Loading...
HomeMy WebLinkAboutHARMONY TECH PARK 3RD FILING LOT 1 REPLAT - PDP - PDP110001 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (3)Gty oF [tins ort C.0 Development Review Guide STEP 2�of 8 CONCEPTUAL REVIEW: APPLICATION General Information All proposed development projects begin with Conceptual Review. Anyone with a development idea can schedule a Conceptual Review meeting to get feedback on prospective development ideas. At this stage, the development idea does not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City Staff prior to the Conceptual Review meeting The more information you are able to provide, the better feedback you are likely to_get from the meeting. Please.be awaie"-fh t any,informah'on,submitted 'may be.considered a public_record; available for review byanyonewho requests it, including the,media Conceptual Reviews are scheduled on. three Mondays per month. One half-hour meeting is allocated per applicant. Please call the Community Development and Neighborhood Services Office at 221-6750 to schedule a Conceptual Review meeting. Conceptual Review is a free service. Applications and sketch plans must be submitted to City Staff no later -than 5 pm, two Tuesdays prior to the meeting date. Application materials can be dropped off in person to 281 N College Ave., emailed to Courtney Rippy at crippy,,Afcgov.com or taxed to (970)224-6134. At Conceptual Review, you will meet with Staff from a number of City departments, such as Community Development and Neighborhood Services (Zoning, Current Planning, and Development Review Engineering), Light and Power, Stormwater, Water/Waste Water, Advance Planning (Long Range Planning and Transportation Planning) and Poudre Fire Authority. Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no approval or denial -of development proposals associated with Conceptual Review. At the meeting you will be presented with a letter from staff, summarizing comments on your proposal. *BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detalled YOUr omments frooml st ff will be.` Contact Name(s) and Role(s) (Please identify whether Consultant or Owner, etc)q(%q Business Name (if Phone Number ZZ3 - 75 77 Fax Number 7-Z3 - 1 gZ7 1 Mailing Address f �D�3, dot L Email Address A tM (�e wS� 1 �' 1:9L4 e71e 5 r� td .Gdl+1 Site Address or Description (parcel Wlif no address) Z- TGch o D i o Description of Proposal sheets if la Proposed Use Existing Use %1/f Total Building Square Foo aged 000 S.F. Number of Stories / Lot Dimensions '?)W X &OD Age of any Existing Structures N A Info available on Latimer County's Webs—ite:`fCh vJ if any structures are 50+ years old, good quality, photos of all sides of the structure are required. Is your property in.a Flood Plain? . D Yes No if yes, then at what risk is it? Info available on FC Maps: htttp:!/gis.f000v.com/fcmaos%fcmao.aSDx Click Floodplains tab and zoom to property. Increase in Impervious Area - /5a, pDp 5 . S.F. (Approximate amount of.additional building, pa ement, or etc. that will cover existing bare ground to be added to the site) Suggested items for the Sketch Plan: Property location and boundaries, surrounding land uses, proposed use(s), existing and proposed improvements (buildings, landscaping; parking/drive areas,,water,treatment/detention, drainage), existing natural features (water bodies,. wetlands, large trees, wildlife, canals, irrigation ditches), utility i , e locations (if known), photographs (helpful but not required)..Things to consider when making a proposal: How.does the site drain now? Will it change? If so, what will change? Community Development & Neighborhood Services - 281 N College Ave - Fort Collins, CO 80522-0580