04/19/2011: Provide profile of entire length of water main lowering A to insure that all
conflicts are resolved and connections can be made in reasonable manner.
Department: Water -Wastewater Engineering Contact: Roger Buffington
Topic: Construction Drawings
Number: 2 Created: 04/19/2011
04/19/2011: One of the water service connections to Bldg 1 is currently shown within the
limits of water main lowering B. Can this be revised to avoid having fittings between the
8-inch water main and the meter vault?
Number: 4 Created: 04/20/2011
04/20/2011: See redlined utility plans for other comments.
Topic: General
Number: 3 Created: 04/20/2011
04/20/2011: The utility plans and the landscape plan are showing different information for
water and sewer services. Revise plans to reflect the same information.
Topic: Plat
Number: 142 Created: 02/15/2011
04/20/2011: The utility easement on the east side of Choice Center Drive must extend 15
feet to the east of the sanitary sewer and must include the curb stops and fire hydrant
along the east side of this drive.
(2/15/11] Provide utility easements as follows: Water mains - 10 feet each side of main
(20 feet total); Sanitary sewer - 15 feet each side of sewer (30 feet total). This applies to
existing and proposed lines.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project, please
feel free to contact me at 970-221-6343.
Sincerely,
Ted Shepard
Chief Planner
City, of
Flirt Collin
STAFF PROJECT REVIEW
Number: 198 Created: 02/23/2011
[2/23/11] Utility Plans - S&S Plan,.sht 18: Remove the word "STOP" at all locations that
also have an R1-1 sign. On -going maintenance issue and unnecessary.
Department: Traffic Operation Contact: Ward Stanford
Topic: Construction Drawings
Number: 199 Created: 02/23/2011
[2/23/11] Utility Plans - S&S Plan, sht 18: Remove the R3-5R sign at the exit of Choice
Center Drive onto College. The median and the R3-1 sign give adequate info to motorists
that there only option is to the right.
Number: 200 Created: 02/23/2011
(2/23/11) Utility Plans - S&S Plan, sht 18: Remove the thru/right roadway stencil on Stuart
at College.
Topic: Traffic Impact Study
Number: 201 Created: 02/23/2011
[2/23/11 ] Please provide a copy of the most currant TIS with the next submittal.
Number: 202 Created: 02/24/2011
[2/24/111 A TIS memo discussing the changes from the original plan was to be provided,
but was not received. Please provide the TIS memo with the next resubmittal.
Department: Water -Wastewater Engineering Contact: Roger Buffington
Topic: Construction Drawings
Number: 137 Created: 02/15/2011
04/19/2011: A meeting is needed to clarify the water service sizing. Some of the
information seems to be conflicting and the proposed sizes seems quite large.
[2/15/111 Provide water service sizing calculations for the buildings with residential units.
Number: 140 Created: 02/15/2011
04/19/2011: The objective is to abandoned the existing 6-inch main west of Bldg 4 and
re -connect the Bldg 4 water service to the new 8-inch main.
[2/15/11] The existing water main to the west of Existing Bldg 4 appears to have several
conflicts with landscaping and new curb and gutter. Schedule meeting to review re-routing
this main.
Number: 143 Created: 02/15/2011
04/20/2011: Revise the easements shown on the overall utility plan to reflect changes
noted in Issue ID 142 pertaining to the plat.
[2/15/111 Show easements on utility plans consistent with comment 142 and plat.
Number: 145 Created: 02/15/2011
04/19/2011: Match crowns where 12-inch sewer connects to existing 21-inch sewer. This
will necessitate adjustment of the storm drain to maintain minimum slope on the sanitary
sewer.
[2/15/11] Label elevation of the existing sewer invert at San MH-1.
Number: 1 Created: 04/19/2011
City of
Fort Collins
STAFF PROJECT REVIEW
floodplain until the LOMR is approved by FEMA, and until an Elevation Certificate is
approved for any buildings in the floodplain, especially at Building #1.
