HomeMy WebLinkAbout800, 808 & 814 W. PROSPECT RD. MIXED-USE (OBSERVATORY PARK) - PDP - 41-02A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYIV. CONCLUSIONS
This study assessed the impacts of the 808 West Prospect
Residential development on the short range (2006) street system in the
vicinity of the proposed development. As a result of this analysis, the
following is concluded:
The development of the 808 West Prospect Residential site is
feasible from a traffic engineering standpoint. At full
development, the 808 West Prospect Residential development will
generate approximately 140 external daily trip ends, 11 external
morning peak hour trip ends, and 13 external afternoon peak hour
trip ends.
Currently, the key intersections operate acceptably with current
control and geometry.
In the short range (2006) background traffic future, the key
- intersections will operate acceptably.
In the short range (2006) future, given full development of the
808 West Prospect Residential development and an increase in
' background traffic, the key intersections will operate acceptably.
The short range (2006) geometry is shown in Figure 9.
- Acceptable level of service will be achieved for bicycle and
transit modes based upon the measures in the multi -modal
transportation guidelines. Acceptable level of service for some
pedestrian factors cannot be achieved in this area of Fort
Collins.
19
IBicycle Level of Service
Based upon Fort Collins bicycle LOS criteria, there are no
destination areas within 1320 feet of the 808 West Prospect Residential
development. The bicycle LOS worksheet is provided in Appendix F.
Transit Level of Service
This area of Fort Collins is served by Routes 2, 7, 62, and 63.
All of these routes are within 0.25 miles of this site. The Fort
Collins Transit System Map shows that Shields Street will be a high
frequency corridor with 20 minute service. Shields Street is more
than 0.25 miles from this site. Appendix F contains a transit
worksheet for the four specific transit destinations mentioned in the
"Multimodal Transportation Level of Service Manual." The transit
level of service will be acceptable.
18
U)
L
U)
j L
C
J
U
N
Q
N
U
IL
- Denotes Lane
SHORT RANGE (2006) GEOMETRY
17
Prospect
Figure 9
TABLE 4
Short Range (2006) Total Peak Hour Operation
Intersection
Movement
Level of Service.
AM
FM
Shields/Prospect
(signal)
EB LT
D
D
EBT
C
C
EB RT
C
C
EB APPROACH
C
D
WB LT
D
E
WB T/RT
C
D
WBAPPROACH
C
D
NB LT
B
E
NB T
C
C
NB RT
B
A
NB APPROACH
C
C
SB LT
E
D
SBT
C
D
SB RT
A
B
SBAPPROACH
C
D
OVERALL
C
D
Prospect Rd./Prospect Ln.
(stop sign)
NB LT/T/RT
C i
D
SB LT/T/RT
B
D
EB T/LT
A
B
WB TILT
B
A
16
TABLE 3
Short Range (2006) Background Peak Hour Operation
Intersection
Movement
Level of Service
AM
PEA
Shields/Prospect
(signal)
EB LT
D
D
EBT
C
C
EB RT
C
C
EB APPROACH
C
D
WB LT
D
E
WB WRT
C
D
WB APPROACH
C
D
NB LT
B
E
NB T
C
C
NB RT
B
A
NB APPROACH
C
C
SB LT
E
D
SBT
C
D
SB RT
A
B
SB APPROACH
C
D
OVERALL
C
D
Prospect Rd./Prospect Ln.
(stop sign)
NB LT/RT
C
C
WB T/LT
B
A
15
� rn
1l- N N
N \ N
00 (D CO
(0 n T
358/207
776/384 —
208/167
111/102
© 213/605
83/275
f r
(o Co v
"Kt LO T
N OLD \
T
r rn
0
--a- AM/PM '
SHORT RANGE (2006) TOTAL
PEAK HOUR TRAFFIC
2
N_ O N
'Cr Z Lo
1/4
1107/729 —
4/5
M�
U)
U
Q
N
n
1/5
-� 398/995
2/8
rProspect
LO g v
o O rn
Z
Figure 8
14
U)
®— AM/PM
U)
U)
m
V!
