HomeMy WebLinkAboutMAX FLATS - PDP - PDP120034 - CORRESPONDENCE -Comment Number: 6
Comment Originated: 12/20/2012
12/20/2012: LUC 3.2.2(J) Parking stalls along an arterial are required to be setback 15' for the
ROW. The first stall along the south property is proposed to be setback only 8ft, this will need
to be corrected.
Comment Number: 7
Comment Originated: 12/20/2012
12/20/2012: LUC 3.2.1(E) Parking lot screening requires trees every 40ft along the perimeter
landscaping that is along a side lot line. The West and South side lot line is not meeting this
standard.
Comment Number: 8
Comment Originated: 12/20/2012
12/20/2012: A note on the plans indicated 6% of parking lot interior landscaping being
proposed is 527 sq ft, however the plans are only showing approx 300 sq ft of interior
landscaping. Both are less then the required 6%, this will neet to be corrected.
Comment Number: 9 Comment Originated: 12/20/2012
12/20/2012: The note on the elevations, stating the balconies are optional, needs to be
removed. If the applicant does not want to include balconies at a later date this will need to be
processed by Minor Amendment.
Comment Number: 10 Comment Originated: 12/20/2012
12/20/2012: 3.5.1(1) The elevations did not include the mechanical/utility equipment (vents,
flues, conduit, meters, HVAC, RTU etc...) locations. This needs to be include with notes.on
how such equipment is screened/painted.
Comment Number: 11 Comment Originated: 12/20/2012
12/20/2012: Signs and Locations are not approved through PDP/FP process. Please add a
note to sheets that show signs, that signs shown on plans are for reference and will be
permitted through a separate sign permit.
Contact: Roger Buffington, 970-221-6854, rbuffington(a).fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 12/28/2012
12/28/2012: Provide water service sizing calculations for the residential portion of the building.
A 2" service is typically not adequate for 64 units. It's important to determine this now as the
vault required for a 3" meter may impact the site plan. Water pressure in this area is
approximately 85 psi.
Comment Number: 2 Comment Originated: 12/28/2012
12/28/2012: Provide water service sizing calculations for the residential portion of the building.
A 2" service is typically not adequate for 64 units. It's important to determine this now as the
vault required for a 3" meter may impact the site plan. Water pressure in this area is
approximately 85 psi.
Comment Number: 3 Comment Originated: 12/28/2012
12/28/2012: Add note to coordinate abandonment of the 6" sewer in Mason and the 3/4" water
service in Mulberry with Water Utilities crews (221-6700).
Comment Number: 3 Comment Originated: 12/28/2012
12/28/2012: Add note to coordinate abandonment of the 6" sewer in Mason and the 3/4" water'
service in Mulberry with Water Utilities crews (221-6700).
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbealsofcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/20/2012
12/20/2012: Land Use Code (LUC) 3.2.2(C)(4) Required bicycle parking spaces shall not be
located in the ROW with a revocable permit this type of permit does not ensure that standards
will be met into the future.
Comment Number: 2 Comment Originated: 12/20/2012
12/20/2012: LUC 3.2.2(L)(2) Compact vehicle spaces are only allowed in long term parking
areas. Even though no parking is required for the project when any parking is provided only
40% of the long term parking is allowed to be compact. If applicant is seeking to go over the
40% this section of the code requires a modification. Also the compact stalls shall be
designated with a sign that such spaces are reserved for employees and residents. Please
provide a detail of the sign and locations.
Comment Number: 3
Comment Originated: 12/20/2012
12/20/2012: LUC 3.2.4 The lighting plan should include the foot-candles for the entire parking
area including that underneath the building. Also did not see on the lighting plan the average
foot candle for the parking area on the site.
Comment Number: 4 Comment Originated: 12/20/2012
12/20/2012: Please indicate the specie of the existing trees that are being protected.
Comment Number: 5
Comment Originated: 12/20/2012
12/20/2012: LUC 3.2.2(M) If there is not a curb along the parking stalls that are along the West
and South property lines then each of these stalls do require a wheel stop.