20. Please make sure that all information (plans, designs, calculations, descriptions, etc.)
in the CLOMR and LOMR submittals match the Development Plan.
Department: Technical Services Contact: Jeff County
Topic: Construction Drawings
Number: 204 Created: 03/17/2011
04/20/2011: There are still line over text issues on sheets 9 & 18.
[3/17/11] There are line over text issues on sheets 7-11, 13 & 14; 16 & 17 of the Utility
Plans.
Number: 211 Created: 04/20/2011
04/20/2011: The Subdivision Plat & CLOMR Plans are not in the order shown on the
index.
Number: 212 Created: 04/20/2011
04/20/2011: There are many line over text issues on the CLOMR Plans,
Topic: Plat
Number: 190 Created: 02/22/2011
04/20/2011: The boundary & legal close.
[2122/11] The Subdivision Plat boundary & legal close. -
Number: 207 Created: 04/20/2011
04/20/2011: What are the 2 lots? or tracts? at the southwest corner of the plat?
Number: 208 Created:- 04/20/2011
04/20/2011: Please add the missing reception numbers to the legal description.
Topic: Site Plan
Number: 209 Created: 04/20/2011
04/20/2011: The legal description on sheet 1 does not match the Subdivision Plat.
Number: 210 Created: 04/20/2011
04/20/2011: The benchmark on sheet 1 does not match the Utility Plans and is incorrect.
Department: Traffic Operation Contact: Ward Stanford
Topic: Construction Drawings
Number: 197 Created: 02/23/2011
[2/23/111 Utility Plans - S&S Plan, sht 18, Stuart St S&S detail: move the Stop Bar to the
right hand side of the access from the parking lot. Delete the word "STOP" also. It's an
on -going maintenance issue and not necessary since there is an R1-1 sign.
Clty of
Fart Collins
STAFF PROJECT REVIEW
Landscape Plans:
10. Landscape plans must be consistent with specifications in CLOMR.
11. Include irrigation where specified by CLOMR.
12. Ensure vegetation type in flood control channel matches that required in CLOMR.
Add Standard Notes1) All activities in the current effective floodplain and floodway are
subject to the requirements of Chapter 10 of City Municipal Code. 2) No storage of
materials or equipment in the floodway before, during and after construction. 3) All
activities in the floodplain and floodway must be pre -approved through floodplain use
permit and no -rise certifications. No certificate of occupancy will be issued without no -rise
re -certifications and FEMA Elevation Certificates. 4) Landscape changes in the floodplain
Department: Stormwater Engineering Contact: Wes Lamarque
Topic: General
and floodway must be pre -approved through floodplain use permit and no -rise
certifications. 5) All proposed conditions determined by CLOMR Case number
09-08-0735R effective January 29, 2010. 6) Placement of new vegetation in the floodway
in a location or of a quantity or type that is determined to likely result upon maturity in an
increase in base flood elevations is prohibited. No -rise certification is required for all site
work including landscaping within the floodway. 7) Add note specifying the required
maintenance of the flood control channel per the.CLOMR.
13. Add flood control channel revetment information in separate sheets. Include the plan
view and any details necessary for construction from the CLOMR.
14. Add Floodplain Exhibit to landscape plans.
Drainage Report:
15. Please see redlines for changes and comments.
16. Pg 6. Add Finished Floor and HVAC elevations. Add statement that these are higher
than the RFPE.
17. See redlines for updated reference information.
September 29, 2008 Comments:
18. A Letter Of Map Revision (LOMR) is required immediately after completion of
non-structural development activities at the Choice Center site, per City Code 10-45(2)(b).
The LOMR application shall be approved by City staff and FEMA before a building permit
can be issued. A floodplain use permit shall be approved for Building #1 before the building
permit can be approved.
19. A Certificate of Occupancy shall not be issued for structures in the current effective
City of
F&t' Collins
STAFF PROJECT REVIEW
Department: Stormwater Engineering Contact: Wes Lamarque
Topic: General
Number: 189 Created: 04/22/2011
04/22/2011: Please label all details and reference them to all improvements in the plan
set. Some improvements were not referenced and some details were not labeled.
