63. We are proposing that the access to lake street be a one way alley with sidewalk.
Due to limited area, we are proposing a 12' drive way and 6' sidewalk.
65. Noted.
66. Noted.
67. Noted. This area has been redesigned.
68. We have provided a large area designated for bike parking on the eastern edge
of the site. Due to site constraints, there is not sufficient area to locate additional
bicycle parking at the west edge of the building.
69. Noted.
Utility Plans:
Refer to engineering documents.
Light & Power:
1. 3 phase power is still planned for this project. It has been coordinated to bring
power in from Lake Street down the 20'-0" easement on the ease side of the
project. We can coordinate additional details at your convienience.
Stonnwater Utility:
Refer to engineering documents
Water Wastewater
42. Noted
41. Utilities are shown on the Landscape Plan.
39. & 40. Refer to engineering documents.
Zoning:
21. Noted and corrected.
22. All parking is located on -site. This was a typographical error.
23. Accessible ramps are shown on the site plan.
24. Noted.
25. Noted.
26. The site plan has been revised since the previous submittal, and the tree
originally planned for the bike parking area has been removed.
27. Noted and corrected, see landscape plan.
Ceastpoint
studio
July 26, 2004
Mr. Ted Shepard
City of Fort Collins
Planning Department
281 North College Ave.
Fort Collins, CO 80521
Re: Frazier Subdivision, 800, 808, & 814 W. Prospect Rd.
Response to staff comments dated 5/24/04
A Design Collaborative
Engineering:
General:
3. We have increased the parking setback. We would like to discuss a variance of
1.83 feet for the parking setback on the west side of the driveway.
4. Refer to engineering documents.
5. The sidewalk adjacent to Prospect has been relocated to the edge of the future
ROW, and is 6' in width, and is shown to tie into the existing walks at either side
of the property.
6. The retaining wall adjacent to prospect is located 2' from the sidewalk.
19. Noted
20. A copy of the existing soils report has been included with this re -submittal.
70. Refer to Engineering Documents
71. Noted.
Grading Plan:
18. Refer to engineering documents.
Plat:
Refer to plat
Site & Landscape Plans:
7. Emergency Access easement is shown on the plans
8. Additional right of way for this project is shown to be 21' on the site plan.
9. The street trees have been relocated to the south edge of the future sidewalk.
Transportation
60. Noted and corrected.
61. Noted and corrected.
62. Noted and corrected.