HomeMy WebLinkAboutHARMONY TECH PARK 3RD FILING, LOT 1 - FDP - FDP110008 - CORRESPONDENCE -City of
Fart Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
06/15/2011: Revise the connection of the fire line to the 12" main as noted on the redlined
utility plans.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project, please
feel free to contact me at 970-221-6343.
Sincerely,
/�
4k,40U44
Ted Shepard
Chief Planner
I
1
Staff Review Letter Generated: 6/20/2011 at 2:21 pm
I
City of
Fart Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
Topic: General
Number: 1 Issue Originated: 06/14/2011
06/14/2011: Several cross -sections are needed for the eastern Swale showing HWL to
verify capacity.
Number: 2 Issue Originated: 06/14/2011
06/14/2011: The eastern swale has a lot of landscaping, including trees, in the middle of
the trees. The Swale is also below the 2% minimum for a swale without a pan. The steep
side slopes may also be a problem with rock mulch or wood mulch. Coordination needs
to take place to mitigate all concerns.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty(a)fcgov.com
Topic: Construction Drawings
Number: 21
06/15/2011: No comments.
Topic: Landscape Plans
Issue Originated: 06/15/2011
Number: 20 -- - Issue Originated: 06/15/2011-
06/15/2011: Please correct the project name on the Hydrozone & Planting Plans.
"Technology" is spelled incorrectly.
Topic: Plat
Number: 18
06/15/2011: No comments.
Topic: Site Plan
Issue Originated: 06/15/2011
Number: 19 Issue Originated: 06/15/2011
06/15/2011: Please correct the project name on the Site Plan. 'Technology" is spelled
incorrectly.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington(cDfcgov.com
Topic: Construction Drawings
Number: 1 Issue Originated: 06/13/2011
06/13/2011: The detail for the remote fire department connection (FDC) on Sheet 11 of 13
is incorrect. Inside the building, the line from the FDC must connect downstream from an
approved backflow preventer. A check valve does not provide adequate protection.
Number: 2 Issue Originated: 06/15/2011
1
Staff Review Letter Generated: 6/20/2011 at 2:21 pm
City of
Fart Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221,6750
970.224.6134 - fax
fcgov.com
Topic: Landscape Plans
Number: 3 Issue Originated: 06/15/2011
06/15/2011: [Suggestion, not a requirement] Perhaps the bollards shown where the drive
aisle is flush without curb and gutter would benefit from having low-level lighting in order to
reduce the likelihood of vehicles accidentally hitting the bollards in no/low light conditions.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine(cDfcgov.com
Topic: General
Number: 1 Issue Originated: 05/26/2011
05/26/2011: After the site plan is final and approved, please send an AutoCad copy to
Terry Cox at TCOX@FCGOV.COM.
Department: PFA
Contact: Carie Dann, 970-219-5337, CDANN(aD_poudre-fire.orq
Topic: General
Number: 1 Issue Originated: 06/15/2011
06/15/2011: KNOX BOX LOCATIONS: The Knox Box on the north end of the building is a
good location. We can use this KB to access the building and the riser room. Thanks for
showing both Knox Boxes, very helpful.
Number: 2 Issue Originated: 06/15/2011
06/15/2011: FDC: There's conflicting information about the FDC location. Your response
is that the FDC was relocated to the north side of the building. However, the site plan still
shows it on the SW corner.
Number: 3
Issue Originated: 06/15/2011
06/15/2011: NO PARKING -FIRE LANE SIGNS: Two more signs will be needed on the NW
corner of the building if the FDC has been relocated to the NW corner.
Number: 4 Issue Originated: 06/15/2011
06/15/2011: FIRE LINE SIZE: The site plan shows an 8-inch fire line; the plan set shows 6
inch. Please correct so it's accurate and consistent.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com
Topic: General
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(a_fcgov.com
1
Staff Review Letter Generated: 6/20/2011 at 2:21 pm
City of
F6rt Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970,224,6134 - fax
fcgov.com
June 20, 2011
Jason Messaros
BHA Design, Inc.
1603 Oakridge Dr
Fort Collins, CO 80525
City staff and outside reviewing agencies have reviewed your submittal for Harmony Technology
Park 3rd Filing Lot 1 Replat, and we offer the following comments:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata(Wcaov.com
Topic: Construction Drawings
Number: 1 Issue Originated: 06/14/2011
-06/-14/201-1-On-the-horizontal-control plan -the driveway -out -to RockCreekDrive correctly — - -
shows sidewalk across the driveway. Please also provide that visibile representation on
the other two driveways.
[PDP #2] 03/22/2011: The proposal of crosswalk striping for the drive approach onto
Technology Parkway is again similar to the previous comment in that it is more typical of a
public street than a driveway. It would technically be proposing putting a crosswalk stripe
on top of a sidewalk as the sidewalk continues across the driveway per LCUASS drawing
707. It's preferred that the crosswalk not be added as maintenance of the striping (and by
whom?) would be an ongoing issue.
Number: 2 Issue Originated: 06/15/2011
06/15/2011: Please ensure the notes regarding sidewalk installation directly east of the site
along Precision Drive are consistent between sheets 3 and 6.
Number: 4 Issue Originated: 06/16/2011
06/16/2011: On the grading plan please consider providing a larger font for the label "zero
curb height" as it's possible that the existing font size will not reproduce/scan well.
Number: 5
Issue Originated: 06/16/2011
06/16/2011: Please ensure at the time of mylar signatures on the construction drawings
that FCLWD/SFCSD signs the mylars first, prior to delivery to the City for signature.
1
Staff Review Letter Generated: 6/20/2011 at 2:21 pm