O
1
a
Ea
)ect
SITE GENERATED PEAK HOUR TRAFFIC Figure 7
13
U)
Lo
I-- N N
c0 ` N
co co ^ 109/101
`° ',- - 213/605
81 /274
358/207 4 (�
776/384 I I I
N
208/167 N O
P- co cf)
M r
- 398/995
2/8
1107/729 -
4/5
Lo v
cD rn
--mm-- AM/PM
SHORT RANGE (2006) BACKGROUND
PEAK HOUR TRAFFIC
Prospect
Figure 6
12
Background Traffic Projections
Figure 6 shows the short range (2006) background traffic
projections. Background traffic projections for the short range future
horizon was obtained by reviewing the NFRRTP and various traffic studies
for other developments in the area.
Trip Assignment
Trip assignment is how the generated and distributed trips are
expected to be loaded on the street system. The assigned trips are the
resultant of the trip distribution process. Figure 7 shows the site
generated peak hour traffic assignment. Figure 8 shows the total (site
plus background) short range (2006) peak hour traffic at the key
intersections.
Operation Analysis
Capacity analyses were performed at the key intersections. The
operations analyses were conducted for the short. range analysis,
reflecting a year 2006 condition.
Using the traffic volumes shown in Figure 6 and the existing
geometrics, the key intersections operate in the short range (2006)
background traffic future as indicated in Table 3. Calculation forms
for these analyses are provided in Appendix D. The key intersections
operate acceptably during both the morning and afternoon peak hours.
Using the traffic volumes shown in Figure 8, the key
intersections operate in the short range (2006) total traffic future
as indicated in Table 4. Calculation forms for these analyses are
provided in Appendix E. The key intersections operate acceptably during
both the morning and afternoon peak hours. The short range (2006)
geometry is shown in Figure 9.
Pedestrian Level of Service
Appendix F shows a map of the area that is within 1320 feet of
the 808 West Prospect Residential development. There will be two
pedestrian destinations within a quarter mile of the 808 West Prospect
Residential development. These are 1) Colorado State University and
2) the various residential uses south of Prospect Road. This site is
in an area termed "Pedestrian District." The minimum level of service
for "Pedestrian District" is A for all measured categories, except for
street crossings which is B. The site plan shows a pedestrian/bicycle
connection to the north that will provide access to Colorado State
University. As indicated on the Pedestrian LOS Worksheet, the minimum
level of service for some categories cannot be achieved for
destination area 2. There is nothing that this development can do to
increase the level of service for those factors that are less than the
standard.
11
I
I
i
I
I
I
I
I
TRIP DISTRIBUTION
pio.",
sect
Figure 5
10
I
10
WEST PROSPECT ROAD
SITE PLAN
SCALE: 1'=50'
�Us go OL--- -
Uzi
Figure 4
9
II
it
III. PROPOSED DEVELOPMENT
The 808 West Prospect Residential development is a proposed
student efficiency apartment development, located east of Shields Street
and north of Prospect Road in Fort Collins. Figure 4 shows a site plan
of the 808 West Prospect Residential development. The short range
analysis (Year 2006) includes development of the 808 West Prospect
Residential site and an appropriate increase in background traffic.
Since this is an intermediate level transportation impact study, a long
range analysis is not required. The 808 West Prospect Residential
development will consist of 70 townhome dwelling units with an average
of 2 persons per dwelling unit.
Trip Generation
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street system.
Trip generation information contained in Trip Generation, 7"' Edition,
ITE was used to estimate trips that would be generated by the
proposed/expected uses at this site. Table 2 shows the expected trip
generation on a daily and peak hour basis. It should be noted that since
this is a student oriented residential development, most students will
walk or bike to class daily. Therefore, a 60 percent reduction was
taken for alternative modes travel. This is lower than the alternative
mode reduction used for the CSU student housing just to the northwest of
this site.
TABLE 2
Trip Generation
Code
Use "
Sim
AVVM'
1, AM Peak Hour
PM Peak Hour
-.Rya
Twp,
PAb'
- In
Rate:.
