HomeMy WebLinkAboutARCADIA AT WILLOX LANE - FDP - 5-05B - CORRESPONDENCE - (5)Number: 112 Created: 9/21/2006 [9/21/06] Add the shallow sanitary sewer manhole standard detail. Detail added. Department: Zoning Issue Contact: Gary Lopez Topic: Zoning Number: 80 Created: 9/7/2006 [9/7/06] No issues Please return all of your redlined plans when you re -submit. Should you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely, Ted Shepard Chief Planner Page 10 Sanitary line at times shallower than 3.5 feet from top of pipe, please provide insulation in these instances. Maybe able to gain some depth by using only. 1 feet of drop across manholes on straight sections of pipe. Stub out sewer service for existing house out of the street. Note all locations of water lowerings, call them out on plan and profiles. Provide better detail for 12" water crossing under the railroad tracks. Show steel casing on plan view. All waterlines have been adjusted to ductile iron vv/ polywrap. All utility crossing are shown in plan and profile views. Insulation has been added to areas wl less the 3.5 feet of cover. Sewer is to shallow to stub out for existing house. All water line lowerings have been called out in plan and profiles views. Steel casing shown for waterline and a casing detail added. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterMatewater Number: 106 Created: 9/21/2006 [9/21/06] Swivel tees are required at fire hydrant locations. Swivel tees have been added Number: 107 Created: 9/21/2006 [9/21/06] Substitute a temporary fire hydrant for the blow -off at the west end of the 12-inch water main. Temporary fire hydrant added Number: 108 Created: 9/21/2006 [9/21/06] Revise the valving on the water mains as noted on the redlined plans. Valving revised pre redlines. Number: 109 Created: 9/21/2006 [9/21/06] Add steel casing pipe on the water main and sanitary sewer crossings under the 2' x 3' RBC. Steel casing pipe added. Number: 110 Created: 9/21/2006 [9/21/06] At point of connection with existing 12-inch sewer, match crowns or 3/4 points on the existing and proposed sewers. Matched. Number: 111 Created: 9/21/2006 [9/21/06] Due to the shallow san sewer depth, we will allow a 0.1 ft drop for straight through MH's. 0.2 ft drop remained in straight through manholes Page 9 The crossing of that water line with the existing sanitary line should be potholed now during the design phase. The agreement has not been sent back in to date because of the limited approval time for construction the R&R allows after approval and payment. The sanitary lines depth has been identified and updated on the plans. Topic: Water Line Lowerings Number: 102 Created: 9/19/2006 [9/19/06] Please fill out the table specifying all the water line lowerings proposed. Table has been updated. Topic: Water Plans Number: 101 Created: 9/19/2006 [9/19/06] Please identify clearly City of Fort Collins lines and Northen Colorado Water district line on the plans. The district line may have some conflict with the proposed trees in the Willox Lane right of way. The water lines have been clearly identified. Topic: Water Quality Outlet Detail Number: 104 Created: 9/20/2006 [9/20/06] Please use the City of Fort Collins outlet detail for your water quality pond. I can email you that detail, if you don't have an electronic version. That detail should be modified to reflect the fact that this pond is a wet pond. The City of Fort Collins outlet detail has been added to Sheet 45 of 48. The detail has been modified to reflect our condition. The table calls at the bottom right calls out the permanent water surface elevation. Topic: Water/Wastewater- Off -site Easement Number: 31 Created: 1 /17/2006 [9/19/06] No easement dedication has been submitted. [5/2/06] Easement should be dedicated to the City. [1/17/06] A letter of intent for the proposed off -site easement for the sewer line is required prior to hearing. At final that easment needs to be dedicated to the City. Please also delineate the existing sanitary line easement on the mobile home property. Easement has been dedicated and submitted to Randy Mazeland. Topic: WaterMastewater Number: 66 Created: 5/2/2006 [9/19/06] [5/2/06] City standards call for water lines to be ductile iron with polywrap. Please adjust Several areas do not show crossings of water lines and storm lines across sewer lines. Page 8 [9/19/06] Line 4 B crosses the storm line with only 0.67 feet of clearance. Does that account for encasing and pipe wall thickness ? We may need to work on a special detail for that crossing. Steel casing sleeve and detail added for shallow crossing. Topic: Sewer Line on Tract B Number: 98 Created: 9/19/2006 [9/19/06] Please remove the manhole shown in the open space, and revise pipe lengths to minimize length of run between the streets, even if that length exceeds 400 feet. Manhole in the open space has been removed and pipe lengths and slope have been revised. Topic: Stormwater- Erosion Control Number: 81 Created: 9/18/2006 [9/18/06] Your plan should have a note (which is also reflected in the schedule) that the ponds will be excavated as the first