HomeMy WebLinkAboutCHOICE CENTER MIXED-USE REDEVELOPMENT - FDP - FDP110002 - CORRESPONDENCE - (4)City of F&I Collins STAFF PROJECT REVIEW 04/19/2011: Provide profile of entire length of water main lowering A to insure that all conflicts are resolved and connections can be made in reasonable manner. Department: Water -Wastewater Engineering Contact: Roger Buffington Topic: Construction Drawings Number: 2 Created: 04/19/2011 04/19/2011: One of the water service connections to Bldg 1 is currently shown within the limits of water main lowering B. Can this be revised to avoid having fittings between the 8-inch water main and the meter vault? Number: 4 Created: 04/20/2011 04/20/2011: See redlined utility plans for other comments. Topic: General Number: 3 Created: 04/20/2011 04/20/2011: The utility plans and the landscape plan are showing different information for water and sewer services. Revise plans to reflect the same information. Topic: Plat Number: 142 Created: 02/15/2011 04/20/2011: The utility easement on the east side of Choice Center Drive must extend 15 feet to the east of the sanitary sewer and must include the curb stops and fire hydrant along the east side of this drive. (2/15/11] Provide utility easements as follows: Water mains - 10 feet each side of main (20 feet total); Sanitary sewer - 15 feet each side of sewer (30 feet total). This applies to existing and proposed lines. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to contact me at 970-221-6343. Sincerely, Ted Shepard Chief Planner City, of Flirt Collin STAFF PROJECT REVIEW Number: 198 Created: 02/23/2011 [2/23/11] Utility Plans - S&S Plan,.sht 18: Remove the word "STOP" at all locations that also have an R1-1 sign. On -going maintenance issue and unnecessary. Department: Traffic Operation Contact: Ward Stanford Topic: Construction Drawings Number: 199 Created: 02/23/2011 [2/23/11] Utility Plans - S&S Plan, sht 18: Remove the R3-5R sign at the exit of Choice Center Drive onto College. The median and the R3-1 sign give adequate info to motorists that there only option is to the right. Number: 200 Created: 02/23/2011 (2/23/11) Utility Plans - S&S Plan, sht 18: Remove the thru/right roadway stencil on Stuart at College. Topic: Traffic Impact Study Number: 201 Created: 02/23/2011 [2/23/11 ] Please provide a copy of the most currant TIS with the next submittal. Number: 202 Created: 02/24/2011 [2/24/111 A TIS memo discussing the changes from the original plan was to be provided, but was not received. Please provide the TIS memo with the next resubmittal. Department: Water -Wastewater Engineering Contact: Roger Buffington Topic: Construction Drawings Number: 137 Created: 02/15/2011 04/19/2011: A meeting is needed to clarify the water service sizing. Some of the information seems to be conflicting and the proposed sizes seems quite large. [2/15/111 Provide water service sizing calculations for the buildings with residential units. Number: 140 Created: 02/15/2011 04/19/2011: The objective is to abandoned the existing 6-inch main west of Bldg 4 and re -connect the Bldg 4 water service to the new 8-inch main. [2/15/11] The existing water main to the west of Existing Bldg 4 appears to have several conflicts with landscaping and new curb and gutter. Schedule meeting to review re-routing this main. Number: 143 Created: 02/15/2011 04/20/2011: Revise the easements shown on the overall utility plan to reflect changes noted in Issue ID 142 pertaining to the plat. [2/15/111 Show easements on utility plans consistent with comment 142 and plat. Number: 145 Created: 02/15/2011 04/19/2011: Match crowns where 12-inch sewer connects to existing 21-inch sewer. This will necessitate adjustment of the storm drain to maintain minimum slope on the sanitary sewer. [2/15/11] Label elevation of the existing sewer invert at San MH-1. Number: 1 Created: 04/19/2011 City of Fort Collins STAFF PROJECT REVIEW floodplain until the LOMR is approved by FEMA, and until an Elevation Certificate is approved for any buildings in the floodplain, especially at Building #1. 20. Please make sure that all information (plans, designs, calculations, descriptions, etc.) in the CLOMR and LOMR submittals match the Development Plan. Department: Technical Services Contact: Jeff County Topic: Construction Drawings Number: 204 Created: 03/17/2011 04/20/2011: There are still line over text issues on sheets 9 & 18. [3/17/11] There are line over text issues on sheets 7-11, 13 & 14; 16 & 17 of the Utility Plans. Number: 211 Created: 04/20/2011 04/20/2011: The Subdivision Plat & CLOMR Plans are not in the order shown on the index. Number: 212 Created: 04/20/2011 04/20/2011: There are many line over text issues on the CLOMR Plans, Topic: Plat Number: 190 Created: 02/22/2011 04/20/2011: The boundary & legal close. [2122/11] The Subdivision Plat boundary & legal close. - Number: 207 Created: 04/20/2011 04/20/2011: What are the 2 lots? or tracts? at the southwest corner of the plat? Number: 208 Created:- 04/20/2011 04/20/2011: Please add the missing reception numbers to the legal description. Topic: Site Plan Number: 209 Created: 04/20/2011 04/20/2011: The legal description on sheet 1 does not match the Subdivision Plat. Number: 210 Created: 04/20/2011 04/20/2011: The benchmark on sheet 1 does not match the Utility Plans and is incorrect. Department: Traffic Operation Contact: Ward Stanford Topic: Construction Drawings Number: 197 Created: 02/23/2011 [2/23/111 Utility Plans - S&S Plan, sht 18, Stuart St S&S detail: move the Stop Bar to the right hand side of the access from the parking lot. Delete the word "STOP" also. It's an on -going maintenance issue and not necessary since there is an R1-1 sign. Clty of Fart Collins STAFF PROJECT REVIEW Landscape Plans: 10. Landscape plans must be consistent with specifications in CLOMR. 