Out
Rmto
In
-Ram
out
-
230
Townhome
2.50
350
U.03
4
0.1fi
22
0.16
22
O.UB
11
Pelrssoons
60% altemalive modes
210
2
13
13
7
Total
140
2
9
9
4
Trip Distribution
Directional distribution of the generated trips was determined for
the 808 West Prospect Residential development based upon existing/
future travel patterns, land uses in the area, and consideration of
trip attractions/productions in the area. The existing roadways in
the area also play a role in developing the trip distribution. Figure
5 shows the trip distribution used for the short range (2006) analysis
future. The trip distribution is for the automobile trips that would
likely occur.
F:1
TABLE 1
Current Peak Hour Operation
Intersection
Movement
Level of Service
AM
PM
Shields/Prospect
(signal)
EB LT
D
D
EBT
C
C
EB RT
C
C
EB APPROACH
C
D
WB LT
D
E
WB T/RT
C
D
WB APPROACH
C
D
NB LT
B
E
NB T
C
C
NB RT
B
A
NB APPROACH
C
C
SB LT
D
D
SBT
C
D
SB RT
A
B
SB APPROACH
C
D
OVERALL
C
D
Prospect Rd./Prospect Ln.
(stop sign)
NB LT/RT
C
C
WB T/LT
g
A
J
IExisting Operation
The key intersections were evaluated using techniques provided in
the 2000 Highway Capacity Manual. Using the peak hour traffic shown in
Figure 3, the peak hour operation is shown in Table 1. Calculation
forms are provided in Appendix C. A description of level of service for
signalized and unsignalized intersections from the 2000 Highway Capacit
Manual and a table showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) are also provided in Appendix C. The key intersections
operate acceptably during both the morning and afternoon peak hours.
Pedestrian Facilities
Sidewalks exist along all streets.
Bicycle Facilities
There are bicycle lanes along Shields Street. There are no
' bicycle lanes along Prospect Road east of Shields Street. Due to the
width of Prospect Road, bicycle lanes cannot be incorporated into the
current cross section.
Transit Facilities
This area of Fort Collins is served by Routes 2, 7, 62, and 63.
All of these routes are within 0.25 miles of this site.
6
U)
L
O
V LO
cD '— N
�
^ 108/100
210/598
74/266
354/205 4
768/379
206/165 m Cl
N o
n 7 N
CO
co
AM/PM
2/8
1093/716 —
---, r
4/5
CD rn
ADJUSTED RECENT PEAK HOUR TRAFFIC
5
C
J
U
N
Q
N
O
4_
Prospect
Figure 3
O
V' LO
NCO r N
LO r 108/95
210/566
74/252
354/205
768/379 I (
T m GO
206/165 N
T
t, QN
00 T
W
387/1050
2/8
1093/716
4/5
ED rn
J
U
N
d
a
--caAM/PM
RECENT PEAK HOUR TRAFFIC
Syr
Prospect
Figure 2
4
SCALE: 1 =low
I SITE LOCATION Figure 1
II. EXISTING CONDITIONS
The location of the 808 West Prospect Residential development is
shown in Figure 1. It is important that a thorough understanding of the
existing conditions be presented.
Land Use
Land uses in the area are primarily institutional and residential.
The proposed 808 West Prospect Residential site is surrounded by
residential uses and CSU related land uses.
Streets
The primary streets near the 808 West Prospect Residential site
are Shields Street, Prospect Road, and Prospect Lane. Shields Street is
west of the 808 West Prospect Residential site. It is a north -south
street classified as a four -lane arterial on the Fort Collins Master
Street Plan. At Prospect Road, Shields Street has northbound and
southbound left -turn lanes, two travel lanes in each direction, and
northbound and southbound right -turn lanes. The Shields/Prospect
intersection has signal control. The existing speed limit in this area
is 35 mph south of Prospect Road and 30 mph north of Prospect Road.