Number: 190 Created: 04/22/2011
04122/2011: Please label the drainage easements on the plat for the PLDs.
Number: 191 Created: 04/22/2011
04/22/2011: Please document in the drainage report how there is no emergency spill for
basins b2a, b2b, and b2c, which was discussed over the phone, and list the reasons for
this. ADA requirements for the building was one reason. Also, basin b2c is not discussed
in the report.
Department: Stormwater Engineering Contact: Wes Lamarque
Topic: General
Number: 192 Created: 04/22/2011
04/22/2011: Floodplain Administration Comments
Contact: Brian Varrella 970-416-2217
Site Plan:
1. Please modify per redlines.
2. Remove all floodplain line work from site plan. Add Floodplain Exhibit to Plan set and
reference in a note on the Site Plan.
Utility Plans:
3. Please modify per redlines.
4. CLOMR work maps: remove from plan set sheets 1 through 6 of 8.
5. General Notes: move floodplain related notes to section F. Floodplain Information.
6. Grading, drainage and erosion control plans: Modify per redlines.
7. Add flood control channel revetment information in separate sheets. Include the plan
view and any details necessary for construction from the CLOMR.
8. Erosion control and drainage details: check riprap detail as redlined.
9. Show tie in to Mason Street BRT stilling basin on plans.
City of
Fort Collins
STAFF PROJECT REVIEW
04/22/2011: In progress.
[2/17/11] Water draining from the south parking lot has increased the flows onto City
Parks property and written permission is required to increase these flows. City
Stormwater staff can assist in acquiring this.
Number: 181 Created: 02/17/2011
04/22/2011: 1 could not find the cross-section. Please add it to the landscape plan and the
drainage details in the utility plan set.
(2/17/11] Please provide a detail (cross-section) for the grass buffer being proposed to
provide water quality mitigation for the southern parking lot.
Number: 182 Created: 02/17/2011
04/22/2011: There is no drainage easement on the plat. Storm sewers should be in a
drainage easement, not utility.
[2/17/11] Please provide a drainage easement with a minimum width of 20 feet for the
storm sewer in Choice Center Drive. The pipe should be centered within the easement.
Number: 184 Created: 02/17/2011
[2/17/11] There is a few areas that need more detail regarding grading to help clarify
drainage patterns and to ensure the site gets built per the plans. Please see redlines.
Number: 185 Created: 02/17/2011
04/22/2011: The unit price per acre is now $1,000 per acre. Please revise.
[2/17/11] Please provide an erosion escrow amount in the drainage report.
Number: 186 Created: 04/19/2011
04/19/2011: More information is needed on the connection of the flood control channel
with Spring Creek. In referencing the CLOMR for the flood channel, it appears that low
flows in Spring Creek will back up into the flood channel. This will create a wetland within
the flood channel. The plans also do not show the scour protection within Spring Creek
that was designed with the BRT CLOMR. Coordination needs to take place between
these two projects for a design that meets all parties design needs and City requirements.
Number: 187 Created: 04/19/2011
04/19/2011: The outfall for the proposed storm sewer still needs to be completed and
agreed on by all parties.
Number: 188 Created: 04/22/2011
04/22/2011: The City is requesting that the proposed 12-inch storm sewer conveying
flows from west of the railroad be upsized to a 30-inch pipe. This is required to avoid
having public water west of the railroad bubble up out of the proposed inlet and travel south
in the private flood control channel. This option would eliminate, legal, liability, and
maintenance issues.
City of
Flirt Collins
r��
STAFF PROJECT REVIEW
Topic: General
Number: 136 Created: 02/15/2011
PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM
Where adequate radio coverage cannot be established within a building, public -safety
radio amplification systems shall be installed in the following locations:
1. New buildings greater than 50,000 SF in size or addition(s) to an existing building that
cause the building to be greater than 50,000 SF. For the purpose of this section, fire walls
shall not be used to define separate buildings.
