BRIAN 98353-00-011 720 W WILLOX LN LOEHMAN, WILLIAM C 97022-00-002 719 W WILLOX LN NORTH FORT COLLINS NEIGHBORHOOD DESIGN 98354-00-018 1800 N WHITCOMB ST MORGAN HOLDINGS LLC (50),GRATEFULDV LLC (50) 98354-00-048 2025 N COLLEGE AVE MORGAN HOLDINGS LLC (50),GRATEFULDV LLC (50) Total Likely Developable Land Total Interim Improvement Estimate from East edge of Arcadia property out to College Ave. Interim Improvement Cost for each property is based on a direct proportion of developable land to total likely develops (Parcel Acres/Total Acres"Cost Estimate) For a questions regarding the Cost Estimate for this work, pie ,Ted Shepard - Cost Estimate for Interim V x_Improv_ements- _ _ Page 1 From: Dan DeLaughter To: thalopoff@jrengineering.com Date: 08/14/200610:47:41 AM Subject: Cost Estimate for Interim Willox Improvements Tim, I've attached a spreadsheet showing the applicable cost responsibilities for properties in the Willox corridor. We only used properties that were likely to redevelop within the next 10 years, based on advice from Planning and Advance Planning. All properties were zoned UE, so development potential was assumed to be uniform. Matt Baker's estimate for the street improvements, which included a saw cut, addition of shoulders and overlay from the East edge of Arcadia, out to College Ave. was $198,348.10. (Please note that this does not include any of the costs for the frontage improvements for the Arcadia property). The Arcadia portion of the responsibility was determined to be $46,948.21, although, this number could change depending on how far in the future the amount would be paid. It was calculated using a proportion of the Arcadia parcel size to total likely developable acres in the corridor. As we told you in our meeting previously, this cost could certainly be phased over the development, and the terms would be clarified in the Development Agreement language. Please feel free to call with any questions or concerns. I will send you an electronic copy of Matt's detailed estimate when he sends it to me. Thanks, -Dan CC: Averill, David; Diede, Gary; Maizland, Randy; Shepard, Ted; Wamhoff, Sheri; Wilder, Timothy