Loading...
HomeMy WebLinkAboutARCADIA AT WILLOX LANE - PDP - 5-05A - CORRESPONDENCE - CORRESPONDENCE-HEARINGshall be placed within an access easement and temporary construction easement. 5. A perimeter boundary fence shall be constructed along the west property line of the project (as opposed to the west property lines of Lots 1 — 9) that shall commence at Willox Lane on the north and terminate at a point that is close to the northwest corner of the Pekech/Pitt property on the south. This fence shall be designed with an open character that respects the commonly owned open space located between the rear property lines of Lots 1 — 9 and Wood Lane (private driveway). Such fence shall not be six feet in height with solid pickets but may be "split rail' or other similar style. Further, such fence shall effectively but temporarily block the aforementioned bicycle and pedestrian spur with a gate. Such spur shall be constructed with initial development. The gate, however, shall remain locked until such time when future development on adjacent parcels creates a logical destination point. The obligation to construct such spur, fence and gate shall be established in the Development Agreement between the City and the developer. If you have any questions regarding these actions by the Planning and Zoning Board, please feel free to call our office at 221-6750. Sincerely: Ted Shepard Chief Planner xc: Paul Eckman, Deputy City Attorney Dan DeLaughter, Development Review Engineer June 20, 2006 Mr. Michael Chalona Land Images, Inc. 1136 E. Stuart Street, Suite 2040 Fort Collins, CO 80525 RE: Arcadia at Willox Lane P.D.P. Dear Michael: On Thursday, June 15, 2006, at the regular meeting of the City of Fort Collins Planning and Zoning Board, the Board voted 6 — 0 to approve Arcadia at Willox Lane P.D.P., #5-05A, subject to the following conditions: 1. Lot 10 shall be moved from its current location to an alternative location that is further removed from the south property line so as to mitigate the impact on the abutting property. 2. The drainage and grading plan shall be revised such that the approximate five acres that drain into the private storm sewer located at the northwest corner of the Pekech/Pitt property along "Wood Lane" (private driveway) shall be re -designed. The new drainage and grading plan shall create a stormwater detention pond area on the west end of the Arcadia development property that shall then drain into the Arcadia storm sewer system located on the former location of Lot 10. These flows shall then be conveyed to the east and south to the Soft Gold Park area. 3. The existing drainage swale located directly south of the Pekech/Pitt north property line shall be engineered and redesigned in such a manner that would accept the new stormwater generated south of the new pond, to be located on the former location of Lot 10, and that these flows will then be directed west, as it currently flows, into the existing pipe on the Pekech/Pitt property. 4. The ultimate location of the bicycle/pedestrian spur, that is designed to connect Arcadia to the neighborhood to the west, shall be determined during consideration of the Final Plan. Such spur