2. All new basements greater than 10,000 SF where the designed occupant load is
greater than 50, regardless of the occupancy classification.
3. Existing buildings meeting the criteria of Items 1 and 2 of this section undergoing
alterations exceeding 50 percent of the aggregate area of the building.
Public -safety radio amplification systems shall be designed and installed in accordance
with criteria established by Poudre Fire Authority.
PFA Fire Prevention Bureau Administrative Policy 07-01
Number: 1 Created: 04/18/2011
04/18/2011: The Site Plan does not show/label the Emergency Access Easement;
however, it does show other easements. For consistency, please include the EAE on the
Site Plan. Also, please get with me to finalize where FIRE LANE - NO PARKING signs
should be installed and to get sign templates.
Department: Stormwater Engineering Contact: Wes Lamarque
Topic: General
Number: 174 Created: 02/17/2011
04/22/2011: Our office's opinion is that it would not have an impact on the capacity of the
channel. If the pan were to stay, another water quality option would have to be provided for
these sub -basins.
[2/17/11 ] The report states that sub -basins C1 b and C1 c are being treated for water
quality in the grass swale used as the floodway channel. This channel could be used for
water quality mitigation if the 3-foot pan was removed. If the pan can not be removed,
other mitigation would be required.
Number: 178 Created: 02/17/2011
04/22/2011: The table seems to be missing some information. Table b-2 describes the
media section and is not included.
[2/17/11] Please include construction details for the PLDs per the Urban Drainage Manual.
Department: Stormwater Engineering Contact: Wes Lamarque
Topic: General
Number: 179 Created: 02/17/2011
04/22/2011: In progress.
[2/17/11 ] Please provide easement documentation for the storm sewer located on City
Parks property.
Number: 180 Created: 02/17/2011
City of
Flirt Collins
STAFF PROJECT REVIEW
to illustrate Spring Creek and provide a detail, similar to those on Sheet 14, that is a
cross-section of this outfall area.
[9/23/08] have not seen utility plans, as soon as I do, I'll provide comment.
[7/29/08] Provide plan and profile of storm draim line adjacent to Spring Creek, between
SDMH-OS1and SDMH-OS2. The creek and the retaining wall are very close together,
which may have impacts to the creek.
Topic: Landscape Plans
Number: 82 Created: 04/18/2011
04/20/2011: As per the staff review discussion on 4/20/11 - please confirm that no
changes to the existing planting plan within the buffer area will take place. If changes are to
take place, please send me a copy of the revisions for review.
Department: Forestry Contact: Tim Buchanan
Topic: Landscape Plans
Number: 1 Created: 04/22/2011
04/22/2011:
Increase the number of mitigation trees listed in the Plant Schedule from 51-56 to
correspond with the required number in mitigation schedule.
Department: Light And Power Contact: Doug Martine
Topic: Construction Drawings
Number: 130 Created: 01 /25/2011
[1/25%11] The electric service to the existing Discount Tire store is 120/240 Volt open delta
3 phase. If this service is relocated as shown on the utility plan, it will be 120/208 Volt wye
three phase. The developer will need to coordinate with Discount Tire to change the
voltage, which may involve replacing equipment in the building. The developer will be
responsible for installation of the new electric service from the transformer to the meter on
the building.
Number: 131 Created: 01/25/2011
[1/25/11] It appears that there is only 24 Ft. between buildings 2 & 3. The plan shows 2
sewer services, a water service, a fire water line, and an electric service in this area.
Installation as well as maintenance of these is such close proximity may be challenging or
impossible. A utility coordination meeting is encouraged before plans are finalized.
Department: Light And Power Contact: Doug Martine
Topic: Construction Drawings
Number: 132 Created: 01 /25/2011
[1/25/11] The water main in Choice Center Dr. will need to be moved a minimum of 7 Ft.
to the east of the location shown to provide space for installation of the high voltage
electric system. This may result in the necessity to relocate the sewer main. A utility
coordination meeting is encouraged before plans are finalized.
