HomeMy WebLinkAboutATRIUM SUITES - PDP - 7-04A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT4
Final Drainage Report
for
r Atrium Suites
EXHIBITS
u
Exhibit 1 Atrium Suites Historic Drainage Plan
Exhibit 2 Atrium Suites Developed Drainage Plan
APPENDICES
Appendix A
Hydrology Calculations
Appendix B
Hydraulic Calculations
Appendix C
Erosion Control Calculations
Appendix D
Water Quality Calculations
Final Drainage Report for
■� Atrium Suites
TABLE OF CONTENTS
VICINITY MAP
Page No.
I INTRODUCTION
1.1 Objective.................................................1
1.2 Project History and Previous Studies ............................
........... 1
1.3 Mapping and Surveying ......................................
1
1.4 Site Reconnaissance........................................1
y II SITE LOCATION AND DESCRIPTION
2.1 Site Location..............................................1
2.2 Site Description ............................................
1
III DRAINAGE BASINS AND SUB -BASINS
3.1 Major Basin Description ......................................
2
3.2 Sub -Basin Description .......................................
2
IV DRAINAGE DESIGN CRITERIA
4.1 Design Criteria and Constraints ................................
2
4.2 Hydrologic Criteria ..........................................
3
4.3 Hydraulic Criteria ...........................................
3
V DRAINAGE FACILITIES DESIGN
5.1 Proposed Site Development ..................................
3
5.2 Developed Drainage Patterns .................................
3
5.3 Detention.................................................4
5.4 Erosion Control ............................................
4
5.5 Water Quality ..............................................4
VI CONCLUSIONS
6.1 Compliance with Standards ...................................
5
REFERENCES..................................................5
�04
CIVIL / ENGINEERS �.
. February 18, 2004
- - City of Fort Collins
-,� Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
' Re: Final Drainage Report for
Atrium Suites
Fort Collins, Colorado
Dear Staff:
1 435 WEST 29" STREET
LOVELAND, CO 60535
(970) 461-2661
FAx (970) 461-2665
WWW. DMWCIVILENGINEERS.COM
DMW Civil Engineers is pleased to submit this drainage study for Atrium Suites for your
review. This report complies with technical criteria set forth in the City of Fort Collins'
Storm Drainage Design Criteria and Construction Standards manual and the Urban Storm
Drainage Criteria Manual, Volume 3, by the Urban Drainage and Flood Control District.
We acknowledge that the City of Fort Collins' review of this study is only for general
conformancewith submittal requirements, current design criteria and standard engineering
principles and practices.
If you should have any questions or comments as you review this report, please feel free
to contact me at your convenience.
Sincerely,
DMW CIVIL ENGINEERS
o ; :07
(FOR REVIEW
PURPOSES ONLY)
Jade P. Miller, P.E. (CO #33885)
Project Engineer
N
Final Drainage Report
for
Atrium Suites
Fort Collins, Colorado
February 18, 2004
Prepared for:
Barbara Seik
P.O. Box 1613
Fort Collins, Colorado 80522
Prepared by:16 "
CIVIL MNGINE!RS
1435 W. 29"' Street
Loveland, Colorado 80538
Phone: (970)461-2661
Fax: (970)461-2665
Project Number: 0404.00-ATR