11. Include irrigation where specified by CLOMR. 12. Ensure vegetation type in flood control channel matches that required in CLOMR. Add Standard Notes1) All activities in the current effective floodplain and floodway are subject to the requirements of Chapter 10 of City Municipal Code. 2) No storage of materials or equipment in the floodway before, during and after construction. 3) All activities in the floodplain and floodway must be pre -approved through floodplain use permit and no -rise certifications. No certificate of occupancy will be issued without no -rise re -certifications and FEMA Elevation Certificates. 4) Landscape changes in the floodplain Department: Stormwater Engineering Contact: Wes Lamarque Topic: General and floodway must be pre -approved through floodplain use permit and no -rise certifications. 5) All proposed conditions determined by CLOMR Case number 09-08-0735R effective January 29, 2010. 6) Placement of new vegetation in the floodway in a location or of a quantity or type that is determined to likely result upon maturity in an increase in base flood elevations is prohibited. No -rise certification is required for all site work including landscaping within the floodway. 7) Add note specifying the required maintenance of the flood control channel per the.CLOMR. 13. Add flood control channel revetment information in separate sheets. Include the plan view and any details necessary for construction from the CLOMR. 14. Add Floodplain Exhibit to landscape plans. Drainage Report: 15. Please see redlines for changes and comments. 16. Pg 6. Add Finished Floor and HVAC elevations. Add statement that these are higher than the RFPE. 17. See redlines for updated reference information. September 29, 2008 Comments: 18. A Letter Of Map Revision (LOMR) is required immediately after completion of non-structural development activities at the Choice Center site, per City Code 10-45(2)(b). The LOMR application shall be approved by City staff and FEMA before a building permit can be issued. A floodplain use permit shall be approved for Building #1 before the building permit can be approved. 19. A Certificate of Occupancy shall not be issued for structures in the current effective City of F&t' Collins STAFF PROJECT REVIEW Department: Stormwater Engineering Contact: Wes Lamarque Topic: General Number: 189 Created: 04/22/2011 04/22/2011: Please label all details and reference them to all improvements in the plan set. Some improvements were not referenced and some details were not labeled. Number: 190 Created: 04/22/2011 04122/2011: Please label the drainage easements on the plat for the PLDs. Number: 191 Created: 04/22/2011 04/22/2011: Please document in the drainage report how there is no emergency spill for basins b2a, b2b, and b2c, which was discussed over the phone, and list the reasons for this. ADA requirements for the building was one reason. Also, basin b2c is not discussed in the report. Department: Stormwater Engineering Contact: Wes Lamarque Topic: General Number: 192 Created: 04/22/2011 04/22/2011: Floodplain Administration Comments Contact: Brian Varrella 970-416-2217 Site Plan: 1. Please modify per redlines. 2. Remove all floodplain line work from site plan. Add Floodplain Exhibit to Plan set and reference in a note on the Site Plan. Utility Plans: 3. Please modify per redlines. 4. CLOMR work maps: remove from plan set sheets 1 through 6 of 8. 5. General Notes: move floodplain related notes to section F. Floodplain Information. 6. Grading, drainage and erosion control plans: Modify per redlines. 7. Add flood control channel revetment information in separate sheets. Include the plan view and any details necessary for construction from the CLOMR. 8. Erosion control and drainage details: check riprap detail as redlined. 9. Show tie in to Mason Street BRT stilling basin on plans. City of Fort Collins STAFF PROJECT REVIEW 04/22/2011: In progress. [2/17/11] Water draining from the south parking lot has increased the flows onto City Parks property and written permission is required to increase these flows. City Stormwater staff can assist in acquiring this. Number: 181 Created: 02/17/2011 04/22/2011: 1 could not find the cross-section. Please add it to the landscape plan and the drainage details in the utility plan set. (2/17/11] Please provide a detail (cross-section) for the grass buffer being proposed to provide water quality mitigation for the southern parking lot. Number: 182 Created: 02/17/2011 04/22/2011: There is no drainage easement on the plat. Storm sewers should be in a drainage