Loading...
HomeMy WebLinkAboutISLAMIC CENTER OF FORT COLLINS - PDP - PDP110011 - ADMIN HEARING PACKET - RECOMMENDATION/REPORT5. Neighborhood Meetings: Two neighborhood information meetings were held. The first one provided general information on a variety of topics and concerns. The second meeting was a follow-up meeting to specifically address the design proposals for controlling cut -through traffic on Summer Street. Summaries of these meetings are attached. 6. Findings of Fact / Conclusion: A. The P.D.P. conforms to the West Central Neighborhoods Plan. B. The P.D.P. complies with the applicable land use and development standards of the H-M-N, High Density Mixed -use Neighborhood zone. C. The P.D.P. complies with the applicable General Development Standards. D. As a permitted use subject to administrative review, neighborhood meetings are not required. Two neighborhood meetings were held. One was a general information meeting and the second one focused on the treatment of the Summer Street terminus and design solutions to address cut -through traffic. RECOMMENDATION: Staff recommends approval of the Islamic Center of Fort Collins, #110011. uses. Other large buildings in the neighborhood include an existing church and apartment building. J. Section 3.5.1(G) — Building Height Review The building achieves a height of 52 feet to the top of the dome. Although the H-M-N allows five stories, buildings over 40 feet are subject to the height analysis. (The minaret is considered equivalent to a steeple and is, therefore, exempt from the height analysis.) The building is not uniformly 52 feet in height. The height analysis reveals that there is no adverse impact relative to views, light and shadow, privacy or neighborhood scale. K. Section 3.5.3(C) — Variation in Massing and Section 3.5.3(D) — Character and Image For the standards not addressed in Section 4.10, the building contains sufficient changes in mass so as to not exceed a height -to -width ratio of one -to -three. In addition, there is a clear delineation of the base, middle and top so as to comply with the applicable standards. L. Section 3.6.4 — Transportation Level of Service Requirements An intermediate level Transportation Impact Study was prepared for this project. The peak hour is considered to be noon on Friday. During a typical Friday noon worship, it is expected that approximately 250 people will attend. The Study concludes: • Acceptable level of service is achieved for pedestrian, bicycle and transit modes. Transfort routes 2,3, and 19 have stops within 800 feet of the site. • In the short range future (2015), given 'development of the Islamic Center and an increase in background traffic, the Shields/Prospect and the Shields/Lake and the Shields/Summer intersections will operate acceptably with existing control and geometry.. • The development of the Islamic Center is feasible from a traffic engineering standpoint. 0 and is specifically designed to accommodate a variety of modes to serve the student worshippers. F. Section 3.2.2(K)(1) — Required Number of Off -Street Spaces Places of Worship are required to provide a minimum of one space per four seats in the main assembly area. Since a Mosque does not feature seats, and worshippers both stand and kneel, the area devoted per parishioner has been calculated at 11.25 square feet. The prayer hall and prayer mezzanine contain 4,285 square feet. A capacity of 381 worshippers is derived by dividing 4,285 by 11.25. With 381 worshippers, and a requirement of at least one space per four worshippers, a minimum of 95 spaces are needed. There are 95 spaces provided onsite, four being handicap -accessible, thus complying with the standard. G. Section 3.2.4 — Site Lighting Light fixtures will feature fully shielded light sources. There are no foot- candles in excess of 0.1 measured 20 feet beyond the property line. H. Section 3.3.1— Plat Standards The property will be replatted. The plat will dedicate the proper amount of public right-of-way and dedicate proper utility, access, drainage and emergency access easements in compliance with the standard. Section 3.5.1— Building and Project Compatibility This standard requires that in areas where the existing architectural character is not definitively established, or is not consistent with the purposes of the Land Use Code, the architecture of new development shall set an enhanced standard of quality for future projects or redevelopment in the area. The building respects the architectural traditions associated with a Mosque by the inclusion of a dome, minaret and large area of assembly as the primary prayer area. Two stories are required by Islamic practice of