HomeMy WebLinkAbout800, 808 & 814 W. PROSPECT RD. MIXED-USE (OBSERVATORY PARK) - PDP - 41-02A - CORRESPONDENCE - (28)PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: September 23, 2002 TO: Technical Services
PROJECT: #41-02 808 West Prospect Road Mixed -Use PDP —
Type I (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
October 23, 2002
Note - PLEASE identify your redlines for future reference
�� �Uv,,,,e Sl�o4ld 5%Iou/d , tt5f' b� �YaZ�'ey � fuda�lvir/o..
14CA)✓m&nV7-1
, Aiz,5 /Uc- L�d'Ta��c'l(�LS�IGr3..1C.iUJ'lS�P,OW"/�G /Ws`GoIlA��G t�f{r.yW[s%,G[O.oVCo
OJ 1ciL 5c C_� Tf I
Z)d �/�/j�C-p ^7DO/7IC/J//,D0%.�!A. w
o/
Name (please print)
CHECK HERE IF YOU WISH TO RECENE COPIES OF REVISIONS
1�'Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
4012ftonaim"'i
City of Fort Collins
Project Comments Sheet
ityaf Part Collins Selected Departments
C
Department: Water Wastewater
Date: October 24, 2002
Prefect: 808 WEST PROSPECT MIXED USE PDP
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
October 23, 2002
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
38
Provide separate water/sewer services for each type of use in the proposed building
(I.e. residential/commercial). 14 (1 al1 ►- e-Jt+'A 1
39
Provide proposed demands for the domestic water and fire systems and the
estimated flow rates for the sanitary sewer line for our review. The existing water
mains and sanitary sewers in Prospect may not have adequate capacity. Developer
m y be reqquired to Take offsite improv ments to these systems. W e- 44.9d fkc
�tn,aft .1 ..,a ki1 &V0- lAe'l4ded.
40
Include a note that the fire line and water services must be extended into a
mechanical room with a back flow preventor and a floor drain sized to accept the
discharge from the back flow preventor. W e- haul ✓LowN -r" i.o, w &4,&- 1 relu
4101n-1 iefo +16f, 410Ak.
41
Meter pits may not be located in detention ponds. Retaining walls may not be
located in utility easements.
See, site, landscape and utility plans for other comments.
IMt�Fe• fill «C. T,4j4 VtAt' &f I-L& JI.iGWLIk•
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility ( Redline Utility �T Landscape
—i T Page 1
2. Your EFF calculations don't contain all the BMP's you are using and as a result, the
EFF doesn't exceed the PS for your plan, which it must.
3. Please add a note to the plan that states the information contained in your report
relating to the fact that the detention areas need to be excavated first and will act as
sediment traps, etc.
Page 2
Project Comments Sheet
Selected Departments
Cihvuf Curt Collin -
Department: Stormwater Utility
Date: October 28, 2002
Project: 808 WEST PROSPECT MIXED USE PDP
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
October 23, 2002
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: drainage
,4`I—
The detention ponds, or any drainage structures specific to this site, can not be in the
future right-of-way for Prospect Road. cc) e do moo+ An+c -hA e^ i'� ,2. 0. w
43
Please add water quality outlet structure detail. The detail should be similar to UDSCM,
Vol III detail with the trash rack at a 3 or 4 to 1 slope.
44
LP_4edse add basin summary, detention pond tables on the drainage plan. we e ddee( f!c
two *-key
147
Please investigate if off -site flows from the west will enter the site. Also, the grading
does not match existing contours on the west property boundary and some proposed
contours are missing. We- ti tJt W �&.. /eo? �l, c.oti TA,.+ mw. o tl
Please provide a drainage easement for detention ponds when Icoation is determined.
We uddel o- ��df
Topic: Erosion/Sediment Control
55 T�
cl--Erosion control notes and schedule need to be on the plan. W c a.l nl eJ o � U -A,; .r a,1'hte)4
C oLer�
Signature
I D/a.8/01
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat Site ✓ Drainage Report Other_
✓ Utility ✓ Redline Utility ✓ Landscape
Page I C{-
}��� Moote
Sir .R. + I�tsac .
ra-- The title shown Is incorrect, please rework dtle (for example: Frazier Subr being a /
rl�lat of...
