4. Please see redline comments on the architectural elevations.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Enc.
Page 5
Department: Transportation Planning Issue Contact: David Averill
Topic: Drainage
Number: 165 Created: 2/28/2005
[2/22/05] How does the applicant propose to meet Bicycle/Pedestrian LOS standards with
this new access design off of Lake St? It would appear that the favorable finding in the TIS
(which states the LOS for both modes to be "B" or better for the CSU destination area)
needs to be revisited with this change.
[2/28/05] Follow up comment: a project came into Conceptual Review this morning for the
parcel immediately east of this project. It is suggested that this applicant explore solving the
bike/ped/vehicular access puzzle for this site with the parties to the east.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 86 Created: 8/9/2004
[2/25/05]
[8/9/04] Provide a minimum of 10 feet of utility easement on both sides of the proposed
sanitary sewer service for this project. Provide copies of the required offsite utility
easements for our review.
Number: 89 Created: 8/9/2004
[2/25/05]
[8/9/04] Confirm with PFA concerning the 4-inch fire line being adequately sized.
Number: 91 Created: 8/9/2004
[2/25/05] Provide separate water and sewer services for each use proposed within the
building (i.e. commercail and residential).
Maintain the required landscape/utility separation distances on the landscape plans.
[8/9104] See site, landscape and utility plans for other comments.
Department: Zoning Issue Contact: Jenny Nuckols
Topic: Zoning
Number: 27 Created: 5/11 /2004
[2/8/05] See land use code section 3.2.1(E)($)(b)
[5/11/04] Landscaping is only being shown around a portion of the parking lot perimeter,
please not the rest and call out the plants and counts..
Comments From Current Planning
1. Staff is concerned about the entrance and compliance with Section 4.24(D)(1)(a). This
standard calls for doorways to face the street at grade level or slightly elevated. In order to
mitigate the fact the entrance is below grade, please explore design treatments that would
make this entrance more prominent and visible to Prospect Road.
2. See redline Preliminary Site Plan regarding adding more explanatory notes describing
the size and location of the resident common area and the mixed -use area.
3. Is the emergency access through Hi -Lan Apartments restricted to emergency access
only? Please explain on the plans how the bicycles and pedestrians are allowed access but
cars are restricted. Will there be a gate, bollards or chain? If cars are not restricted, then it
would be helpful to see the diagram of the Hi -Lan parking lot.
Page 4
[2121/05] Please provide letters of intent from the adjacent property owner for the proposed
offsite utility and emergency access easements (and any other easements needed) prior to
scheduling a public hearing.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 35 Created: 5/18/2004
[2/23/05]
[8/10/04] The TOW elevation is constant, but please provide BOW elevations periodically
along the wall.
Please provide TOW and BOW elevations for all retaining walls periodically along the
length.
Number: 37 Created: 5/18/2004
[2/23/05] Need this before a hearing.
[8/10/04] The sizing of the detention ponds is correct. A stage - storage table is needed to
verify that the grading shown on the plans will provide the volume that is being proposed.
Please provide a stage -storage table in the drainage report for the detention pond
Number: 93 Created: 8/10/2004
[2/23/05)
[8/10/04] After hearing, a more detailed review will take place when 90% plans are
submitted.
Number: 134 Created: 2/23/2005
[2/23/05] The 8-inch outlet pipe is smaller than the minimum of 15-inches allowed.
Clogging of this small pipe is likely over a short amount of time. A discussion needs to take
place of all alternatives between the City and engineer.
Number: 135 Created: 2/23/2005
[2/23/05] The water quality ponds should not have micro pools and be designed to be dry
extended detention. Mosquitoes and the wet mess will be a complaint to the City waiting to
happen.
Number: 136 Created: 2/23/2005
[2/23/05] Please provide more spot elevations along the north property line to show grading
and proper freeboard required for the detention pond.
Number: 156 Created: 2/25/2005
[2/25/05] A drainage easement dedicated to the City is required for the pond's outfall pipe to
the north.
Topic: Erosion/Sediment Control
Number: 133 Created: 2/23/2005
[2/23/05] Plan is OK.
Page 3
[2/21/05] The easements are shown differently on the plat and site plan and utility plans
still. The EAE is required to be 30' wide for servicing buildings that are 3 or more stories tall.