step in overlot grading. That way they can be utilized as sediment traps (which is what the report calls for) immediately. The plan should also indicate the ponds as sediment traps, which it currently does not. Note added, schedule update, and ponds called out as sediment trap on drainage and erosion control plans (Appendix G). The first sentence in the last paragraph of section 6.1 on page 11 of the report doesn't make sense. Please correct. Also in the same paragraph, the sediment traps must remain until completion of the development. Text updated I did not find any PS, EFF, or surety calculations. Calculations added to appendix F. Topic: Trail Crossing Number: 96 Created: 9/19/2006 [9/19/06] Please provide a low flow crossing for the area where the swale drains across the trail. Pipe only needs to carry two year flow. A pipe has been added with the capacity to carry the 2 year flow and be overtopped otherwise. Topic: Water Line Boring Number: 100 Created: 9/19/2006 [9/19/06] The boring of the water line under the railroad track will necessitate a license agreement with the railroad company. The agreement that was submitted had the private owners as the licensee, but since the City will own maintain and operate that line, the license should have the City as the beneficiary of that license agreement. Page 7 Topic: Grading Plan Number: 97 Created: 9/19/2006 [9/19/06] Please provide FF elevation and detailed spot elevations on the grading plans. How will the proposed retaining wall be built along the property line ? If construction would affect neighboring property to the north and east, then a construction easement may be needed. Please add notes that no grading shall be done on neighboring properties. FF elevations and detailed spot elevation have been shown on the grading plan. Detail showing the wall and footing with reference to property line. No construction easement is needed. Note added. Topic: Irrigation Line Number: 77 Created: 5/5/2006 [9/19/06] [5/5/06] Please show irrigation line that will serve the park property on the plans. The residents to the south apparently own water rights that come off the lateral that is now being piped. How will these owners be able to get their water delivered ? A new headgate will be designed under a separate contract with the parks department and this will be the new lateral that will supply the park irrigation pond. Topic: Landscape Plan Number: 94 Created: 9/19/2006 [9/19/06] Please provide special plantings or wetland grasses for the open area where swales from this subdivision drain onto. A variety of grasses, sedges, etc. have been added to the areas around the swales. Additionally, a seed mix has also been specified to extend two feet on either side of these swales. The area where the trickle pans transition to natural swale should be reinforced with a geotextile material. Please show water and sanitary sewer lines on landscape plans in order for us to be able to check for any potential conflicts. Water and sewer lines appear on plans. Topic: Maintenance Number: 95 Created: 9/19/2006 [9/19/06] Has there been an agreement with the Parks department regarding the maintenance of the pond ? Agreement to be made when pond design is completed Topic: Sewer crossings Number: 99 Created: 9/19/2006 Page 6 1. Boundary Closes, Legal doesn't match the plat. 2. Title & Dedication do not match. 3. Plat is missing a lot of dimensional info. 4. Based upon configuration, the plat will need 5 street names. Boundary dimensions have been added for clarification purposes. Acreage includes Willow lane and excludes Wood Lane. References to private access easements have been removed from Plat. We prefer Outlot as opposed to Tract since it has a dwelling on it. ROW dedication information has been added for Willow Lane. Department: Light & Power Issue Contact: Monica Moore Topic: General Number: 8 Created: 1 /10/2006 [8/30/06] Streetlight layout is still NOT shown on landscape plans. Street tress WILL need to be adjusted to accommodate streetlighting. [5/1/06] [1/10/06] Street trees must maintain clearances from streetlights. 40-feet separation from shade trees and 15-feet separation from ornamental trees. Contact Light and Power Engineering to initiate design of the streetlight layout. Streetlights have been added. Additionally. street tree clearances have been maintained. Topic: Landscape Plan Number: 47 Created: 5/1/2006 [8/30/06] [5/1/06] Landscape plan needs to show proposed streetlight placement and vault placement in relationship to the planned placement of street trees. Street lights and vaults have been added and demonstrated on landscape plans. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 79 Created: 9/4/2006 [9/4/06] No remaining issues. Department: PFA Issue Contact: Carie Dann Topic: Pre Number: 103 Created: 9/20/2006 [9/20/06] No additional comments or concerns at this time. Department: Stormwater-Water-Wastewater Issue Contact: Basil Hamdan Topic: Detention on City Parks property. Number: 93 Created: 9/19/2006 [9/19/06] Agreement with the Parks Department should be provided regarding the proposed work on the parks property. The irrigation pond has been designed and an agreement will be prepared and finalized when the irrigation pond design is approved with the parks department.. Page 5 [5/2/06] The street cut limits shown on Willox may not be realistic. Cuts for service connections are not shown, and with the milling indicated, it may just be required to cut the street to the existing edge of pavement. The street cuts have been shown and there the standard street cut note has been added. There is no need to for street cut for the two services because they are outside of the existing asphalt. Number: 62 Created: 5/2/2006 [9/19/06] Cross sections for ultimate design only have been submitted. Please include interim cross sections with the next submittal. The cross section provided do not show adequate information relating to cross slope, gutter flow line elevations and how proposed grades will tie back into existing ground. See redline comments for clarification. [5/2/06] At final compliance, we will require cross sections to be shown at 50' (min) intervals along Willox Ln. including both interim and ultimate improvements, as well as existing conditions. Interim and ultimate cross sections are shown on the same cross section to illustrate how to two designs overlap. All the required information has now been shown per the redlines. Number: 63 Created: 5/2/2006 [9/19/06] Additional information is still needed on the plans to indicate interim dimensions and existing versus proposed pavement limits. Please see the redline comments for clarification. [5/2/06] (Public Hearing Comment) Please provide additional detail on the Willox design. Label existing and proposed ROW limits on the plan view, provide interim and ultimate dimensions on the standard cross-section. Please note that any interim improvements are not eligible for reimbursement unless they are able to be used as part of the final cross- section of the street. Please indicate existing limits of pavement, and how much you are widening out each side. Interim and Ultimate design has been clearly labeled and identified. Cross sections have been added showing both interim and ultimate. Number: 72 Created: 5/3/2006 [9/19/06] Existing and proposed grades on the ultimate Willox design are different at the R&R crossing, mainly at the flowlines. Please address how the railroad crossing will be accomodated for with these proposed grade changes. [5/3/06] It appears that you are regrading Willox Ln. at the railroad crossing. Please indicate the tracks on your profile sheet, and indicate if you plan on raising the tracks. Flowline elevations have been changed to match the existing elevations at R&R. Topic: Technical Services Number: 42 Created: 1 /18/2006 [9/19/06] Boundary and legal close but do not match. Acerage in legal is incorrect. Note 1 on Plat cover sheet describes private access. There are only public access easements being shown on the Plat. Where is the private access ? Why is an outlot A being created rather than a tract lot ? Please show how Willox Lane was dedicated. See redlines for additional comments and clarification. [1/18/06] Technical Services Comments: Page 4 pavement. Show dimensions on the interim pavement asphalt cross section. See redlines for additional comments and clarification. Interim Willox Lane is now dimensioned and ROW labeled. Edge of pavement clearly labeled. Interim asphalt cross section has been dimensioned. Number: 91 Created: 9/19/2006 [9/19/06] No interim -cross section have been provided. Please add standard cross sections for every 50 feet with the next submittal. . Interim cross sections are on the same cross section as the Ultimate design to show how the two match up. Number: 92 Created: 9/19/2006 [9/19/061 Refer to Willox Lane ultimate design. A low point is proposed with a vertical curve at STA 4+62. Please address how the drainage will be collected and conveyed from the street at this location. Same condition at STA 25+96, how will the drainage work ? There exists a concrete overflow along the ditch that conveys storm runoff into the existing irrigation ditch. The low points in the road have been matched to existing low points in the road and it is conceived that the drainage will then be conveyed as it is currently. Department: Engineering Issue Contact: Dan DeLaughter Topic: Grading Plan Number: 19 Created: 1/16/2006 [9/19/06] Please show the retaining wall foundation with respect to the property line in the trickle pan/ret. Wall section detail provided. [1/16/06] For the 2 retaining walls shown on the eastern part of the site, label the heights and provide spot elevations for top and bottom. Provide construction details if walls are higher than 2'. The structures, including footings may not cross onto adjacent property (without obtaining an offsite easement) or into utility easements. Retaining wall foundation shown on detail w/ trickle pan. The heights and spot elevations have been labeled along the proposed wall. Topic: Plat Number: 13 Created: 1/16/2006 [9/19/06] No easement has been submitted to date. [5/2/06] Since the easment has been