14 ) fv� �GCl�4a.�t{ -i o 1= I LP4
Vf Please label all adjoining properties. W e, )pw4- o 14.b• Pit t
44B�_ Are there any existing easements? ,V D
Topic: Utility Plan cover sheet
1.9- Please include the legal description of the site below the title. We A 41 4A' J
26� The tide does not maatt�h the tides shown or; the site and Ian ape plans.
WLcis.awted -fke- I-,{/e ' ;k{ ji e 4n4JCV0Ve GLatittW
4.Y The plat should not be Included in the numbering of the plan set sheets.
22--� Please provide a reference to the soils report on the cover sheet. W e 4ti / ` o'r Cd'e"
Topic: Grading Plan
32 It appears that temporary construction easements will be needed on the north, east and west edges of the site for
the placement of the silt fence and the construction of the pan along the edge of the property. Please provide letters of
intent for these easements prior to hearing, and provide copies of the completed easements prior to signing of myiars.
Topic: Overall Utility Plan
2.3' Please provide a standard 7' attached sidewalk along Prospect.
2* . k Prospect has been recently rehabilitated, and street cut fees will be accordingly high.
BFi' Driveways onto arterials are required to use the radius -style drive approach. (,Je_ds.4&1e./ -iLe yiivh fod• s P•.�ii
26� Please submit a variance to not design the ultimate widening of Prospect. W C .41J 4 4JJ 4w-W rf / a Ind tJeA
QY Please show the spacing of the next closest driveways on both sides of the street Most likely a variance will be
required for this driveway location. Also, Is there an existing driveway cut to be closed? rtie •1,./ 4'Ait •+.( r, 'e
28-' A 30' wide fire lane is required adjacent to 3-scary or higher buildings. The lane shown is insufficient. (V e, C k a„Ied fo 30'
E9-� Where will the fire trucks turn around? Any private drive greater than 150' in length is required to have a
turnaround 100' in diameter at the end for emergency vehicles. 04 A a • e r )v ri- k ie,( +nG 16
Topic: Detail Sheet
333 Please use detail 7-29B for the drive approach and use detail D-10 for the sidewalk culvert CsJ C G1,4-qe-,14it 107i r'1
Page 2
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: October 28, 2002
Project: 808 WEST PROSPECT MIXED USE PDP
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
October 23, 2002
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
-
L-&' Additional Right of Way must be dedicated along Prospect. In this location, Prospect Is considered a constrained
arterial, with a corresponding total ROW of 102'. (The constrained arterial cross-section Is as follows: A 6' sidewalk, 8'
parkway, 7' bike lane, five 12' vehicle lanes, another 7' bike lane, 8' parkway, and 6' sidewalk.) Accordingly, this project
must dedicate an additional 21' of ROW for Prospect. Retaining walls and drainage facilities will not be allowed within the
ROW, so the site must be reconfigured. We djW, ca �, / Zl act f o6 l2.OW
4a' olc The access point onto Prospect may become a right -In, right -out only access In the future.
L{� The street trees need to be placed In the ultimate location. i-X c y o e •„ { ( t 1.+./lc.1'e r9pp.
112- The parkingsetback needs to be mea�ssured from the ultimate floEline of Prospect.
wt K&v& if 34.17,,» Hew w0. r-? 14,
45� Is It possible to share access with adjacent properties? (highly recommended) .tJ o.
30-- Where Is the proposed ped/bike connection to the North? Z+ S0i/ 7', s f eoJ/acf %0 00rA F L
4H-� The driveway cut width shown Is too narrow; a minimum 28' width Is required for access to 12 or more
multifamily units. LU CGA.t+fad if- -to 3a'
34 Please see the reclined plans and utility plan checklist for any additional comments. (FYI - The checklist should
have been submitted with this initial round of review and Is required of every project.)
