Loading...
HomeMy WebLinkAboutARCADIA AT WILLOX LANE - PDP - 5-05A - CORRESPONDENCE - (5)Number: 77 Response: Irrigation line is still being coordinated with the parks department Number: 64 Response: Trees adjusted Number: 36 Response: Basin 101 was re-routed into storm system and into detention pond Number: 31 Response: Easement dedicated to the City Number: 32 Response: Letter has been sent to Dan DeLaughter before the project went to hearing documenting the R&R being ok with the water and electric line crossings. 1Q",, .TOW,I Response: Irrigation line still being worked out with the parks department Number: 66 Response: Water line adjusted to be ductile iron with polywrap. Crossings show on profiles. Response: Noted Number: 7 Response: Layout shown on utility plans Number: 8 Response: Noted Number: 47 Response: Placement shown Number: 46 Response: Utility services shown Number: 39 Response: Hydrant added and moved Number: 43 Response: none Number: 76 Response: street identified Number: 67 Response: Trail widened to 8' Number: 68 Response: ramps removed Number: 65 Response: pan removed and storm pipe added Number: 78 Response: Trickle pan added to divert water from going south onto adjacent property 71 Number: 61 Response: Grade breaks do not exceed 0.4% Number: 62 Response: Cross sections are now shown for interim, ultimate, and existing conditions Number 63 Response: Standard cross section added and labeled. Widening hatch pattern shows how much is to be widened in interim conditions. Number: 70 Response: 1000' of oftsite design included Number: 72 Response: Grade has been adjusted so that the tracks will not be changed in elevation Number: 73 Response: Legend will be added Number: 74 Response: Fixed overlapping text Number: 75 Response: 1. Addressed 2. Addressed 3. Addressed 4. Addressed 5. Refer to cover for abbreviations (I.E. irrigation easement) Response: Electric vault shall be used from the mobile home park to the east by willox lane and Maplewood road. Number: 6 Response: Lcuass detail number 706 "Standard Driveway Approach types I and 11" has been added to the detail sheet. Number: 18 Response: Different curb types are labeled Number: 51 Response: Trickle pan added Number: 48 Response: Noted Number: 56 Response: Man Hole relocated to the west. Number: 59 Response: Stationing fixed Number: 10 Response: Labeled and noted Number: 12 Response: Provided exhibit to Dan DeLaughter showing the new separation Number: 13 Response: Noted Number: 49 Response: Tract identified Number: 54 Response: Street cut for water line installation shown cut from existing edge of road. Number: 60 Response: Intersection spot elevations included STAFF PROJECT REVIEW Michael Chalona Land Images, Inc 1136 E. Staurt # 2040 Fort Collins, CO 80525 Arcadia PDP — Type II (returned comments from 5/10/2006) Issues: Department: Engineering Number: 50 Response: Structural detail of the retaining wall along the property line has been added. All walls are less then 30" tall as well. Number: 9 Response: Access to the existing home will only be from Willox Lane, no easement added off of Farmer's Lane. Number: 53 Response: Legend added to overall utility plans. Unused numbered notes have been removed on each sheet. Number: 55 Response: The trail is now located in a public access easement. Number: 57 Response: Sent Dan DeLaughter a copy of letter for permission to do work on R&R property just after these review comments were made. Number: 71 Response: No work is proposed on their property. Number: 16 Response: Fixed overlapping text. Number: 17