HomeMy WebLinkAboutHARMONY TECH PARK 3RD FILING, LOT 1 - FDP - FDP110008 - CORRESPONDENCE -City of Fart Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com 06/15/2011: Revise the connection of the fire line to the 12" main as noted on the redlined utility plans. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to contact me at 970-221-6343. Sincerely, /� 4k,40U44 Ted Shepard Chief Planner I 1 Staff Review Letter Generated: 6/20/2011 at 2:21 pm I City of Fart Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Topic: General Number: 1 Issue Originated: 06/14/2011 06/14/2011: Several cross -sections are needed for the eastern Swale showing HWL to verify capacity. Number: 2 Issue Originated: 06/14/2011 06/14/2011: The eastern swale has a lot of landscaping, including trees, in the middle of the trees. The Swale is also below the 2% minimum for a swale without a pan. The steep side slopes may also be a problem with rock mulch or wood mulch. Coordination needs to take place to mitigate all concerns. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty(a)fcgov.com Topic: Construction Drawings Number: 21 06/15/2011: No comments. Topic: Landscape Plans Issue Originated: 06/15/2011 Number: 20 -- - Issue Originated: 06/15/2011- 06/15/2011: Please correct the project name on the Hydrozone & Planting Plans. "Technology" is spelled incorrectly. Topic: Plat Number: 18 06/15/2011: No comments. Topic: Site Plan Issue Originated: 06/15/2011 Number: 19 Issue Originated: 06/15/2011 06/15/2011: Please correct the project name on the Site Plan. 'Technology" is spelled incorrectly. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington(cDfcgov.com Topic: Construction Drawings Number: 1 Issue Originated: 06/13/2011 06/13/2011: The detail for the remote fire department connection (FDC) on Sheet 11 of 13 is incorrect. Inside the building, the line from the FDC must connect downstream from an approved backflow preventer. A check valve does not provide adequate protection. Number: 2 Issue Originated: 06/15/2011 1 Staff Review Letter Generated: 6/20/2011 at 2:21 pm City of Fart Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221,6750 970.224.6134 - fax fcgov.com Topic: Landscape Plans Number: 3 Issue Originated: 06/15/2011 06/15/2011: [Suggestion, not a requirement] Perhaps the bollards shown where the drive aisle is flush without curb and gutter would benefit from having low-level lighting in order to reduce the likelihood of vehicles accidentally hitting the bollards in no/low light conditions. Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine(cDfcgov.com Topic: General Number: 1 Issue Originated: 05/26/2011 05/26/2011: After the site plan is final and approved, please send an AutoCad copy to Terry Cox at TCOX@FCGOV.COM. Department: PFA Contact: Carie Dann, 970-219-5337, CDANN(aD_poudre-fire.orq Topic: General Number: 1 Issue Originated: 06/15/2011 06/15/2011: KNOX BOX LOCATIONS: The Knox Box on the north end of the building is a good location. We can use this KB to access the building and the riser room. Thanks for showing both Knox Boxes, very helpful. Number: 2 Issue Originated: 06/15/2011 06/15/2011: FDC: There's conflicting information about the FDC location. Your response is that the FDC was relocated to the north side of the building. However, the site plan still shows it on the SW corner. Number: 3 Issue Originated: 06/15/2011 06/15/2011: NO PARKING -FIRE LANE SIGNS: Two more signs will be needed on the NW corner of the building if the FDC has been relocated to the NW corner. Number: 4 Issue Originated: 06/15/2011 06/15/2011: FIRE LINE SIZE: The site plan shows an 8-inch fire line; the plan set shows 6 inch. Please correct so it's accurate and consistent. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com Topic: General Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue(a_fcgov.com 1 Staff Review Letter Generated: 6/20/2011 at 2:21 pm City of F6rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970,224,6134 - fax fcgov.com June 20, 2011 Jason Messaros BHA Design, Inc. 1603 Oakridge Dr Fort Collins, CO 80525 City staff and outside reviewing agencies have reviewed your submittal for Harmony Technology Park 3rd Filing Lot 1 Replat, and we offer the following comments: Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata(Wcaov.com Topic: Construction Drawings Number: 1 Issue Originated: 06/14/2011 -06/-14/201-1-On-the-horizontal-control plan -the driveway -out -to RockCreekDrive correctly — - - shows sidewalk across the driveway. Please also provide that visibile representation on the other two driveways. [PDP #2] 03/22/2011: The proposal of crosswalk striping for the drive approach onto Technology Parkway is again similar to the previous comment in that it is more typical of a public street than a driveway. It would technically be proposing putting a crosswalk stripe on top of a sidewalk as the sidewalk continues across the driveway per LCUASS drawing 707. It's preferred that the crosswalk not be added as maintenance of the striping (and by whom?) would be an ongoing issue. Number: 2 Issue Originated: 06/15/2011 06/15/2011: Please ensure the notes regarding sidewalk installation directly east of the site along Precision Drive are consistent between sheets 3 and 6. Number: 4 Issue Originated: 06/16/2011 06/16/2011: On the grading plan please consider providing a larger font for the label "zero curb height" as it's possible that the existing font size will not reproduce/scan well. Number: 5 Issue Originated: 06/16/2011 06/16/2011: Please ensure at the time of mylar signatures on the construction drawings that FCLWD/SFCSD signs the mylars first, prior to delivery to the City for signature. 1 Staff Review Letter Generated: 6/20/2011 at 2:21 pm