dedicated already, no letter of intent is necessary, but we will need the easement to come through the city dedication process. TDRF fees and filing fees will apply. [1/16/06] Provide a letter of intent indicating the willingness of the mobile home park to grant the off -site utility easement shown. Easement dedication papers have been submitted to Randy Mazeland. Topic: Streets Number: 54 Created: 5/2/2006 [9/19/06] Please clearly indicate the approx. limits of street cuts for the two water service connections on Willox. Add the standard street cut note provided with the redlines. Page 3 letter from Parks should also grant permission to regrade the existing pond as shown on the plans. Clearly indicate on the plans who will be grading within the park site. Permission letter from the parks has been included w/ this submittal. The irrigation pond design has just been started and projected to be finished in a month. Number: 84 Created: 9/19/2006 [9/19/06] Clearly label the public access easement on the Plat. See redlines for clarification. Public access easement clearly labeled on plat now Number: 85 Created: 9/19/2006 [9/19/06] The stormwater surface drainage is being conveyed over the pedestrian access path leading to Soft Gold Park. This may create a hazardous condition during heavy flows or freezing. Please provide a pipe under the path for water to cross. Clearly indicate this on the plan with a detail if necessary. A pipe has been added to convey the water under the trail with a plan and profile added on sheet 18. Number: 86 Created: 9/19/2006 [9/19/06] Clearly label the limits of concrete paving on Sweet Com Drive as ECR to BC and provide an expansion joint layout detail. You may use the CDOT m-412-1 or equivelant. Revise construction notes accordingly to reference the detail. Limits of concrete paving have been clearly labeled and a concrete expansion joint detail has been added on sheet 48. Number: 87 Created: 9/19/2006 [9/19/06] Make sure that all plan sheets showing street layouts have the street names shown as well as any intersecting street names TYP. See redline comments for clarification. Street names have been added to all plan views. Number: 88 Created: 9/19/2006 [9/19/06] Show the approx. limits of street cuts for the 12 inch water line installation and service connections on sheet 23. Add the City standard street cut note. The city standard street cut note has been added. The approximate limits of the street cut are shown for the entire water line. The 8" line going south off of the 12" line will not need to be saw cut because it is outside of the existing pavement area. Number: 89 Created: 9/19/2006 [9/19/06] Please dimension all streets with ROW, sidewalk, parkway and FL to FL widths. Also label any utility easements behind the ROW. See redlines for clarification. Streets have all been labeled with the appropriate widths. Number: 90 Created: 9/19/2006 [9/19/06] Refer to Willox Lane interim design. Show all dimensions for proposed interim paving and label the ROW. Clearly label on the plans the existing and proposed edge of Page 2 STAFF PROJECT REVIEW Cityof Fort Collins MICHAEL CHALONA Date: 09/27/2006 LAND IMAGES, INC 1136 E. STUART #2040 FORT COLLINS, CO 80525 Staff has reviewed your submittal for ARCADIA PDP - TYPE II AND FINAL PLANS, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dan DeLaughter Topic: Details Number: 50 Created: 5/2/2006 [9/19/06] Need to show proposed retaining wall foundation with respect to the property line in the trickle pan/ret. Wall section -detail [5/2/06] Please provide structural details for the retaining walls along the property lines. We need to be sure they can be built without obtaining offsite easements. Proposed retaining wall is shown with respect to the property line on sheet 7 and 8. Topic: General Number: 38 Created: 1 /18/2006 [9/19/06] [1/18/06] Transportation Development Review Fees will apply for all future submittals, including Final Compliance, Minor or Major Amendments, and ROW and easement vacations and dedications not done with the plat. Please contact the Engineering Development Review Office for a copy of the fee structure. Noted: Number: 57 Created: 5/2/2006 [9/19/06] Please submit evidence of permision to bore within the railroad ROW. [5/2/06] 1 have received a copy of the permit to be on railroad ROW for survey work, but will an additional permit be required in order to complete the boring work? Please coordinate with Union Pacific. Permission to bore under R&R has been included wl this submittal. Department: Engineering Issue Contact: Randy Maizland Topic: General -Utility Plans Number: 82 Created: 9/19/2006 [9/19/06] Please add the geotechnical engineer name and contact information to the cover sheet with a reference to the latest soils report. Geotechnical engineer added to cover sheet w/ reference to latest soils report. Number: 83 Created: 9/19/2006 [9/19/06] Refer to sheet 2, general note 48 D. Please provide a letter from Park Planning granting approval to drain the Arcadia site into the existing pond located in the park. The Page 1 W I -T H A4rSPdNd`FS