Loading...
HomeMy WebLinkAboutARCADIA AT WILLOX LANE - PDP - 5-05A - CORRESPONDENCE -5000 KEY MAP N TS SECTION A -A SIDEWALK 4 88.75 FL 4989.14 CL 498 .75 FL IDEWALK PROPERTY LINE 4985.10 PL ER I PROPOSED 8" WA 10 5 0 HORIZONTAL SCALE: " = 10' VERTICAL SCALE: 1" = 10' 50 40 30 20 10 10 CL 10 NOTE: 1. EXHIBIT ONLY, CONSTRUCT STORM OFF OF STORM SEWER PLAN & PROFILE SHEETS 5000 4980 20 30 40 50 60 CROSS SECTIONS ARCADIA JOB NO. 39473.00 MARCH 27, 2006 SHEET 1 OF 3 J•R ENGINEERING A WOSWN Cmpmy 2620 East Prospect Rog We 190 • Fat Cabs, Ca WO 04-%-W • Fax 970A -9w • wwvitreigrmmoom ❑ ❑ ❑❑❑ ❑n �I ❑ ❑ ❑ ❑ ❑❑❑ n EI El 3N ;�� E ❑ A❑❑❑ D❑ ❑❑❑ ❑❑ O s! A _�� �D❑❑❑❑❑ ❑❑❑❑G KEY MAP NTS -,SECTION E-E 5010 PL PROPOSEO LOT 10 HOUSE APPROX. 65' 5000 PAD ELEVATION 4984.6 PROPOSED GROU D EXISTING GROUND 4990 4980 158.5150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 CROSS SECTIONS ARCADIA JOB NO. 39473.00 10 5 0 10 MARCH 27, 2006 SHEET 1 OF 3 HORIZONTAL NOTE: SCALE: 1" = 10' 1. EXHIBIT ONLY, CONSTRUCT STORM OFF OF STORM SEWER J-R ENGINEERING VERTICAL PLAN & PROFILE SHEETS ANhs6mCanpW „ SCALE: 1 = 10 2620 East Rospect Rm� sae 190 • Fat CoErs, co 025 9M-4%-M • Fax 9M-4%-M • wwwjeigiempw MEMORANDUM ft) J•R ENGINEERING A Westrian Company To: Mr. Ted Shepard 00 it From: Timothy J. Halopoff, P.E. J�E ISO Date: 6/15/06 Subject: Pakech, Pitt & NFCND&D Group Agreement Mr. Shepard, On the evening of June 14, 2006 Rob Dick, Kathy Crawford and I met with Ms. Pakech and Mr. Pitt to better understand and resolve 3 issues that Ms. Pakech and Mr. Pitt held concerning the development of the Arcadia neighborhood that is proposed to be directly north of the Pakech/Pitt property. All three issues were addressed, resolved and agreed upon by all parties involved. The first issue concerned the location of proposed lot 10 and its proximity to the Pakech/Pitt residence and yard. The solution that both parties agreed upon was to move lot 10 from its current. location to an alternative location on the development, while leaving the area where lot 10 was currently shown, as revegetated slope and grading for stormwater conveyance. The second issue concerned the stormwater runoff from approximately 5 acres of the development property entering into the private storm system located at the northwest corner of the Pakech/Pitt property at Wood Lane. The solution that both parties agreed upon was to create a pond area on the west end of the development property, flowing into the development storm system where lot 10 used to be, capturing all of the storm water conveyance and redirecting it to the east and south to the Soft Gold Park area. Finally, along the northerly property line of the Pakech/Pitt residence directly adjacent to the house, runs a makeshift swale that prevents nuisance and stormwater flows from hitting the structure located directly south of the Pakech/Pitt north property line. Currently this swale, which fails to handle the flow from the same 5 acres, mentioned previously, flows to the private storm system at Wood Lane that was also mentioned previously. While the proposed pond solves the problem of the overwhelming majority of the storm runoff, the current Swale will still receive nuisance flow from the Pakech property and a minimal portion of the gradual slope from the Arcadia development. The solution agreed upon by both parties was, to redesign that swale in such a manner that would direct the subsequent flows to remain consistent with the current flow path. With these issues identified and the above solutions agreed upon, all parties involved were satisfied with the agreements and mutually affirmed that pending these three changes, there were no longer any issues concerning the proposed Arcadia subdivision plan. n W1 C 01 6020CnamaoWP1mBa&%wd 2620PrahoapWRo4Wk190 4310AnumWeaDdve Cr=wwd VMw, 00 80111 FortCollm 008M Colaadospmg�0080907 303-740A393 • Fax 303-721-%19 970491-9898 • Fax:970491-9984 719-593-2593 • Fax 719-528-6613 IMI N. G M Shoet, &he 110 71mroo.0080241 720-872-9850 • Fax 720-M-9853