providing a separate mezzanine as an additional prayer area. Exterior materials have been specifically selected to represent the vernacular of non-residential buildings found in the region. The size and height of the building are mitigated by dividing the mass into smaller proportions based on function. This results in a variety of recesses projections highlighted by small pitched roofs. The building is articulated on all four sides. The placement of the building is set back from Lake Street by 60 feet and significantly separated from the adjoining a A. Section 3.2.1 — Landscaping and Tree Protection Street trees are provided along Lake Street with proper species selection and intervals meeting the requirements for separation from street lights. The front yard includes five trees in compliance with full tree stocking. Foundation plants are provided where visible from Lake Street and not in conflict with future building phases. Drought -tolerant ground cover will be planted in the future phase areas. B. Section 3.2.1(E)(4) — Parking Lot Perimeter Landscaping Both the east and west parking lots are treated with perimeter landscaping. Along the west edge, next to the existing houses, a four foot high solid fence and a continuous row of shrubs are provided. Along the east edge, fencing is not needed as the adjoining land use is a stormwater detention pond for the existing church. A mix of trees and shrubs are provided at intervals to provide a continuous canopy at full maturity. C. Section 3.2.1(E)(5) — Parking Lot Interior Landscaping The ends of the parking rows are defined by landscape islands in compliance with the standard. D. Section 3.2.1(F) — Tree Protection and Replacement There is a grove of existing trees that border the residential property to the south and several of these trees are impacted by the east parking lot. Invasive species such as Siberian Elm, Russian Olive and Cotton -bearing Cottonwood may be removed without mitigation. Other existing trees to be removed will evaluated by the City Forester, and based on their individual value, a mitigation schedule will be determined and replacement trees will be identified on the Final Landscape Plan. E. Section 3.2.2 — Access, Circulation and Parking Primary access is gained via Lake Street. Secondary access is gained from Summer Street, but only on Fridays — the primary day of worship. Access from Summer Street will be controlled by a traffic control device such as an operable gate or removal bollards in order to prevent unwanted cut -through traffic to Lake Street. There are connecting walkways to all three public streets: Lake Street; Summer Street and Prospect Road. Bicycle parking is provided near the main entrance. The site is in close proximity to Colorado State University Although this standard was primarily aimed at multi -family structures, the essence of the standard is to require buildings to be interesting with no blank walls with architectural features that break down the mass, height, bulk and scale. The building accomplishes this by being broken up into various modules based on function. There are a variety of projections that break up the wall planes. The entry feature, dome, minaret, and window pattern all contribute making this an interesting and unique building thus complying with the standard. Section 4.10(E)(1)(0 — Outdoor Activity This standard requires that buildings shall be designed to form outdoor spaces such as balconies, terraces, patios, decks or courtyards. There is a patio area serving the front entry and a large courtyard along the south elevation thus complying with the standard. J. Section 4.10(E)(2)(a) — Street Sidewalk This standard requires that existing sub -standard public sidewalks be replaced with new sidewalks meeting current requirements. There will be re -construction of the sidewalk along Lake Street to remove the existing attached sidewalk and replace it with a new, five foot wide detached sidewalk thus complying with the standard. K. Section 4.10(E)(2)(b) — Parking Lots This standard requires that new parking lots are located toward the side and rear of the building and not in the front yard. There is 358 feet of frontage along Lake Street. The front yard area occupies 210 feet (59%) of this frontage. Parking is divided between two parking lots, one on the east edge and one on the west edge. This distributed parking helps diminish the impact of one single parking lot as viewed from Lake Street. For both lots, the first parking stall is set back from Lake Street by 50 feet. This parking lot arrangement minimizes the visual impact of large asphalt surfaces thus complying with the standard. 