Department: PFA Contact: Carie Dann
0
City of
Flirt Collins
STAFF PROJECT REVIEW
[2/16/11 ] It doesn't appear that "Choice Center Drive" street signs are indicated to be
installed on the signing and striping plan. If desired (or required) however, wherever street
signs are posted indicating the private "Choice Center Drive", please provide separate
informational signage (black lettering on white background ) below (at about 5' off the
ground) indicating "Choice Center Drive privately owned and maintained". Please provide
a detail of this on the details sheet. This is in the same manner as to how Council Tree
Avenue (a private drive) in Front Range Village was addressed.
Number: 169 Created: 02/16/2011
04/20/2011: Carried over for reference. It is suggested that the plat be used to create a
map type exhibit of the various easement dedications/vacations (turning off other layers
other than property boundaries) along with an accompanying table indicating each
easement along with the identified Grantor and Grantee for each for dedications and the
party consenting for vacations.
[2/16/11] Is there a reference document already compiled that lists the various dedications
and vacations of easements that are required both onsite and offsite? It is suggested that
this document be provided for review and will then be used as a "check -off' for verification
and agreement with all that all the required approvals are obtained prior to final plan
approval.
Number: 189 Created: 02/18/2011
04/20/2011: 1 didn't come across this info, perhaps an electronic version can be provided
that we can provide a copy to CDOT?
[2/18/11 ] CDOT and the City would like to see an updated traffic memo/letter with the
consultant's traffic engineer indicating what changes (if any) to the proposed land use and
resulting trip generation may have taken place between the PDP (pre -hearing) submittal
and with -the present final plan submittal, and the impacts. (if any) that may result.
Number: 192 Created: 04/22/2011
04/22/2011: Just as a heads -up, I've received feedback from City Engineering, Capital
Projects -Street Oversizing that the City provides reimbursement for the oversized portions
of street components only to the extent that what was there previously is either
substandard or non-existent. With the construction of new detached sidewalk,
reimbursement from the local to oversized condition is only to the extent that there is either
no sidewalk or non -compliant (less than ADA width) sidewalk previously in place. Thus the
portions of existing attached sidewalk that are being removed and installed as detached
will not have reimbursement rights extended to the applicant.
Topic: Plat
Number: 190 Created: 04/20/2011
04/20/2011: Porous Landscape Detention being defined on the plat seems unusual. Is this
intended to be a drainage easement?
Department: Environmental Planning Contact: Lindsay Ex
Topic: Construction Drawings
Number: 81 Created: 04/18/2011
04/18/2011: Will review this detail when it has been finalized.
[2/16/11] As per Dana Leavitt's original comment, thank you for providing the profile of the
storm headwall. However, as Spring Creek is not depicted in this profile, one cannot
assess the connection between the storm outfall and the creek. Please revise this profile
City of
Fort Collins
0
STAFF PROJECT REVIEW
Department: Engineering Development Review Contact: Marc Virata
Topic: Construction Drawings
Number: 188 Created: 02/18/2011
04/20/2011: We did receive feedback from CDOT earlier this week. In addition to previous
comments regarding concern on the trees in the landscape island, providing a subdrain,
and the use of barrier curb, the following comments were provided from CDOT:
1) Remove CDOT as a signature on the construction plans.
2) Please add lane width dimensions along College Avenue and explain any deficiencies to
CDOT's requirements.
3) Contact Gloria Hice-Idler to start coordinating CDOT approvals as access permits, a
utility permit, and a landscape permit will be required. Because there's changes to existing
accesses, creation of new accesses, and closures of existing, several access permits will
be required but these can all be applied for using a single set of plans.