The drive aisle provided on the north side of the building is 30' wide, but the easement within
it is only 20'. Please check with PFA to ensure that the drive aisle along the west side of the
building doesn't need to be 30' wide as well. The new offsite EAE needs to meet the
minimum radius requirements on the curves (25' interior, 50' exterior) unless specific
approval is gotten from PFA for the smaller curves.
[8/5/04] Please match the emergency access easement shown on the plat/utility plans/site
and landscape plans.
[5/6/04] Show the emergency access easement.
Number: 80 Created: 8/5/2004
[2/21/05]
[8/5/04] Please show the existing curb and gutter location.
Topic: Transportation
Number: 63 Created: 5/21 /2004
[2/21/05] How will this project meet its bike and ped LOS standards now that the bike/ped
path to Lake Street is gone?
[8/5/04] Revised comment (David Averill, Transportation Planning): If the proposed drive
out to Lake Street is to have bollards on both ends and is to be restricted to emergency use
only, then the paved section of that drive (minimum 8' wide) could double as the required
ped/bike path out to Lake Street.
[5/21/04] Comment From Tom Reiff: [5/19/04] According to the applicant's planning
objectives, the path out to Lake Street will serve as a connection for bikes and pedestrians
from the proposed development to CSU. To safely accommodate both bikes and peds and
to meet the City's design standards the path needs to be a minimum 8 feet in width (LUC
3.6.3 & 3.2.2).
Number: 66 Created: 5/21 /2004
[2/21/05]
[8/5/04] See comment #63.
[5/21/04] Comment from Tom Reiff:[5/19/04] The submitted TIS is incorrect in stating that
there are no bicycle destinations within a quarter mile. According to the City's Level of
Service (LOS) Manual, public schools are considered a destination which includes CSU.
Since there are no on -street bike lanes connected to this site to satisfy the LOS, it would be
acceptable to allow the proposed path connection to Lake Street and its bike lanes to satisfy
the bike LOS to CSU. However, it must be designed to City standards so it can safely
accommodate both bikes and pedestrians.
Topic: Utility plans
Number: 16 Created: 5/6/2004
[2/21/05] The ramp still does not meet the detail. Please revise and show spot elevations to
ensure that ADA requirements are being met. Also, Truncated Domes need to be added to
these ramps to meet current ADA standards.
[8/5/04] The ramp on the west side of the driveway needs to meet the detail below. Please
revise.
[5/6/04] See detail 707 for the correct construction of the driveway. The driveway radii
should be dimensioned and meet LCUASS standards.
Number: 95
Created: 2/21 /2005
Page 2
STAFF PROJECT REVIEW
Cityof Fort Co]lins
EASTPOINT STUDIO Date: 03/02/2005
DON BROOKSHIRE
3207 KITTERY CT.
FT. COLLINS, CO 80526
Staff has reviewed your submittal for 800, 808 AND 814 W. PROPSECT ROAD EXPANDED
CONDOMINIUM PROJECT PDP, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Katie Moore
Topic: Drainage
Number: 97 Created: 2/21 /2005
(2/21/05] When repaving/regrading the offsite parking lots, the drainage must be diverted
from flowing over the public walk. Please re -grade to drain to an under -walk drain.
Topic: General
Number: 19 Created: 5/6/2004
[2/21 /05]
[8/5/04] Repeat FYI.
[5/6/04] Please see redlines and utility plan checklist for further comments.
Number: 77 Created: 8/5/2004
(2/21 /05]
[8/5/04] Please reivew LCUASS Appendix E for scanning requirements for all plans.
Number: 78 Created: 8/5/2004
[2/21 /05]
[8/5/04] Please clearly identify ROW being dedicated by this project on the Site plan, and
utility plans.
Number: 96 Created: 2/21 /2005
[2/21 /05] Please show the parking configuration of the parking lot offsite to the north to
show that parking stall and drive aisle standards will be met.
Topic: Plat
Number: 10 Created: 5/6/2004
[2/21 /05]
[8/5/04] Please correct a few remaining typos.
[5/6/04] Please correct the plat language (as redlined). And please correct the vicinity map.
Number: 76 Created: 8/5/2004
[2/21/051 See comment #7.
[8/5/04] The emergency access easement near the building should be 30' wide to match the
fire lane width.
Topic: Site and Landscape plans
Number: 7
Created: 5/6/2004
Page 1