4. Compliance with Applicable General Development Standards: The H-M-N zone contains numerous specific standards. Remaining applicable General Development Standards that have not already been addressed are described below. M D. Section 4. 10(E)(1) (a) — Doorways Facing Streets This standard requires that doorways shall face the street at grade level or slightly elevated. Lake Street forms the north boundary. The building is oriented towards the northwest with the primary doorway visible from Lake Street thus complying with the standard. E. Section 4.10(E)(1)(b) — Relationship of Doorways to Streets This standard requires that the street -facing entry be the principal entrance with sidewalk access to the street. The entrance is connected to the public sidewalk on Lake Street by a ten foot wide concrete walkway thus complying with the standard. F. Section 4.10(E)(1)(c) — Front Yards This standard requires that building and site design include structured elements to mark the transition from the public street to the doorways. Within the 60 foot front yard, there is a variety of landscaping, patio, bicycle parking and an entrance featuring a height of one and one-half story thus complying with the standard. G. Section 4.10(E)(1)(d) — Roof Form This standard requires that buildings have either sloped roofs or combined flat and sloped roofs, provided that the sloped portions form a substantial part of the building and is related to the street fagade, the integral structure and building entries. The building is primarily characterized by the dome which faces Lake Street. In addition, there are a variety of smaller pitched roofs (dome -like) on top of projecting elevations at lower heights in various locations. These pitched roofs act as accent features and are combined with the flat roof portions in a sufficient manner as to comply with the standard. H. Section 4.10(E)(1)(e) — Fagade Variations This standard requires that the building be articulated with projections, recesses, covered doorways, balconies, covered box or bay windows and/or other similar features, dividing large facades into human -scale proportions that reflect single-family dwellings nearby and avoiding repetitive monotonous, undifferentiated wall planes. 5 that the Islamic Center mosque is a land owner with development aspirations. Finally, the Plan envisions that places of worship will play an important role is establishing neighborhood identity, diversity and cohesion. 3. Compliance with the H-M-N Zone District: A. Section 4.10(B)(2)(b)1. - Permitted Use Places of worship are a permitted land use within the H-M-N zone, subject to Administrative Review. B. Section 4.10(D)(2)(a) - Maximum Building Height The maximum allowable building height is five stories. Section 3.8.17 addresses building height for residential and commercial applications but fails to specifically address places of worship. Section 1.7.2 directs that when there is a lack of specificity, the more stringent interpretation applies which, in this case, would be to categorize the proposed structure as a residential use. ,Section 3.8.17 clarifies that for a residential application, a story is equivalent to a height of 12 feet eight inches. At five stories, the equivalent is 63 feet four inches. The Mosque is 52 feet in height to the top of the dome as measured from average grade. The minaret (equivalent to a steeple) achieves a height of 72 feet but is specifically exempted from the height standard per Section 3.8.17(C)(6). Thus, the structure complies with the maximum height standard in the H-M-N zone. C. Section 4.10(D)(2)(b) — Setback This standard requires that building walls over 35 feet in height shall be setback an additional one foot beyond the minimum required for each two feet, or fraction thereof, of wall or building that exceeds 35 feet in height. Since the H-M-N zone does not specifically address the front minimum required setback, then the prevailing standard is the build -to line per Section 3.5.3(13)(2)(b) which establishes that the build -to line for an institutional building shall be no greater than 15 feet since Lake Street is smaller than a standard arterial street. As mentioned, the height of the building wall facing Lake Street is 52 feet to the top of the dome. This height exceeds 35 feet by 17 feet and therefore requires an additional nine feet of front setback. Thus the building must be a minimum of 24 feet back from the front property line. The building is 60 back from the front property line thus complying with the standard. 