Topic: Plat
Lk The standard 15' utility easement needs to be dedicated behind the Prospect ROW. Gd [ kovc +A' t-r
I*— An emergency access easement needs to be dedicated on the plat. W t it,.• c p u f ; 4L a„ ,'• 04 4
Signature
tD,z3,OZ_
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Y_ Site Drainage Report Other NUC1e'd/ S+
_ Utility �x Redline Utility _ Landscape
Page I
with the south exposure. We suggest that softer, more conservative and traditional building
materials be selected allowing the project to blend in as unobtrusively as possible.
A second neighborhood meeting will be required. The mailing list provided by A.P.O.
Colorado was in error as most addresses on the south side of Prospect were not included. We
have received a corrected list. At strategic time to hold the meeting will be after the
applicant and consulting team have had sufficient time to respond to these comments. Please
provide two weeks advance notice of when you are prepared to hold this meeting so we can
send out the letters with sufficient notification.
Be sure and return all of your redlined plans when you re -submit.
As always, please call if you have any questions regarding these issues or any other issues.
related to this project at 221-6750.
Sincerely:
I6�+t
Ted Shepard
Chief Planner
Page 6
Department: Water Wastewater Issue Contact: Jeff Hill
L-fir�ovide separate water/sewer services for each type of use in the proposed building (Le.
residential/commercial). r- f t"J a l I v e r- de »-Fi t/
L-115rovide proposed demands for the domestic water and fire systems and the estimated flow
rates for the sanitary sewer line for our review. The existing water mains and sanitary sewers
in Prospect may not have adequate capacity. Developer may be required to make.offsite
improvements to these systems. W e, h- o `f l e •l a .n a N A a ti 1 w, it &Ac/„We
t,Kclude a note that the fire line and water services must be extended into a mechanical room
with a back flow prevention device and a floordrain sized to accept the discAarge from the
back flow prevention device. Wa. k+.o. rit.ow� IFI;.&Li.p w• Je'°"e ^f• ♦tech++.c•/
)'00� •
[,? Eer pits may not be located in detention pponds. Retai ing wall$ may�I,of be located in
utility easements. M ll�t y p l +J 'i `� (n k.O. w. 17 -S M t r, ( e ww .
See site, landscape and utility plans for other comments.
Department: Zoning
Issue Contact: Jenny Nuckols
V. r. 2• Proposed site plan - very confusing at initial viewing. Would prefer to see building envelope
only on site plan, possibly a second site plan sowing the underground portion layout - a 2-
layer view.
V IQ- Show the back-up distance for parking stalls both underground as well as outside.
V F9- The number of parking stalls is misleading in the underground section - there are 15 standard
stalls and 2 HC stalls, please revise.
V Fx. Textured pedestrian crossing - will it be brick, stamped? Please clarify.
V r r-- Show distance to property lines from building envelope.
V F jr, Remove landscaping form the site plan - please show it on the landscape plan.
Department: Current Planning
v • F• Staff is concerned about the use of corrugated black metal siding on the south elevation.
This is not a typical residential building material found in most neighborhoods and yet the
south elevation will be the most visible. While we are keenly aware that the H-M-N zone
encourages the proposed housing type, we cannot help but think that such a contemporary
building material represents a radical departure from the existing character of the
neighborhood. We are concerned that the generous use of metal may cause glare, especially
Page 5
V. f:. Knox Box: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of every
new building equipped with a required fire sprinkler system or fire alarm system.
97 UFC 902.4; PFA Policy 88-20
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: drainage
the detention ponds, or any drainage structures specific to this site, cannot be in the future o k
right-of-way for Prospect Road. We, O�o n of hw v-c Po-111f in X.0. w.
Please add water quality outlet structure detail. The detail should be similar to UDSCM, Vol
III detail with the trash rack at a 3 or 4 to 1 slope.
Please add basin summary, detention pond tables on the drainage plan.
Please investigate if off -site flows from the west will enter the site. Also, the grading does
not match existing contours on the west property boundary and some proposed contours are
missing.
Please provide a drainage easement for detention ponds when lcoation is determined.
Topic: Erosion/Sediment Control
1. Erosion control notes and schedule need to be on the plan.
2. Your EFF calculations don't contain all the BMP's you are using and as a result, the EFF
doesn't exceed the PS for your plan, which it must.
