Loading...
HomeMy WebLinkAboutAMENDED CSURF CENTRE FOR ADVANCED TECHNOLOGY - ODP - MJA110001 - CORRESPONDENCE - (36)af X r,�ortVColl�ns Pre -Submittal Meetings for Building Permits Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov.crom Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that the new commercial or multi -family proiects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi -family projects are advised to call 416-2341 to schedule a pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues .of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2009 International Building Code (IBC) 2009 International Residential Code (IRC) 2009 International Energy Conservation Code (IECC) 2009 International Mechanical Code (IMC) 2009 International Fuel Gas Code (IFGC) 2009 International Plumbing Code (IPC) as amended by the State of Colorado 2008 National Electrical Code (NEC) as amended by the State of Colorado Accessibilitv: State Law CRS 9-5 & ICC/ANSI Al 17.1-2003. Snow Load Live Load: 30 PSF / Ground Snow_ Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chapter 4 2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4. 3. Commercial and Multi -family 4 stories and taller: 2009 IECC Chapter 5. 6 �}ommunity Development and Neighborhood Services �' • Collins�- PO Box 80ollege Avenue . Fort Collins, CO 80522 ' 970.221.6750 970.224.6134 - fax lcgov.com 12. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal: 13. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. . Cfty of F6rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov com neighborhood meeting is required, the meeting shall be held prior to submittal of a development application to the City for approval of an ODP. In this case the neighborhood meeting is scheduled for January 18, 2011 and the City will not accept an application for an ODP review until after that date. 7. J An Amended ODP, when submitted, will be evaluated by staff against Section 2.1.3(B), �/ Section 2.2.11(B) and Division 2.3 of the LUC before any public hearing could be scheduled for a decision on the ODP. 8. The Amended ODP, when submitted, will be subject to applicable criteria in Division 2.2 - Common Development Review Procedures for Development Applications of the LUC. 9. An application for an Amended ODP must include the documents identified on the ODP Submittal Checklist and satisfy the ODP Submittal Requirements. Both of these documents can be found at www.fcgov.com/developmentreview/applications.php on the City's website. 10. On the proposed Amended CSURF Centre for Advanced Technology ODP (dated 12/28/10) there appears to be a line along the north side of the Larimer No. 2 Canal that looks like the ODP Boundary. What is meant by this? The ODP of record does not show this line. Parcels A & B, south of the canal/irrigation ditch, are included in the ODP of record. 7. The proposed development project is subject to a Type 2 (Planning and Zoning Board) review and public hearing. The applicant for this development request is required to hold a neighborhood information meeting prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact me, at 221-6750, to assist you in setting a date, time, and location. I and possibly other City staff, would be present to facilitate the meeting. 8. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. 9. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at hftp://www.colocode.com/ftcollins/landuse/begin.htm. 10. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. 11. Please seethe Submittal Requirements and Checklist at: hftp:/A.vww.fcgov.com/developme,ntreview/applications.php. 4 Community Development and Neighborhood Services C,..I.}� n 281 North College Avenue FCJ` CoffiPO Box 580 Fort Collins, CO 80522 _ 970.221.6760 970.224.6134 - fax fcgov.com PARK PLANNING Contact:. Craig Foreman, 970-221-6618, , cforeman(a.fcgov.com 1. No comments FIRE AUTHORITY Contact: Carie Dann, 970-21975337, CDANN(dyoudre-fire.orci 1. PFA has no comment regarding the ODP, since no strucutres are proposed. At the time specific structures are 'proposed for the property; PFA willprovide comments related to emergency vehicle access, water supply, addressing/street names, and occupancy type requirements: 2. General Note 5 should -be corrected to refer to city standards "in effect" instead of "in effective.. ENVIRONMENTAL PLANNING Contact: Lindsay Ex, lex(cDfcgov.com 1. All comments regarding natural resources issues,will, be. provided with;submitted PDPs. All previous comments submitted still apply. ENGINEERING DEVELOPMENT REVIEW 2 Contact: Marc .Virata, 970-221-6567, mvirata cDfcgov.com 1. No comments specific to the ODP. ELECTRIC ENGINEERING " Contact: Justin Fields, 970-224-6150, ifields(&fcgov.com 1. No Comments. CURRENT PLANNING Contact: Steve Olt, 970-221-6341, solt(cDfcgov.com 5. As set forth in Section 2.2.1(A)(2) of the Land Use Code, a conceptual review is mandatory for all Overall Development Plans; and, conceptual review must occur at least one day prior to submittal of an application for an ODP to the City for review. 'In this case the conceptual review is being held on January 10, 2011 and 'no submittal date-9 , rid time has been D6.scheduled. As set forth in Sections 2.2.2(B)&(D) of the LUC, a neighborhood meeting shall be required on any development proposal that is subject to Planning & Zoning Board review; and, if a Community Development and Neighborhood Services Y� 281 North College Avenue F�ort Collins PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com CONCEPTUAL REVIEW STAFF COMMENTS Meeting Date: January 10, 2011 Item: CSURF Amended ODP Applicant: Land Use Data: Linda Ripley Fort Collins, CO This is a request to amend the CSURF Overall Development Plan. Comments: ZONING Contact: Peter Barnes, 970-416-2355, a barn es(cDfcgov.com 1. No comments WATER -WASTEWATER ENGINEERING Contact: Roger Buffington, 970-221-6854, rbuffington(cDfcgov.com 1. All water/sewer comments will be provided with the PDP submittals for this area. TRANSPORTATION PLANNING Contact: Matt Wempe, , 1. No comments on the ODP STORMWATER ENGINEERING Contact: Glen Schlueter, 970-224-6065, gschlueter(aDfcgov.com 1. All previous comments given for the site still apply and detailed comments will be provided with future submittals of the PDP. 2. Portions of this property are located in a 100-year FEMA-regulatory floodway and flood fringe for Spring Creek. All previous comments submitted for the prior ODP for the same property shall be continued for this latest submittal. 2. Community Development and Fort Collins. G January 10, 2011 Linda Ripley Fort Collins. CO RE: CSURF Amended ODP Dear Linda, Neighborhood Services 281 North College Avenue POBox 580 7-- Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov.com Attached, please see a copy of Staffs comments concerning the request referred to as the CSURF Amended ODP,, which was presented before the Conceptual Review Team on January 10,2011. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to contact me at 970-221-6341. 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 — (970) 221-6750 - FAX (970) 224-6134