will be incorporated into the design for. all storm water run-off.
10. Refer to civil engineering drawings in response to this %comment.
11. Refer to civil engineering, utility drawings in response to this comment.
12. The building will include a'sprinkler system. - Refer to Utility drawings for
additional requirements for water services. Further coordination with Poudre Fire
Authority will be arranged.
13. The panting structure will include a solid wall on the west edge of the structure,'
where the building is 5'-0" from the property line. 'The parking structure will
,provide adequate ventilation, and fire protection.
14. Comments acknowledged. '
15. A transportation Impact study will not be submitted at the initial submittal. The
applicant requests that this study be waived, as the actual impact from the
current conditions to proposed project will be equal to or a reduction in traffic
generated from this site. Currently there are 104 residents and 22 full time
employees,. who travel from this site now, and future parking allows for 28 on -site,
parking spaces. The'future conditions would amount to a reduction in trips per
day. If additional information is required, please contact Don Brookshire of
Eastpoint Studio; 207-1973.
W Less than 350 trips per day is expected from the Sherwood St. driveway.
17. T•he driveway on Sherwood St will.exceed 175'-0" from Laurel street center line
to drive way center line.
18. All drive aisles will be minimum of 24'-0" in width.
19. Comments acknowledged..
20. Comments acknowledged.
21. Refer to Utility drawings for utility locations.
22-. Comments acknowledged.
•23. No trees on site are expected to 'be removed;: at this time. A trash enclosure is
planned to be located adjacent to the rear Alley, and will contain recycle bins.
24. Utility Plans are included as a part. of this submittal
25. Additional 1'-0" of right of -way to be dedicated with a 15'-0" utility easement is
planned for. Refer to site. plan drawings.
26. A plat.is_included with this submittal
.27. The applicant requests that a neighborhood meeting be scheduled. APO lists
have been included with this submittal.
If there are any further questions, please contact me. '
Don Brookshire, Eastpoint Studio.
G
Ceasipoint
studio a«
February 17, 2004 '
Mr. Ted Shepard .
City. Planner
City of Fort Collins
.Current Planning Department
Re: Atrium Suites PUD, response to Conceptual Review Comments
A Design Collaborative
"
Dear Ted,
The follo%44ng items are responses to comments from the Conceptual Review of 502
West Laurel Street — Apartment Complex.
1. The proposed project is a 3-story building, with 24 — 2 Bedroom units, and 4 — 1
bedroom units, and managers office, an allowable use, within the zone district,
subject to review by the -Planning and Zoning Board;• therefore the project is
considered a Type II review. 'A modification request has been submitted for'
allowable floor area to lot ratio, see item no. 2.
2.,• The lot area. is 19,220.86 s.f. and the proposed building has 2063.40 s.f. of
livable floor area. A modification of standards for this requirement was submitted
on February8, 2004.•
3. The building is setback -from the Laurel St. front yard 16'-0", the Sherwood side
yard setback is 15'-1 ", the west side yard adjacent to neighboring property is set
back 5'-0" at the ground level, with the building stepping back on the upper.floors,
and the rear yard has connection to the adjacent alley, with and building is
setback from T-11" from neighboring property. `
4. The proposed building; site, and landscape have all been designed to meet the
design intent outlined in Section 4.8(E) of the Land Use Code.
5. A public plaza connecting the main entry to Both Laurel and Sherwood streets is -
incorporated into the site design. Direct connection to\the public sidewalk along
Sherwood St. from the ground floor living units has been provided
6. Parking requirements will be met by providing parking.on-site, and through long-
term lease agreements from neighboring properties.
7. - Electrical service will be coordinated with Light and Power.
8. Electrical requirements will be coordinated with Light
and Power: New street trees'will be, planted so as_ 'not
to interfere with utilities
9. Refer to'drainage study and civil engineering plans for phone (97o) 207. 1973
all storm run-off calculations. Water quality measures fax(970) 206.0813
` e-mail eastpoint@frii.com
correspondence 3207 Kittery Court
Fort Collins, CO 80526