4 Specific to the Islamic Center, the Plan states: "H. Issue: Diversity. Definition: For purposes of the West Central Neighborhoods Plan, "diversity" is limited to its cultural, ethnic, racial, social, age, gender and economic aspects. These terms are overlapping and not intended to be mutually exclusive. 4. An ongoing plan to construct an Islamic mosque on a vacant Lake Street parcel near CSU has drawn some criticism from individuals in its early stages but is generally favored by the neighborhood as an appropriate use of the land." The Plan also states: Sense of Community: "SC1 Provide common activities and facilities for those living in the West Central Neighborhoods to encourage a feeling of connection, sense of belonging and means for interaction. Colorado State University, the Poudre School District, and the area's places of worship, and cultural institutions can serve as a focal point providing facilities, cultural events, academic events, sporting events, etc. which can enhance community cohesion." "SC4 Respect and accommodate cultural, social and economic diversity in the West Central Neighborhoods. Identify opportunities for creating an awareness of promoting acceptance for the diversity of the West Central Neighborhoods and its integral role in the neighborhood -building." (2f) — Presence of Schools, Recreational, Religious and Other Infrastructure Facilities: "Recreational, religious, school and other infrastructure facilities play a pivotal role in enhancing community cohesion. For instance, they can provide locations for functions that bring the community together. Fortunately many of these facilities are available in the West Central Neighborhoods." In summary, the Plan acknowledges that the area between Prospect Road and Lake Street acts as a buffer between CSU and the residential neighborhoods to the south. The Plan acted as the catalyst to rezone this area to H-M-N. While multi -family is expected to be the predominant land use, the Plan states directly 3 COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: H-M-N; Multi -family S: M-M-N; Multi -family E: H-M-N; Place of Worship W: H-M-N; Single family detached The parcel is vacant and undeveloped. In 1979, the property was granted approval for the Lake Street Townhome P.U.D. which consisted of 20 townhome lots on 3.26 acres. This P.U.D. has since expired. In 1999, the parcel was rezoned from R-L, Low Density Residential to H-M-N, High Density Mixed -Use Neighborhood as an implementation item for the West Central Neighborhoods Plan. 2. Compliance with West Central Neighborhoods Plan: As mentioned, the parcel is located within the West Central Neighborhoods Plan which laid the foundation for the H-M-N zone. The Plan addresses a wide range of issues for a large area dominated by Colorado State University. In general, the Plan acknowledges an overall lack of cohesion in the area: Introduction: Because of its mix of age, origins, and uses, the planning area does not reflect any composite character." Overall Visual Character: "Visual character defines the impression of the planning area being studied, and as such is quite important. It must be recognized, however, that much of the infrastructure of the various neighborhoods are already in place and will be difficult to change. Furthermore, the WCN is not a homogenous neighborhood but rather an amalgamation of disparate neighborhoods, each with its own unique characteristics." ra F I City of :ort Collins 11 EM NO :. MEETING DATE LTuNE 89 a a i STAFF %EA SHFr°A�to HEARING OFFICER PROJECT: Fort Collins Islamic Center, P.D.P., #110011 APPLICANT: Islamic Center of Fort Collins c/o Mr. Dana Lockwood Lockwood Architects, Inc. 1027 Horsetooth Road, #2006 Fort Collins, CO 80525 OWNER: Islamic Center of Fort Collins c/o Lutfur Khandaker 900 Peterson Street Fort Collins, CO 80524 PROJECT DESCRIPTION: This is a request to construct a new facility consisting of a Mosque, children activity area, gymnasium and elementary school. The project will be constructed in phases with the Mosque being Phase One, the school being Phase Two and the gymnasium being Phase Three. Phase One will consist of the worship area and contain 11,600 square feet. The site is 3.26 acres and zoned H-M-N, High Density Mixed -Use Neighborhood. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The P.D.P. complies with the West Central Neighborhoods Plan. The P.D.P. also complies with the applicable standards of the H-M-N zone and the General Development Standards. Two neighborhood meetings were held to inform the public of the overall plan, address neighborhood compatibility issues, and review traffic control issues primarily related to Summer Street. Current Planning 281 N College Ave - PO Box 580 - Fort Collins, CO 80522-0580 fcgov.com/currentplanning 970.221.6750