Topic: General
Comment Number: 4
Comment Originated: 12/23/2012
12/23/2012: In light of the new BNSF barrier curb on Mason handling emergency calls may
become a problem for traffic flow on Mason. The City recognizes that in the case of property
fires, fire trucks and support vehicles have unobstructed access to any roadways and travel
lanes necessary. Non -fire emergency's though and the vehicles that may accompany them in
non -life threatening circumstances are an aspect that should be discussed and plans
determined for handling such emergencies that don't necessary require blocking Mason.
Ambulance and Paramedic vehicles can probably park in the parking and bike lanes well
enough not to block Mason traffic, but many times non -fire dispatches are accompanied by
larger fire vehicles. The possible greater frequency of those types of non -life threatening
dispatches do raise concern for blockage of Mason. Traffic Op's would like to see the
developement conduct discussions with Poudre Fire Authority on possible plans of how the
non -fire emergencies might be handled to minimize blockage of Mason. This will not be an
issue for just this development but along much of the new Mason corridor and the discussions
will need to take place for all new developments along the corridor until more definitive
processes can be determined and implemented.
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 12/23/2012
12/23/2012: Please add the following to the Landscape Notes: "All landscape plantings
installed within the public street right-of-way shall conform to the current Sight Distance and
intersection Sight Triangle standards in Chapters 7 through 9 of the Larimer County Urban Area
Street Standards. Tree canopies should not obstruct visibility of traffic related Regulatory
signage."
Topic: Traffic Impact Study
Comment Number: 3 Comment Originated: 12/23/2012
12/23/2012: The City recognizes the difficulty in deriving north and south bound traffic volumes
on the recently converted to 2-way traffic Mason Street and that traffic has not fully returned due
to the on -going roadway construction. The TIS states the 2% adjustment as still being too small
of an adjustment and the City agrees after reviewing the past and present counts. Please
provide discussion of method and factors used in determining the provided Recent Adjusted
Peak Hour Turning Movements (Fig. 3, page 4).
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington()fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 12/28/2012
12/28/2012: Show/label the curb stops on the existing water services that will be utilized for the
proposed development.
Comment Number: 1 Comment Originated: 12/28/2012
12/28/2012: Show/label the curb stops on the existing water services that will be utilized for the
proposed development.
Department: Water -Wastewater Engineering
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 01/02/2013
01/02/2013: Please describe a line & add a bearing for the Basis Of Bearings on sheet C000.
Comment Number: 6 Comment Originated: 01/02/2013
01/02/2013: There are line over text issues on sheet C300.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 01/02/2013
01/02/2013: There are line over text issues on sheet PDP 6.
Topic: Plat
Comment Number: 7 Comment Originated: 01/02/2013
01/02/2013: Please label the properties to the north & east with the subdivision name, lot,
block, etc.
Comment Number: 8 Comment Originated: 01/02/2013
01/02/2013: Please show found or set monument for the northwest block corner with a bearing
& distance to the boundary.
Comment Number: 9 Comment Originated: 01/02/2013
01/02/2013: Please show record bearings & distances for all boundary lines.
Comment Number: 10 Comment Originated: 01/02/2013
01/02/2013: Please note that the vacated alley is reserved as a 20' utility easement, per
Ordinance 36, 1979 at Book 1943 Page 447.
Comment Number: 11 Comment Originated: 01/02/2013
01/02/2013: The last digit of the LS number is missing at the southwest boundary corner.
Comment Number: 12 Comment Originated: 01/02/2013
01/02/2013: Please include a note about the alley vacation.
Comment Number: 13 Comment Originated: 01/02/2013
01/02/2013: Please include a note addressing (what we see as) an apparent error in Harrison's
Addition. According to the Harrison's Addition plat, block 105 has an east line of 380' and a
west line of 400'. The original Town of Fort Collins plat shows the block as 400' square.
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/02/2013
01/02/2013: Please label the major streets on the vicinity map on sheet PDP 1.
Comment Number: 2 Comment Originated: 01/02/2013
01/02/2013: There are line over text issues on sheet PDP 3.
Department: Traffic Operation
Contact: Ward Stanford, 970.221.6820, wstanford()fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 12/23/2012
12/23/2012: Please include on Sheet 300, Overall Utlity Plan, the west BNSF barrier curb on
Mason along the frontage of your development with curb face to curb face dimensions.