3. Please add a note to the plan that states the information contained in your report relating to
the fact that the detention areas need to be excavated first and will act as sediment traps, etc.
Department: Transportation Planning Issue Contact: Tom Reiff
v F It is recommended that a meeting be set up with Transportation Planning to discuss the future
circulation pattern for this area as it redevelops for higher intensity according to the
neighborhood plan.
v• F Please be aware that this driveway may become a right-in/right-out access in the future as
improvements to Prospect occur.
The existing attached sidewalk will need to be widen to a minimum of 7 feet. It is
recommended that the sidewalk be widened to an 8 foot minimum since the sidewalk in this
location of town also srvep is the bi e way especially for CSU students.
WG hyvL ^4 C e, r( ew^ k 71
V . F. Please explain further how this project ties into the surrounding transportation system, such
as walkways, drive aisles, etc...
Page 4
-Ttreplat should not be included in the numbering of the plan set sheets. Ole —
Please provide a ref rence to the soils report on the cover sheet.
hue, p.o,14ee 1,f io1li G.rovt oti 0f,1014n.
Department: Light & Power
Issue Contact: Doug Martine
Location of the electric transformer shown on the utility plan must be changed due to
inadequate space (both horizontally & vertically).
It appears an elevator is planned for the building. Most elevators require 3 phase power
which is not available at this site.
Department: Natural Resources
Issue Contact: Doug Moore
The applicant needs to contact Tim Buchanan, City Forester to see if the trees that are
proposed to be removed may and if their loss will need to be mitigated. 3.2.1(F)
REQUEST: Please consider designing your trash enclosure to accommodate recycling
services.
Department: PFA
Issue Contact: Michael Chavez
Required Access: A fire lane is required. The fire lane shall be visible by painting and
signage, and maintained unobstructed. 97 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC
MOTE: With buildings three (3) stories in height a 30 foot fire lane is required on one side of
the building to facilitate aerial operations. wL I"" /Q""" 'F': c 1 e"t f o 30'
PFA Policy 85-5(B)
Dead -End Access: Dead-end fire apparatus roads in excess of 150 feet in length shall be
provided with approved provisions for the turning around of fire apparatus. 97 UFC
902.2.2.4
Address Numerals: Address numerals shall be visible from the street fronting the property,
and posted with a minimum of 6-inch numerals on a contrasting background. ( Bronze
numerals on brown brick are not acceptable) 97 UFC 901.4.4 Tbo hu•ur Uwwo r/f u:// EC {a
tester Supply: No commercial building can be greater then 300 feet from a fire hydrant. Fire
hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each
hydrant must be capable of delivering 1500 gallons of water per minute at a residual fpressure
of 20 psi. 97 UFC 901.2.2.2 Theo ii t F. /I. S3'Eaif of tt& S•E to.,.- D I#eG0�_
L-,dpnnkler Requirement: This proposed building shall be fire sprinklered. 97 UFC 1003.2.9
NOTE: The project has more then 16 units. The project is three(3) stories in height and a L P w:r/Ze ,
minimum 6-inch fire line is required.
Page 3
Topic: Grading Plan
It appears that temporary construction easements will be needed on the north, east and west
edges of the site for the placement of the silt fence and the construction of the pan along the
edge of the property. Please provide letters of intent for these easements prior to hearing, and
provide copies of the completed easements prior to signing of mylars.
Topic: Overall Utility Plan
Please provide a standard T attached sidewalk along Prospect.
We .19e + A 4 w 0 1 k +.71
prospect has been recently rehabilitated, and street cut fees will be accordingly high. ok-
-Drivewgtonto arterials are required to�tse the radt is -style drive approach.
We. aa1e/ to 7-Z9 8 Zo'B. 30' w� f4.
Tease submit a variance to not design the ultimate widening of Prospect.
We. PP0,04a A VAvianrt, a'" I f- Cr Incl..,/e./.
