Subject: Re: submittal of new Amended CSURF Centre for Advanced Technology Overall Development Plan
Mr. Olt,
Thank you for the update. When will the two neighborhood meetings begin for this new Overall
Development Plan (ODP) for the referenced CSURF ground? And will you email a copy of the ODP
to me?
Additionally, a PDP references and fits within an ODP. How is it that this PDP exists outside that
customary framework? I would expect a new PDP aligned with and referencing the new ODP. Not a
PDP that was aligned with the ODP that was so thoroughly voted down by City Council.
Thank you,
Kevin K. Barrier
Real Estate Consultant
Cobblestone Realty
3131 South College
Fort Collins, CO 80525
Kevin@KevmBamer.com
Direct: 970-430-5150
Mobil: 970-310-3450
Fax:970-797-0777
CONFIDENTIALITY NOTICE:
Diu' e-mail transmission and any accompanying documents contain information belonging to the sender which my be confidential and or privileged This information
is intended only for rite use of the recipient named above and any other person who has been specifically authorized herein to receive it, and the referenced legal
privileges are not waived by view of the information having been sent by a -mad. lfyou are not the intended recipient you are hereby notified that any use. disclosure.
distribution. copying, or action taken in reliance upon the contents of the information contained in this e-mail is strictly prohibited. Ifyou have received this e-mail in
error, or if any problems occur with the transmission, please immediately notify the sender. Thank you.
On Thu, Mar 31, 2011 at 12:38 PM, Steve Olt <SOLT@—fcgovcom> wrote:
To Residents and Interested Parties,
This notice is to inform you of a submittal of a new Amended CSURF Centre for Advanced Technology,
Overall Development Plan (ODP) that took place yesterday afternoon, March 30, 2011, at the Development
Review Center, City of Fort Collins. This new development proposal will go through a 3-week review by City
staff. On Wednesday morning. April 20C^, this item will be discussed by staff and the applicant (Campus Crest at
Fort Collins, LLC) at a staff review meeting at 281 North College Avenue. At this meeting staff will determine if
the ODP can be scheduled for a Planning & Zoning Board public hearing, where a decision (approval or denial)
would be made by the Board. The earliest possible Board public hearing date would be May 19, 2011.
This new ODP, now submitted, will be reviewed by City staff concurrent with The Grove at Fort Collins, Project
Development Plan (PDP) that was submitted on December 8, 2010 and has been through one round of
development review. Staff issued a comment letter to the applicant on January 4, 2011 stating that a second
round of review is required. To date, staff is awaiting a submittal
of revised plans for the PDP. Once submitted these plans will go through the required 2-week review by staff. AI
the end of the 2 weeks the item will be discussed by staff and the applicant at a Wednesday morning staff review
meeting. To ensure conformance of The Grove at Fort Collins, PDP with an OOP of record, the new Amended
CSURF Centre for Advanced Technology, ODP would have to be approved before the Board would be able to
approve the PDP. Both items could possibly be heard and discussed at the same public hearing.
Please do not hesitate to contact me if you have questions or need additional information regarding the City's
development review process.
3/31/2011
Pagel of 3
Steve Olt
From: Steve Olt
Sent:
Thursday, March 31, 2011 3:34 PM
To:
'Kevin Barrier'
Cc:
David Roy
Subject: RE: submittal of new Amended CSURF Centre for Advanced Technology Overall Development
Plan
Kevin,
A neighborhood meeting was held on January 18, 2011 to present and discuss the current ODP that was in
preparation at that time and then submitted on March 30, 2011. Therefore, another neighborhood meeting will not
be held because the neighborhood meeting requirement set forth in Section 2.2.2(B) of the Land Use Code has
been met. You can access the CSURF ODP documents in the City's Public FTP Site as follows:
From you computer, FTP files can be accessed by both the public and city employees. Please follow these
instructions:
• Go to the "run" option
• Use the following text: explorer.exe ftp://gw-download:ven53dor@ns2.fcgov.com/
If you have difficulty accessing the information please contact Courtney Rippy in Current Planning at
crippyj fcc ov.com.
As stated in Section 2.4.2(H) of the Land Use Code: "when a project development plan is within the boundaries
of an approved overall development plan, the project development plan shall be consistent with the overall
development plan". The Grove at Fort Collins, PDP submitted on December 8, 2010 for development review
remains in our process; however, because it is not consistent with certain elements (such as the Rolland Moore
Drive street alignment and the proposed local street connection into the adjacent neighborhood) of the CSURF
Centre for Advanced Technology ODP of record; and, because the previous Amended CSURF Centre for
Advanced Technology ODP was denied by City Council on December 21, 2010, it was necessary for the
applicant to submit another Amended ODP that must be reviewed and approved by the Planning & Zoning
Board. The current PDP must then be reviewed against and demonstrate consistency with the new ODP, if
approved. Whether or not both the ODP and the PDP will be heard and discussed at the same Board public
hearing is still to be determined. This is the procedure most commonly used by City staff in evaluating a PDP that
is part of an ODP.
Also, please note that the Institute for the Built Environment (IBE at CSU), Campus Crest of Fort Collins LLC and
the projects' design team will be hosting an open house on Wednesday, April 27th, for the purpose of presenting
revised plans for The Grove at Fort Collins PDP and the new Amended CSURF Centre for Advanced Technology
ODP to neighbors and interested parties. Apparently there will be multiple stations set up where anyone can talk
to representatives from IBE, Campus Crest or their design team about various aspects of the project(s).
Steve Olt
City's Project Planner
970-221-6341
Solt fcgov.com