Sprinkler protection shall be provided for exterior balconies, decks, and ground floor patios of
dwelling units where the building is of Type V construction.
2006 International Fire Code 903.3.1.2.1
Comment Number: 04 Comment Originated: 01/02/2013
01/02/2013: Proposed emergency assess parking on Mason Street and how it is to integrate
with the Max transit stop is still under review by the city. Emergency access parking shall be
marked as required by IFC 503.3.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218.2932, jschIam(@fcqov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/27/2012
12/27/2012: The site disturbs more than 10,000 sq-ft therefore Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria Under the Amendments of Volume 3 Chapter 7 Section 1.3.3. If you
need clarification concerning this section, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Mark Taylor, mtaylor(a)fcgov.com
Topic: Floodplain
Comment Number: 4 Comment Originated: 01/04/2013
01/04/2013: Please address the red -lined comments on the Plat, the Site Plan, the
Construction Drawings and the Drainage Letter.
Comment Number: 5 Comment Originated: 01/04/2013
01/04/2013: Please refer to the 100% Development Review Checklist included with the
red -lined comments.
Contact: Wes Lamarque, 970.416.2418, wlamargue(a)fcgov.com
Topic: Floodplain
Comment Number: 6 Comment Originated: 01/07/2013
01/07/2013: In the plan set, document that the elevator design meets the guidelines in FEMA
Technical Bulletin 4, showing what type of elevator is being proposed (hydraulic, lift), how the
shaft/enclosure and equipment are being protected from water, etc.
Topic: General
Comment Number: 2 Comment Originated: 12/27/2012
12/27/2012: Stormwater is ready for a hearing except for the floodplain department. They will
be reviewing the plans soon and will advise if the PDP is ready for a hearing.
Department: Technical Services
Contact: Jeff County, 970-221.6588,
Topic: Building Elevations
Comment Number: 3
01/02/2013: No comments.
8county(&fcgov.com
Comment Originated: 01/02/2013
2009 International Fuel Gas Code (IFGC)
2009 International Plumbing Code (IPC) as amended by the State of Colorado
2011 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2003.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chap 4.
2. Multi -family and Condominiums 3 stories max: 2009 IECC Chapter 4.
3. Commercial and Multi -family 4 stories and taller: 2009 IECC Chapter 5.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these
requirements can be obtained at the Building Office or contact the above phone number.
MAX Flats — project specific concerns:
1. Building code requires a 1-hour building if constructed with wood.
2. Fire -sprinkler required.
3. Bedroom egress windows required below 4th floor regardless of fire -sprinkler.
4. IBC chap 11 and State statute CRS 9-5 requires project provide accessible units per that
code.
5. New Green Code requires:
a. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min. if building
located within 1000ft to train tracks.
b. Upgraded insulation is required for buildings using electric heat or cooling.
c. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required.
d. Special combustion safety requirements for natural draft gas appliances.
e. Low VOC interior finishes. '
f. See Green Code compliance guide for additional requirmements.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a)poudre-fire.org
Topic: General
Comment Number: 01 Comment Originated: 01/01/2013
01/01/2013: All previous comments pertaining to this project have been appropriately
addressed.
Comment Number: 02
01/01/2013: HYDRANT & FDC
Comment Originated: 01/01/2013
Proposed locations for the fire department connection and new hydrant are not identified on the
plans.
Comment Number: 03
01/01/2013: BALCONIES AND DECKS
Comment Originated: 01/01/2013
Comment Number: 9
Comment Originated: 01/03/2013
01 /03/2013:
On the Overall Utility Plan sheet C300 the two significant and mature City street trees located in
the parkway along Mulberry have various notes about the water line, the sewer line and
proposed fire service line within their root zone area. These trees are prominent and mature.
The East tree is a rare specimen of Horse Chestnut. Forestry has the following questions
related to proposed utility work around these trees.
Will any of these lines involve new work in the root system of these trees? If so please explain
what that work is and schedule an on -site meeting with the City Forester to review tree impact
from any proposed utility work. The proposed fire service line appears to be quite close to the
trees. Can this line be moved to a different location?