[2/18/11] CDOT met with the City on 2/18 and indicated that they needed to have additional
discussion internal to CDOT as to how the median improvements should be constructed
given the successive overlays to College (referring back to #151 and #152). They
anticipate having comments completed by next Friday (the 25th).
Number: 191 Created: 04/20/2011
04/20/2011: The CLOMR sheets indicated for reference only, if needing to be included in
the construction plan set will require that the sheet numbering be revised to show a total
sheet number more than 29 (and the plat should be included in the total sheet number as
well).
Topic: _General
Number: 149 Created: 02/16/2011
04/20/2011: With the proposed landscaping now shown on the drawings some input from
CDOT in this regard: 1) CDOT indicates that they will not support the placement of street
trees in the median. The City is currently doing further analysis on this and may wish to
pursue appealing CDOT's decision (a sight distance analysis of the street tree placement
is forthcoming from Ward Stanford). 2) CDOT requires the installation of an underdrain
system as a result of the landscaping of this median.
[2/16/111 What is the manner in which the landscaping being removed will be mitigated
with the median reduction taking place in College Avenue that removes several trees and
landscaping? I'm understanding that Community Development and Neighborhood
Services has a general concern about the landscaping and trees that along the median in
College Avenue that would be removed with the construction of the larger left turn lane
onto the site. Will the installation of the new median directly north result in the installation of
low lying plantings as mitigation for the lost landscaping. Will the narrowed down median
that creates the longer left turn lane have landscaping installed?
Department: Engineering Development Review Contact: Marc Virata
Topic: General
Number: 154 Created: 02/16/2011
04/20/2011: The signing and striping plan show this being provided off the access from
Stuart but doesn't appear to be provided off the access from College. Can an additional
sign be placed to provide this indication off College Avenue?
City of
Fort Collin.
STAFF PROJECT REVIEW
April 22, 2011
Matt Blakely
Jim Sell Design
153 W Mountain Ave
Fort Collins, CO 80524
City staff and outside reviewing agencies have reviewed your submittal for Choice Center
Mixed -Use Redevelopment, and we offer the following comments:
Department: Engineering Development Review Contact: Marc Virata
Topic: Construction Drawings
Number: 150 Created: 02/16/2011
04/20/2011: Additional comments from CDOT are found elsewhere in my comments.
Note though that CDOT standard M-609-1 (both sheets) should be provided as a detail.
Comments further herein outline CDOT wanting to use barrier curb, this should pertain to
Curb Type 2 (6" Barrier) with a variable depth as further prescribed and dowelling to
existing similar to Curb Type 4 (6" Barrier).
[2/16/11] CDOT M&S Standards should be provided in the construction details pertaining
to the improvements in -College Avenue and referenced in -the plans. The -City is meeting -- - --- with CDOT at our monthly coordination meeting this Friday and may have additional
comments/concerns following the Wednesday morning meeting. The following three
comments are thoughts I had specific to the new construction/reconstruction along the
median in College Avenue and may be further refined pending input from CDOT.
Number: 152 Created: 02/16/2011
04/20/2011: Feedback from CDOT indicates that they will require barrier curb (without a
gutter) to instead be installed for the new concrete ribbon median as well as the new curb
for the median porkchop. The depth of the barrier curb for the median ribbons will need to
match the depth of the surrounding existing curb and gutter and dowelled per CDOT
criteria. The depth of the barrier curb for the new median porkchop will need to be at a
minimum the projected curb and gutter depth of the barrier curb medians on either side.
[2/16/11] The apparent new concrete "ribbon" median extending the left turn stack into the
site should have additional information on sheet 15. Please indicate a flowline to flowline
width of this median. If it's intended that the existing median along the west side of College
is to remain, how will the new median transition to the existing median? It seems that the
existing median no longer has the gutter at existing finished grade due to successive
overlays and the new median gutter would need to then be set below finished grade in
order to tie into existing. Please provide spot elevations along the gutter (or final pavement
grade if gutter is set below) along with cross -sections at several locations in order to
understand how drainage along the extended turn lane is intended to function.