easement, not utility. [2/17/11] Please provide a drainage easement with a minimum width of 20 feet for the storm sewer in Choice Center Drive. The pipe should be centered within the easement. Number: 184 Created: 02/17/2011 [2/17/11] There is a few areas that need more detail regarding grading to help clarify drainage patterns and to ensure the site gets built per the plans. Please see redlines. Number: 185 Created: 02/17/2011 04/22/2011: The unit price per acre is now $1,000 per acre. Please revise. [2/17/11] Please provide an erosion escrow amount in the drainage report. Number: 186 Created: 04/19/2011 04/19/2011: More information is needed on the connection of the flood control channel with Spring Creek. In referencing the CLOMR for the flood channel, it appears that low flows in Spring Creek will back up into the flood channel. This will create a wetland within the flood channel. The plans also do not show the scour protection within Spring Creek that was designed with the BRT CLOMR. Coordination needs to take place between these two projects for a design that meets all parties design needs and City requirements. Number: 187 Created: 04/19/2011 04/19/2011: The outfall for the proposed storm sewer still needs to be completed and agreed on by all parties. Number: 188 Created: 04/22/2011 04/22/2011: The City is requesting that the proposed 12-inch storm sewer conveying flows from west of the railroad be upsized to a 30-inch pipe. This is required to avoid having public water west of the railroad bubble up out of the proposed inlet and travel south in the private flood control channel. This option would eliminate, legal, liability, and maintenance issues. City of Flirt Collins r�� STAFF PROJECT REVIEW Topic: General Number: 136 Created: 02/15/2011 PUBLIC -SAFETY RADIO AMPLIFICATION SYSTEM Where adequate radio coverage cannot be established within a building, public -safety radio amplification systems shall be installed in the following locations: 1. New buildings greater than 50,000 SF in size or addition(s) to an existing building that cause the building to be greater than 50,000 SF. For the purpose of this section, fire walls shall not be used to define separate buildings. 2. All new basements greater than 10,000 SF where the designed occupant load is greater than 50, regardless of the occupancy classification. 3. Existing buildings meeting the criteria of Items 1 and 2 of this section undergoing alterations exceeding 50 percent of the aggregate area of the building. Public -safety radio amplification systems shall be designed and installed in accordance with criteria established by Poudre Fire Authority. PFA Fire Prevention Bureau Administrative Policy 07-01 Number: 1 Created: 04/18/2011 04/18/2011: The Site Plan does not show/label the Emergency Access Easement; however, it does show other easements. For consistency, please include the EAE on the Site Plan. Also, please get with me to finalize where FIRE LANE - NO PARKING signs should be installed and to get sign templates. Department: Stormwater Engineering Contact: Wes Lamarque Topic: General Number: 174 Created: 02/17/2011 04/22/2011: Our office's opinion is that it would not have an impact on the capacity of the channel. If the pan were to stay, another water quality option would have to be provided for these sub -basins. [2/17/11 ] The report states that sub -basins C1 b and C1 c are being treated for water quality in the grass swale used as the floodway channel. This channel could be used for water quality mitigation if the 3-foot pan was removed. If the pan can not be removed, other mitigation would be required. Number: 178 Created: 02/17/2011 04/22/2011: The table seems to be missing some information. Table b-2 describes the media section and is not included. [2/17/11] Please include construction details for the PLDs per the Urban Drainage Manual. Department: Stormwater Engineering Contact: Wes Lamarque Topic: General Number: 179 Created: 02/17/2011 04/22/2011: In progress. [2/17/11 ] Please provide easement documentation for the storm sewer located on City Parks property. Number: 180 Created: 02/17/2011 City of Flirt Collins STAFF PROJECT REVIEW to illustrate Spring Creek and provide a detail, similar to those on Sheet 14, that is a cross-section of this outfall area. [9/23/08] have not seen utility plans, as soon as I do, I'll provide comment. [7/29/08] Provide plan and profile of storm draim line adjacent to Spring Creek, between SDMH-OS1and SDMH-OS2. The creek and the retaining wall are very close together, which may have impacts to the creek. Topic: Landscape Plans Number: 82 Created: 04/18/2011 04/20/2011: As per the staff review discussion on 4/20/11 - please confirm that no changes to the existing planting plan within the buffer area will take place. If changes are to take place, please send me a copy of the revisions for review. Department: Forestry Contact: Tim Buchanan Topic: Landscape Plans Number: 1 Created: 04/22/2011 04/22/2011: Increase the number of mitigation trees listed in the Plant Schedule from 51-56 to correspond with the required number in mitigation schedule. Department: Light And Power Contact: Doug Martine Topic: Construction