If proposed utility work will be near to the existing trees and could cause root damage then
review the tree protection specification for boring under root systems in LUC 3.2.1 G 7 for
inclusion on the plans of this project. It's very important to provide adequate protection for
these City of Fort Collins street trees through the construction process.
Department: Light And Power
Contact: Doug Martine, 970-224.6152, dmartine(o)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/18/2012
12/18/2012: The location shown for the electric transformer on the utility and landscape plans
does not place it within the required 10 feet of an area accessible to a utility line truck.
Department: Outside Agencies
Contact: Seth Lorson, 970.224-6189, siorson(a)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 01/04/2013
01/04/2013: Building Department: Russ Hovland, 970-416-2341, rhovland@fcgov.com
Building Permit Pre -Submittal Meeting
Pre -Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi -family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early
to mid -design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting. Applicants of new commercial or multi -family projects are
advised to call 416-2341 to schedule a pre -submittal meeting. Applicants should be prepared
to present site plans, floor plans, and elevations and be able to discuss code issues of
occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended:
2009 International Building Code (IBC)
2009 International Residential Code (IRC)
2009 International Energy Conservation Code (IECC)
2009 International Mechanical Code (IMC)
Comment Number: 1
12/20/2012: No comments.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361,
Topic: Landscape Plans
Comment Number: 1
01/02/2013:
tbuchanan()fcgov.com
Comment Originated: 12/20/2012
Comment Originated: 01/02/2013
Existing significant trees to be removed should be marked as to species, diameter, condition
and number of mitigation trees.
Comment Number: 2 Comment Originated: 01/02/2013
01/02/2013:
The Sterling Silver Linden is not on the street tree list. Please select another species from the
City Street tree list. Consider the use of Redmond Linden as a substitution.
Comment Number: 3 Comment Originated: 01/02/2013
01/02/2013:
The City Forester recommends the use of Chanticleer Pear in place of Autumn Blaze Pear for
better disease resistance and a more upright growth form.
Comment Number: 4
01/02/2013:
Comment Originated: 01/02/2013
For the north most street tree to be protected in the parkway along Mason evaluate if the lawn
area can be extended a little further to the north of this tree to keep the new sidewalk further to
the north of the trunk of this mature flowering crabapple tree.
Comment Number: 5
01/02/2013:
Comment Originated: 01/02/2013
For Parking lot perimeter landscape areas on the south and west perimeters provide trees at
an average spacing of 40 feet. Trees can be spaced informally or in uniform spacing (LUC 3.2.1
E 4 a). Evaluate is some deciduous trees may also be used in these areas.
Comment Number: 6 Comment Originated: 01/02/2013
01/02/2013:
Evaluate if it is possible to add an additional street tree between the sidewalk and curb along
Mulberry approximately 25 feet east of the existing mature tree. Evaluate the 6 foot sewer/water
service line separtion standard and visibility of the intersection.
Comment Number: 7 Comment Originated: 01/02/2013
01/02/2013:
Please consider changing the flowering pear in the planting bed just to the north of the plaza
along Mulberry to a canopy shade tree since having a street tree between the sidealk and curb
is not feasible at this location. A narrow crown form of Linden might be a possible tree to
consider.
Comment Number: 8
01/02/2013:
Comment Originated: 01/02/2013
Please add a sentence in Landscape note 8. "Do not cultivate soil within the drip line of
existing trees to retain".
It appears that it is greater than 750 square feet of drainage. Please revise or provide
additional information to show that'it is less than 750 square feet of drainage.
Comment Number: 15 Comment Originated: 01/02/2013
01/02/2013: Sheet C600 -Note 6 may apply to the bicycle storage along Mulberry Street and
the vertical curb construction to abandon the driveway along Mulberry Street. Please check
with Floodplain and Stormwater.
Topic: Offsite Work
Comment Number: 1
Comment Originated: 01/02/2013
01/02/2013: Erika Keeton with MAX/BRT Project has requested that construction be
coordinated with the MAX/BRT project and bus station. The MAX bus station is slightly
elevated with a 14" curb along Mason, this needs to be accounted for in how it interfaces with
the proposed building and sidewalk along Mason. Additional items to discuss during
coordination meeting is building construction cannot effect operation of bus station, proximity of
building foundation and construction to bus station.
