HomeMy WebLinkAboutARCADIA AT WILLOX LANE - PDP - 5-05A - CORRESPONDENCE - (5)Number: 77
Response: Irrigation line is still being coordinated with the parks department
Number: 64
Response: Trees adjusted
Number: 36
Response: Basin 101 was re-routed into storm system and into detention pond
Number: 31
Response: Easement dedicated to the City
Number: 32
Response: Letter has been sent to Dan DeLaughter before the project went to hearing
documenting the R&R being ok with the water and electric line crossings.
1Q",, .TOW,I
Response: Irrigation line still being worked out with the parks department
Number: 66
Response: Water line adjusted to be ductile iron with polywrap. Crossings show on
profiles.
Response: Noted
Number: 7
Response: Layout shown on utility plans
Number: 8
Response: Noted
Number: 47
Response: Placement shown
Number: 46
Response: Utility services shown
Number: 39
Response: Hydrant added and moved
Number: 43
Response: none
Number: 76
Response: street identified
Number: 67
Response: Trail widened to 8'
Number: 68
Response: ramps removed
Number: 65
Response: pan removed and storm pipe added
Number: 78
Response: Trickle pan added to divert water from going south onto adjacent property
71
Number: 61
Response: Grade breaks do not exceed 0.4%
Number: 62
Response: Cross sections are now shown for interim, ultimate, and existing conditions
Number 63
Response: Standard cross section added and labeled. Widening hatch pattern shows how
much is to be widened in interim conditions.
Number: 70
Response: 1000' of oftsite design included
Number: 72
Response: Grade has been adjusted so that the tracks will not be changed in elevation
Number: 73
Response: Legend will be added
Number: 74
Response: Fixed overlapping text
Number: 75
Response:
1. Addressed
2. Addressed
3. Addressed
4. Addressed
5. Refer to cover for abbreviations (I.E. irrigation easement)
Response: Electric vault shall be used from the mobile home park to the east by willox
lane and Maplewood road.
Number: 6
Response: Lcuass detail number 706 "Standard Driveway Approach types I and 11" has
been added to the detail sheet.
Number: 18
Response: Different curb types are labeled
Number: 51
Response: Trickle pan added
Number: 48
Response: Noted
Number: 56
Response: Man Hole relocated to the west.
Number: 59
Response: Stationing fixed
Number: 10
Response: Labeled and noted
Number: 12
Response: Provided exhibit to Dan DeLaughter showing the new separation
Number: 13
Response: Noted
Number: 49
Response: Tract identified
Number: 54
Response: Street cut for water line installation shown cut from existing edge of road.
Number: 60
Response: Intersection spot elevations included
STAFF PROJECT REVIEW
Michael Chalona
Land Images, Inc
1136 E. Staurt # 2040
Fort Collins, CO 80525
Arcadia PDP — Type II (returned comments from 5/10/2006)
Issues:
Department: Engineering
Number: 50
Response: Structural detail of the retaining wall along the property line has been added.
All walls are less then 30" tall as well.
Number: 9
Response: Access to the existing home will only be from Willox Lane, no easement
added off of Farmer's Lane.
Number: 53
Response: Legend added to overall utility plans. Unused numbered notes have been
removed on each sheet.
Number: 55
Response: The trail is now located in a public access easement.
Number: 57
Response: Sent Dan DeLaughter a copy of letter for permission to do work on R&R
property just after these review comments were made.
Number: 71
Response: No work is proposed on their property.
Number: 16
Response: Fixed overlapping text.
Number: 17