Drawings Number: 130 Created: 01 /25/2011 [1/25%11] The electric service to the existing Discount Tire store is 120/240 Volt open delta 3 phase. If this service is relocated as shown on the utility plan, it will be 120/208 Volt wye three phase. The developer will need to coordinate with Discount Tire to change the voltage, which may involve replacing equipment in the building. The developer will be responsible for installation of the new electric service from the transformer to the meter on the building. Number: 131 Created: 01/25/2011 [1/25/11] It appears that there is only 24 Ft. between buildings 2 & 3. The plan shows 2 sewer services, a water service, a fire water line, and an electric service in this area. Installation as well as maintenance of these is such close proximity may be challenging or impossible. A utility coordination meeting is encouraged before plans are finalized. Department: Light And Power Contact: Doug Martine Topic: Construction Drawings Number: 132 Created: 01 /25/2011 [1/25/11] The water main in Choice Center Dr. will need to be moved a minimum of 7 Ft. to the east of the location shown to provide space for installation of the high voltage electric system. This may result in the necessity to relocate the sewer main. A utility coordination meeting is encouraged before plans are finalized. Department: PFA Contact: Carie Dann 0 City of Flirt Collins STAFF PROJECT REVIEW [2/16/11 ] It doesn't appear that "Choice Center Drive" street signs are indicated to be installed on the signing and striping plan. If desired (or required) however, wherever street signs are posted indicating the private "Choice Center Drive", please provide separate informational signage (black lettering on white background ) below (at about 5' off the ground) indicating "Choice Center Drive privately owned and maintained". Please provide a detail of this on the details sheet. This is in the same manner as to how Council Tree Avenue (a private drive) in Front Range Village was addressed. Number: 169 Created: 02/16/2011 04/20/2011: Carried over for reference. It is suggested that the plat be used to create a map type exhibit of the various easement dedications/vacations (turning off other layers other than property boundaries) along with an accompanying table indicating each easement along with the identified Grantor and Grantee for each for dedications and the party consenting for vacations. [2/16/11] Is there a reference document already compiled that lists the various dedications and vacations of easements that are required both onsite and offsite? It is suggested that this document be provided for review and will then be used as a "check -off' for verification and agreement with all that all the required approvals are obtained prior to final plan approval. Number: 189 Created: 02/18/2011 04/20/2011: 1 didn't come across this info, perhaps an electronic version can be provided that we can provide a copy to CDOT? [2/18/11 ] CDOT and the City would like to see an updated traffic memo/letter with the consultant's traffic engineer indicating what changes (if any) to the proposed land use and resulting trip generation may have taken place between the PDP (pre -hearing) submittal and with -the present final plan submittal, and the impacts. (if any) that may result. Number: 192 Created: 04/22/2011 04/22/2011: Just as a heads -up, I've received feedback from City Engineering, Capital Projects -Street Oversizing that the City provides reimbursement for the oversized portions of street components only to the extent that what was there previously is either substandard or non-existent. With the construction of new detached sidewalk, reimbursement from the local to oversized condition is only to the extent that there is either no sidewalk or non -compliant (less than ADA width) sidewalk previously in place. Thus the portions of existing attached sidewalk that are being removed and installed as detached will not have reimbursement rights extended to the applicant. Topic: Plat Number: 190 Created: 04/20/2011 04/20/2011: Porous Landscape Detention being defined on the plat seems unusual. Is this intended to be a drainage easement? Department: Environmental Planning Contact: Lindsay Ex Topic: Construction Drawings Number: 81 Created: 04/18/2011 04/18/2011: Will review this detail when it has been finalized. [2/16/11] As per Dana Leavitt's original comment, thank you for providing the profile of the storm headwall. However, as Spring Creek is not depicted in this profile, one cannot assess the connection between the storm outfall and the creek. Please revise this profile City of Fort Collins 0 STAFF PROJECT REVIEW Department: Engineering Development Review Contact: Marc Virata Topic: Construction Drawings Number: 188 Created: 02/18/2011 04/20/2011: We did receive feedback from CDOT earlier this week. In addition to previous comments regarding concern on the trees in the landscape island, providing a subdrain, and the use of barrier curb, the following comments were provided from CDOT: 1) Remove CDOT as a signature on the construction plans. 2) Please add lane width dimensions along College Avenue and explain any deficiencies to CDOT's requirements. 