Topic: Plat
Comment Number: 2
Comment Originated: 01/02/2013
01/02/2013: Is the easement shown on the Plat for Utilities an existing or proposed utility
easement?
Topic: Site Plan
Comment Number: 3
Comment Originated: 01/02/2013
01/02/2013: The site plan shows a "Future R.O.W. Line". This needs to be changed to
proposed r.o.w. line since additional right of way is being proposed with this project and this
will become the new property line.
Comment Number: 4
Comment Originated: 01/02/2013
01/02/2013: The site plan shows Emergency Services Access and Loading Zone shown along
Mason Street. How will these be striped, signed, curbs painted or designated? Additional
information should be added to the Civil Plans and site plan. The station will need to have red
curb striped on the curb to allow buses to pull out. The Emergency access lane will need to
have red curb painted on the curb and should be called out on the plans. The area between
the red curbs can be reserved for a "loading zone" but will need to be signed as no parking as
this can still be used for temporary loading and unloading.
Topic: Variance Request
Comment Number: 16
Comment Originated: 01/02/2013
01/02/2013: Engineering has reviewed the variance request to modify the requirement from
LCUASS 19.3.1 from 75' to 24'. The variance request as proposed has been denied by
Engineering. Transportation staff have discussed the request and are recommending the
parking setback be 34' offset from the Mason flowline. Please revise the variance request and
resubmit.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143,
Topic: General
lex(aD-fcgov.com
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich(a)fcgov.com
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 01/02/2013
01/02/2013: Sheet C200 -The sidewalk on this sheet is only scaling to be 6' wide and the
hatching doesn't appear to show the full 8' width as intended.
Comment Number: 6 Comment Originated: 01/02/2013
01/02/2013: Sheet C200 - Label bike parking that is shown in the right of way. Bike parking in
the Right of Way will need to comply with City of Fort Collins Standards and will be subject to
removal and replacement at City's discretion. Conversations should be had between applicant
and planning to discuss if moving bicycle parking out of Right of Way will affect the validity of
the site plan.
Comment Number: 7 Comment Originated: 01/02/2013
01/02/2013: Sheet C200 - Sidewalk in the right of way is being labeled as "concrete flatwork"
and "light duty paving" on this sheet. All sidewalk within the right of way will need to conform to
City of Fort Collins sidewalk standards.
Comment Number: 8
Comment Originated: 01/02/2013
01/02/2013: Sheet C300 -The building appears to be overhanging into the utility easement at
the southwest comer and west edge. Please revise the easement accordingly.
Comment Number: 9 Comment Originated: 01/02/2013
01/02/2013: Sheet C300 -The balconies shown along Mason Street appear to be overhanging
into the Right of Way on this sheet. Any balconies that are proposed to overhang into Right of
Way will need to be approved by a separate revocable right of way permit and should be
called out on the plans as such.
Comment Number: 10
Comment Originated: 01/02/2013
01/02/2013: Sheet C300 -There is some concern about the constructability and desire to have
the proposed storm sewer line underneath the MAX Bus Station as shown on the Utility Plan.
Storm sewer outfall from project site needs to be routed in a different location than underneath
the MAX/BRT bus station. Consider angling it to the northeast and running underneath corner
patio and out to existing inlet.
Comment Number: 11
Comment Originated: 01/02/2013
01/02/2013: Sheet C300 -This sheet is showing the tables and concrete squares in the right of
way at the North Side of the building. These can not be shown in the right of way on these
plans or the site plan. Please remove them from the plans. A separate rright of way
encroachment permit is required for review in order to place these in the right of way.
Comment Number: 12 Comment Originated: 01/02/2013
01/02/2013: Sheet C301 -Please add street cut limits note to this sheet.
Comment Number: 13 Comment Originated: 01/02/2013
01/02/2013: Sheet C400 -This sheet may need to include additional information on emergency
access fire lane and loading zone along Mason Street along with appropriate signage and
striping.
Comment Number: 14
Comment Originated: 01/02/2013
01/02/2013: Sheet C400 -How much drainage is leaving the site through the private driveway?
