HomeMy WebLinkAbout800, 808 & 814 W. PROSPECT RD. MIXED-USE (OBSERVATORY PARK) - PDP - 41-02A - CORRESPONDENCE - (37)Number: 88 Created: 8/9/2004 [8/9/04] Provide traffic rated cleanout detail on the detail sheet. Number: 89 Created: 8/9/2004 [8/9/04] Confirm with PFA concerning the 4-inch fire line being adequately sized. Number: 90 Created: 8/9/2004 [8/9/04] Install a 6-inch gate valve on the west side of the existing fire hydrant in order to chlorinate and flush proposed water main. Number: 91 Created: 8/9/2004 [8/9/04] See site, landscape and utility plans for other comments. Comments from Advance Planning: 1. It is not entirely clear the extent of the improvements at the entrance of the building. Please provide more labeling of the plaza, steps, seat walls, door, utility room, ramps, planters and retaining walls. It is not clear if the entrance is sufficiently prominent given the size and scale of the building. Perhaps a detail of this area would be helpful. 2. There is a concern that the entry does not face Prospect, but, rather, the side lot line. This entrance should face the street. Comment from Light and Power: Be sure to clearly label the location of the transformer. Be sure and return all of your redlined plans when you re -submit. If you have.any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sincerely: Ted Shepard Chief Planner Page 5 [8/10/04] The sizing of the detention ponds is correct. A stage - storage table is needed to verify that the grading shown on the plans will provide the volume that is being proposed. Please provide a stage -storage table in the drainage report for the detention pond. Number: 92 Created: 8/10/2004 [8/10/04] Please edit redlined text in the drainage report. Number: 93 Created: 8/10/2004 [8/10/04] After hearing, a more detailed review will take place when 90% plans are submitted. Topic: Erosion/Sediment Control Number: 44 Created: 5/20/2004 [8/10/04] 1. BMP's are not shown on the plan, one or more of the previous comments has not been addressed. Please contact Bob Zakely if you have any questions regarding erosion control. Your report states that "silt fencing will surround areas of the proposed construction", yet the plan indicates silt fencing only along Prospect. What is protecting the properties to either side and the rear? What is the protection during utility line installations on Prospect, the storm sewer, and the sanitary line to Lake? Your schedule indicates the tracking pad to go in a month after construction begins. Isn't this a little late? How is the pond to be utilized as a sediment trap, by overexcavation or outlet protection? Please add details to the plan to explain your intention. The revegetation costs in your cost estimate need to be revised to the current $775/acre for less than 5 acres, $725/acre for more than 5 acres. Topic: Site and Landscape plans Number: 38 Created: 5/18/2004 [8/10/04] Please provide a flared -end section detail and revise water quality outlet details per redlines. Department: Water Wastewater Issue Contact: Jeff Hill Topic: General Number: 86 Created: 8/9/2004 [8/9/04] Provide a minimum of 10 feet of utility easement on both sides of the proposed sanitary sewer service for this project. Provide copies of the required offsite utility easements for our review. Number: 87 Created: 8/9/2004 [8/9/04] Provide profile of the proposed storm sewer with the water service and fire line shown and labeled in the profile. Provide concrete encasement on storm sewer 10 feet on both sides of the water main. Page 4 [8/5/04] The ramp on the west side of the driveway needs to meet the detail below. Please revise. [5/6/04] See detail 707 for the correct construction of the driveway. The driveway radii should be dimensioned and meet LCUASS standards. Number: 94 Created: 8/13/2004 [8/13/04] The variance requests for driveway separation from other driveways and streets, and for using the constrained arterial cross-section on Prospect have been approved.. Variance approvals are for this project only. As with all variances to the street standards, the variances granted for this project are based on the particular situation under design and the judgment that we (the designer and the City) apply to determine whether there is a public safety concern. The variances for this project in no way set any precedence for relaxing these standards on other projects without complete analysis and justification. Please list approved variances in the general notes. Department: PFA Issue Contact: Ron Gonzales Topic: General Number: 85 Created: 8/9/2004 [8/9/04] The fire lane is required to be a minimum 20' wide all-weather road. PFA will not drive on any sidewalks, and this proposed lane is expected to be obstructed while trash trucks are staged picking trash containers due to the proximity of the trash enclosures. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 32 Created: 5/18/2004 [8110/04] The Variance request has been received and reviewed. The statement in the Criteria Manual referring to 18-inches with a variance is for commercial uses where no overnight parking would occur. In this case, overnight parking would occur. In order to give approval for this variance request, the parking stalls that are exceeding 12-inches of detention depth will need to be signed stating that this area is a flooding zone up to 1.3 feet in depth. The maximum allowable depth for detention in a parking lot is 12-inches, which is being exceeded. Please revise. Number: 33 Created: 5/18/2004 [8/10/04] The F.F. floor elevation is lower than the MOE. Please clarify. The F.F. elevation for the building needs to be 1 foot above the 100-year WSEL of the detention pond. Please revise. Number: 35 Created: 5/18/2004 [8/10/04] The TOW elevation is constant, but please provide BOW elevations periodically along the wall. Please provide TOW and BOW elevations for all retaining walls periodically along the length. Number: 37 Created: 5/18/2004 Page 3 Number: 73 Created: 8/5/2004 [8/5/04] The 20' wide utility and emergency access easement should also be labeled as a public access easement (which is different than an emergency access easement). Number: 74 Created: 8/5/2004 [8/5/04] Please label the property to the east of the access easement and provide the owner's name if it is unplatted property. Number: 75 Created: 8/5/2004 [8/5/04] Please show the Lake Street ROW and label how wide the existing ROW is. If the existing ROW is less than 76', then dedicate additional ROW to standards. Number: 76 Created: 8/5/2004 [8/5/04] The emergency access easement near the building should be 30' wide to match the fire lane width. Topic: Site and Landscape plans Number: 7 Created: 5/6/2004 [8/5/04] Please match the emergency access easement shown on the plat/utility plans/site and landscape plans. [5/6/04] Show the emergency access easement. Number: 80 Created: 8/5/2004 [8/5/04] Please show the existing curb and gutter location. Topic: Transportation Number: 63 Created: 5/21 /2004 [8/5/04] Revised comment (David Averill, Transportation Planning): If the proposed drive out to Lake Street is to have bollards on both ends and is to be restricted to emergency use only, then the paved section of that drive (minimum 8' wide) could double as the required ped/bike path out to Lake Street. [5/21/04] Comment From Tom Reiff: [5/19/04] According to the applicant's planning objectives, the path out to Lake Street will serve as a connection for bikes and pedestrians from the proposed development to CSU. To safely accommodate both bikes and peds and to meet the City's design standards the path needs to be a minimum 8 feet in width (LUC 3.6.3 & 3.2.2). Number: 66 Created: 5121 /2004 [8/5/04] See comment #63. [5/21/04] Comment from Tom Reiff:[5/19/04] The submitted TIS is incorrect in stating that there are no bicycle destinations within a quarter mile. According to the City's Level of Service (LOS) Manual, public schools are considered a destination which includes CSU. Since there are no on -street bike lanes connected to this site to satisfy the LOS, it would be acceptable to allow the proposed path connection to Lake Street and its bike lanes to satisfy the bike LOS to CSU. However, it must be designed to City standards so it can safely accommodate both bikes and pedestrians. Topic: Utility plans Number: 16 Created: 5/6/2004 Page 2 6aoffuMbOA STAFF PROJECT REVIEW City of Fort Collins EASTPOINT STUDIO Date: 08/16/2004 DON BROOKSHIRE 3207 KITfERY CT. FT. COLLINS, CO 80526 Staff has reviewed your submittal for 800, 808 AND 814 W. PROPSECT ROAD EXPANDED CONDOMINIUM PROJECT PDP, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Katie Moore Topic: General Number: 19 Created: 5/6/2004 [8/5/04] Repeat FYI. [5/6/04] Please see redlines and utility plan checklist for further comments. Number: 77 Created: 8/5/2004 [8/5/04] Please reivew LCUASS Appendix E for scanning requirements for all plans. Number: 78 Created: 8/5/2004 [8/5/04] Please clearly identify ROW being dedicated by this project on the Site plan, and utility plans. Number: 79 Created: 8/5/2004 [8/5/04] There is a section of the parking lot (northwest) where the drive aisle behind the parking stalls is 20.5' when the minimum width in that location should be 24'. Please revise. Number: 81 Created: 8/5/2004 [8/5104] How will the one-way drive be enforced? Please show needed signing and striping. Please clearly label it as a private drive. Number: 82 Created: 8/5/2004 [8/5/04] Additional offsite easements are needed for the one-way drive and dumpsters shown. Please provide a letter of intent from the affected property owner prior to hearing, and copies of the completed easement(s) prior to submittal of mylars. Number: 83 Created: 8/5/2004 [8/5/04] Please construct a standard driveway on Lake for the private drive. Number: 84 Created: 8/5/2004 [815/04) Please show grading data for the private drive to Lake Street. It appears from the bit that is shown, that water will be draining north to Lake Street: Water from this drive is not allowed to drain over the sidewalk on Lake, and must be diverted to an under -walk drain. Topic: Plat Number: 10 [8/5/04] Please correct a few remaining typos. [5/6/04] Please correct the plat language (as redlined) Created: 5/6/2004 And please correct the vicinity map. Page ]