3) Contact Gloria Hice-Idler to start coordinating CDOT approvals as access permits, a utility permit, and a landscape permit will be required. Because there's changes to existing accesses, creation of new accesses, and closures of existing, several access permits will be required but these can all be applied for using a single set of plans. [2/18/11] CDOT met with the City on 2/18 and indicated that they needed to have additional discussion internal to CDOT as to how the median improvements should be constructed given the successive overlays to College (referring back to #151 and #152). They anticipate having comments completed by next Friday (the 25th). Number: 191 Created: 04/20/2011 04/20/2011: The CLOMR sheets indicated for reference only, if needing to be included in the construction plan set will require that the sheet numbering be revised to show a total sheet number more than 29 (and the plat should be included in the total sheet number as well). Topic: _General Number: 149 Created: 02/16/2011 04/20/2011: With the proposed landscaping now shown on the drawings some input from CDOT in this regard: 1) CDOT indicates that they will not support the placement of street trees in the median. The City is currently doing further analysis on this and may wish to pursue appealing CDOT's decision (a sight distance analysis of the street tree placement is forthcoming from Ward Stanford). 2) CDOT requires the installation of an underdrain system as a result of the landscaping of this median. [2/16/111 What is the manner in which the landscaping being removed will be mitigated with the median reduction taking place in College Avenue that removes several trees and landscaping? I'm understanding that Community Development and Neighborhood Services has a general concern about the landscaping and trees that along the median in College Avenue that would be removed with the construction of the larger left turn lane onto the site. Will the installation of the new median directly north result in the installation of low lying plantings as mitigation for the lost landscaping. Will the narrowed down median that creates the longer left turn lane have landscaping installed? Department: Engineering Development Review Contact: Marc Virata Topic: General Number: 154 Created: 02/16/2011 04/20/2011: The signing and striping plan show this being provided off the access from Stuart but doesn't appear to be provided off the access from College. Can an additional sign be placed to provide this indication off College Avenue? City of Fort Collin. STAFF PROJECT REVIEW April 22, 2011 Matt Blakely Jim Sell Design 153 W Mountain Ave Fort Collins, CO 80524 City staff and outside reviewing agencies have reviewed your submittal for Choice Center Mixed -Use Redevelopment, and we offer the following comments: Department: Engineering Development Review Contact: Marc Virata Topic: Construction Drawings Number: 150 Created: 02/16/2011 04/20/2011: Additional comments from CDOT are found elsewhere in my comments. Note though that CDOT standard M-609-1 (both sheets) should be provided as a detail. Comments further herein outline CDOT wanting to use barrier curb, this should pertain to Curb Type 2 (6" Barrier) with a variable depth as further prescribed and dowelling to existing similar to Curb Type 4 (6" Barrier). [2/16/11] CDOT M&S Standards should be provided in the construction details pertaining to the improvements in -College Avenue and referenced in -the plans. The -City is meeting -- - --- with CDOT at our monthly coordination meeting this Friday and may have additional comments/concerns following the Wednesday morning meeting. The following three comments are thoughts I had specific to the new construction/reconstruction along the median in College Avenue and may be further refined pending input from CDOT. Number: 152 Created: 02/16/2011 04/20/2011: Feedback from CDOT indicates that they will require barrier curb (without a gutter) to instead be installed for the new concrete ribbon median as well as the new curb for the median porkchop. The depth of the barrier curb for the median ribbons will need to match the depth of the surrounding existing curb and gutter and dowelled per CDOT criteria. The depth of the barrier curb for the new median porkchop will need to be at a minimum the projected curb and gutter depth of the barrier curb medians on either side. [2/16/11] The apparent new concrete "ribbon" median extending the left turn stack into the site should have additional information on sheet 15. Please indicate a flowline to flowline width of this median. If it's intended that the existing median along the west side of College is to remain, how will the new median transition to the existing median? It seems that the existing median no longer has the gutter at existing finished grade due to successive overlays and the new median gutter would need to then be set below finished grade in order to tie into existing. Please provide spot elevations along the gutter (or final pavement grade if gutter is set below) along with cross -sections at several locations in order to understand how drainage along the extended turn lane is intended to function.