Comment Number: 3
Comment Originated: 12/28/2012
12/28/2012: Buildings over 40' are required to have an additional height review. Please.
provide a shadow analysis (Winter Solstice and 1.5 months before and after) and a view
analysis per 3.5.1(G).
Comment Number: 4 Comment Originated: 12/28/2012
12/28/2012: Please provide a further explanation of proposed material with a material board.
Again, staff recommends more traditional high quality material such as brick and stone for the
base element.
Comment Number: 5 Comment Originated: 12/28/2012
12/28/2012: The color elevations may be misleading but the colors do not appear to be
consistent with the colors that exist in the neighborhood (3.5.1(F).
Comment Number: 6 Comment Originated: 01/04/2013
01/04/2013: The faux window and door elements made of metal screen panel on the base
level are insufficient to meet the standards found in 3.5.3(D). Please utilize architectural features
such as "columns, ribs or pilasters, piers, fenestration patterns," seat walls, and planter boxes.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 12/28/2012
12/28/2012: Parking along the north property line should provide additional landscaping to the
equivilent that the parking spaces encroach on the 5 foot setback.
Topic: Lighting Plan
Comment Number: 1 Comment Originated: 12/28/2012
12/28/2012: 1 cannot read the specs from the fixture cut sheets to confirm compliance with LUC
3.2.4. Please provide readable cut sheets.
Comment Number: 2 Comment Originated: 12/28/2012
12/28/2012: Please provide an average foot candle level for the site.
Topic: Site Plan
Comment Number: 1 Comment Originated: 12/28/2012
01/04/2013: The parking space closest to Mason Street will have to be removed per
Engineering and the electric transformer will have to be moved per Light and Power, which
provides the opportunity to move the bicycle parking onto the site. Please revise.
12/28/2012: Bicycle parking required for this project is 60 enclosed spaces that are proposed
to be provided within the units. Please provide floor plans that show how and where they will
exist. 42 fixed bicycle parking spaces are required and only 40 are provided. We may need to
work something out regarding the bike parking in the ROW. [Calculations: Req. 1 sp / bedroom
=100 spaces at 40% fixed and 60% enclosed + 1 space per 1,000 s.f. of restaurant (1,500 s.f.)
=1.5 spaces]
Comment Number: 2 Comment Originated: 01/04/2013
01/30/2013: A modification of standard is required. Although there is no minimum parking
requirement, proposed parking must meet the standards set forth for parking.
01/04/2013: Staff will be discussing the provision requiring a maximum of 40% compact
parking stalls in the TOD which does not have a minimum parking requirement at Planning
Coordination on Tuesday, Jan. 8. More information following.
City ofr`
�a
ort Co ins:
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/de velopmentre vie w
January 30, 2013
Dave Derbes
Brinkman Development, LLC
3003 E. Harmony Rd., Ste. 300
Fort Collins, CO 80528
RE: Max Flats, PDP120034, Round Number 1 (1/30/13 Revised)
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or
slorson@fcgov.com.
Comment Summary.
Department: Current Planning
Contact: Seth Lorson, 970-224-6189, slorson fcgov.com
Topic: Building Elevations
Comment Number: 1
Comment Originated: 12/28/2012
01/04/2013: Staff is looking forward to meeting with the applicant to ensure compliance with the
standards pertaining to the architectural elevations. .
12/28/2012: The ground level is required to provide a clear base element (3.5.3(D)6), 50% of
which is required to be "retail and other uses" (3.10.4(D). A request for a modification of
standards is required if the standards cannot be met. Staff recommends higher quality material
such as brick or stone with pilasters to provide a pedestrian scale base element.
Comment Number: 2
Comment Originated: 12/28/2012
12/28/2012: The building does not appear to be providing adequate articulation (3.5.3 (C & D),
please provide a plan view or section of the building that illustrates the proposed articulation.
Staff recommends that the building be broken up with more horizontal articulation and less
repetition, it is almost a mirror image when cut down the center of the east elevation. Also, the
balconies contribute to the building's articulation, visual interest, activity and reduction of mass;
the elevations will not be approved with the note suggesting that the balconies are optional. In
fact, staff recommends expanding the size of the balconies to meet the building articulation
requirement.