--'tease show the spacings of the next closest driveways on both sides of the street. Most
likely a variance will be required for this driveway location. Also, is there an existing
driveway cut to be closed? Thera arz 4wo of eweu.yr Le,41 c/•ioat r.d ow a new 3o'
W G inadc, a v Lbet 4wr.e re9.•d,.y let -f %o, d.,vrwayJ 0+ Lof'A jt;ies &6 Pkos,,,&
L-A-30' wide fire lane is required adjacent to 3-story or higher buildings. The lane shown is
insufficient. F i r es L4 me, Ls 30
Where will the fire trucks turn around? Any private drive greater than 150' in length is
requt ed to have a tymaround 100' in diameter at the end for emergency ve icles.
The b " � I a 1 % I will bB1Pr1-kl..4 in r+e✓ e4. rooeluawrc a -
Topic: Plat
Zte standard 15' utilit easement needs to be dedicated behind the Prospect ROW.
W. rheve"( /°. X W. '(/orfh Zl' 'Zs -( & Aw+ a IT
.Am -emergency access easement needs to be dedicated on the plat. w� a.Lla/ Fo f,L• Pit
Zhe-title shown is incorrect, please rework title (for example: Frazier Sub, being a replat
of...). W4 �MYa C.kalea I-Ac m—c 4o r-v4z-ier 1abo�i✓ rie. P/al•
-Pi'ease label all adjoining properties.
We t.bel.d o, S-,&. 'Plc f
Are there any existing easements?
Ad
Topic: Utility Plan cover sheet
Elease include the legal description of the sit below the title.
we- 0.< "Leyal �u c.
The -title does not match the titles shown on the site and landscape plan.
We C ka' jew -kith -;`/ . HG
D VI-10I P/,#-i t V.F/2 C�--I .( N.6 Jr,te � 1e-•/✓c+ivf�i�
Page 2
0
City of Fort Collins
STAFF PROJECT REVIEW
VF RIPLEY
DON BROOKSHIRE
401 W. MOUNTAIN AVE., #201
FORT COLLINS, CO 80521
Date: 10/31/2002
Staff has reviewed your submittal for 808 & 814 WEST PROSPECT MIXED USE PDP, and
we offer the following comments:
Department: Advance Planning
Issue Contact: Clark Mapes
Please note that Section 4.24(E)(2)(b) requires that there be no vehicle use area in the front
yard. The relationship of building to street must consist of doorway and front yard. The
zone was specifically written to capture the positive urban relationship of a building face to a
street and to place parking lots and drives to the side and rear.
Department: Engineering
Issue Contact: Katie Moore
Topic: Detail Sheet
Please use detail 7-29B for the drive approach and use detail D-10 for the sidewalk culvert.
lve, chA�I#A fo -1-via , Zo',e.. po'!ui/;R we Liss,( D-10 r dew•1k
Topic: General
,Additional Right of Way must be dedicated along Prospect. In this location, Prospect is
considered a constrained arterial, with a corresponding total ROW of 102'. (The constrained
arterial cross-section is as follows: A 6'sidewalk, 8' parkway, 7' bike lane, five 12'vehicle
lanes, another T bike lane, 8' parkway, and 6'sidewalk.) Accordingly, this project must
dedicate an additional 2l' of ROW for Prospect. Retaining walls and drainage facilities will
not be allow5w�ithin the ROW, so the site must be reconfigured.
IueGAave a sc l-ed 21,
The access point onto Prospect may become a right -in, right -out only access in the future.
V. F.Cp The street trees need to be placed in the ultimate location.
V. C The parking setback needs to be measured from the ultimate flowline of Prospect. :4 su 36
a61t possible to share access with adjacent properties? (highly recommended)
u•ti'osJIble.
V4:• t-Wiibre is the proposed ped/bike connection to the North? lu&tk it com41 ao4f 4oM Frei, t fo N•Asp. t}4e
driveway cut width shown is too narrow; a minimum 28' width is required for access to
12 or more multifamily units. We- Ckn.ye4 +o -1 -211 J zo' G.1. 30 w,d f[
Please see the redlined plans and utility plan checklist for any additional comments. (FYI -
The checklist should have been submitted with this initial round of review and is required of
every project.)
Page 1