Prospect Road is south (adjacent) of the 808 West Prospect
Residential site. It is an east -west street classified as a four -lane
arterial on the Fort Collins Master Street Plan. At Shields Street,
Prospect Road has eastbound and westbound dual left -turn lanes, two
travel lanes in each direction, and a westbound right -turn lane. The
existing speed limit in this area is 35 mph. Adjacent to the site,
Prospect Road has two eastbound lanes and two westbound lanes. All
turns are made from through travel lanes.
Prospect Lane is directly across Prospect Road from the proposed
808 West Prospect Residential site. It is a north -south street
classified as a local street on the Fort Collins Master Street Plan. At
Prospect Road, Prospect Lane has right -turn and left -turn movements
combined in a single lane. The Prospect/Prospect Ln. intersection has
stop sign control on Prospect Lane.
Existing Traffic
Recent peak hour traffic volumes are shown in Figure 2. The
counts at the key intersections were obtained in April 2004. Raw count
data is provided in Appendix B. In the afternoon peak hour in the
westbound direction, the "delta" between the counts was significant.
Therefore, an adjustment was made to bring the "delta" in -line with the
others. The adjusted recent peak hour traffic is shown in Figure 3.
z
I. INTRODUCTION
This intermediate transportation impact study addresses the
capacity, geometric, and control requirements at and near the proposed
808 West Prospect Residential development. This development is intended
to have efficiency apartments geared toward CSU students. The 808 West
Prospect Residential development is located east of Shields Street and
north of Prospect Road in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made
with the project planning consultant (Eastpoint Studio LLC) and the Fort
Collins Traffic Engineering Staff. The Transportation Impact Study Base
Assumptions form is provided in Appendix A. This intermediate
transportation impact study generally conforms to the format set forth
in the Fort Collins transportation impact study guidelines. The study
involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key
intersections; -
Conduct level of service evaluation of pedestrian, bicycle, and
transit modes of transportation.
1
LIST OF FIGURES
Figure
Page
1.
Site Location ........................................
3
2.
Recent Peak Hour Traffic .............................
4
3.
Adjusted Recent Peak Hour Traffic ....................
5
4.
Site Plan ............................................
9
5.
Trip Distribution ....................................
10
6.
Short Range (2006) Background Peak Hour Traffic ......
12
7.
Site Generated Peak Hour Traffic .....................
13
8.
Short Range (2006) Total Peak Hour Traffic ...........
14
9.
Short Range (2006) Geometry ..........................
17
APPENDIX
A Base Assumptions Form
B Recent Peak Hour Traffic
C Existing Peak Hour Operation/Level of Service Descriptions/Fort
Collins Motor Vehicle LOS Standards
E Short Range Background Peak Hour Operation
F Short Range Total Peak Hour Operation
G Pedestrian/Bicycle/Transit Level of Service Worksheets
TABLE OF CONTENTS
Page
I.
Introduction .........................................
1
II.
Existing Conditions ..................................
2
LandUse .............................................
2
Streets..............................................
2
Existing Traffic .....................................
2
Existing Operation ...................................
6
Pedestrian Facilities ................................
6
Bicycle Facilities ...................................
6
Transit Facilities ...................................
6
III.
Proposed Development .................................
8
TripGeneration ......................................
8
Trip Distribution ....................................
8
Background Traffic Projections .......................
11
TripAssignment ......................................
11
Operation Analysis ...................................
11
Pedestrian Level of Service ..........................
11
Bicycle Level of Service .............................
18
Transit Level of Service .............................
18
IV.
Conclusions ..........................................
19
LIST OF TABLES
Table
Page
1.
Current Peak Hour
Operation ..........................
7
2.
Trip Generation ......................................
8
3.
Short Range (2006)
Background Peak Hour Operation ....
15
4.
Short Range (2006)
Total Peak Hour Operation .........
16
808 WEST PROSPECT
RESIDENTIAL DEVELOPMENT
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
APRIL 2004
Prepared for:
Kevin Frazier
141 South College Avenue
Fort Collins,. CO 80524
Prepared by:
MATTHEW J. DELICH, P.E
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034