HomeMy WebLinkAboutTRANSFORT FACILITY EXPANSION - FDP - FDP110003 - CORRESPONDENCE -Department: Technical Services
Contact: Jeff County, 970-221-6588, icountvCa�fcgov.com
Topic: Construction Drawings
Comment Number: 54
Comment Originated: 04/26/2011
04/26/2011: There is still a line over text & text over text issue on sheet C5.0.
Topic: Landscape Plans .
Comment Number: 51
Comment Originated: 04126/2011
04/26/2011: No comments.
Topic: Plat
Comment Number: 47
Comment Originated: 04/26/2011
04/26/2011: The boundary and legal close.
Comment Number: 48
Comment Originated: 04/26/2011
04/26/2011: The boundary and legal do not match. See redlines.
Comment Number: 49
Comment Originated: 04/26/2011
04/26/2011: The bearing in the basis of bearings statement is missing the degrees symbol.
Comment Number: 53
Comment Originated: 04/26/2011
04/26/2011: Please "locate" the 30' waterline easement at the north end of the property.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224.6143, lex(a)fcpov.com
Topic: General
Comment Number: 1 Comment Originated: 04/25/2011
04/25/2011: As a reminder, a site visit with Natural Areas (Rick Bachand) and myself will need
to be coordinated prior to construction to assess the site for prairie dog and potential burrowing
owls. Let's tentatively discuss timeframes on Wednesday.
Department: Light And Power
Contact: Doug Martine, 970.224.6152, dmartine(a)fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 04/08/2011
04/08/2011: No comments.
Department: PFA
Contact: Carie Dann, 970.219.5337, CDANN(a)poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 04/22/2011
04/22/2011: Please refresh my memory. I thought we had agreed upon FIRE LANE NO
PARKING signs instead of NO PARKING BETWEEN SIGNS, as well as no red curb paint for the
emergency access alignment. I apologize if I'm not recalling this correctly ... ?
Department: Stormwater Engineering
Contact: Wes Lamarque, 970.416.2418, wlamaraue(o)fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 04/27/2011
04/27/2011: Please see minor comments on the redlined plans. Most comments are
regarding additional details for drainage or erosion control improvements.
Comment Number: 2 Comment Originated: 04/27/2011
04/27/2011: Please add an erosion control escrow calculation in the drainage report.
Comment Number: 3 Comment Originated: 04/27/2011
04/27/2011: Please add a 4th row (hole) to the water quality outlet structure. See redlines.
Comment Number: 4 Comment Originated: 04127/2011
04/27/2011: Please provide an erosion control plan and the drainage plan in the utility plan set.
Department: Technical Services
Contact: Jeff County, 970.221.6588, jcountvat7.fcaov.com
Topic: Building Elevations
Comment Number: 52
04/26/2011: No comments.
Comment Originated: 04/26/2011
Fort Collins
April 09, 2012
Brian Williamson
Jim Sell Design
153 W Mountain
Fort Collins, CO 80524
RE: Transfort Facility Expansion, FDP110003, Round Number 1
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6760
970,224.6134 - fax
fcgov. com/developmentre view
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Lindsay Ex, 970.224.6143, lex fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 04/27/2011
04/27/2011: After the staff review on April 27, 2011, staff agreed this project is ready to submit
for mylars. The one exception is with regards to Jeff County's comments below - please submit
a .pdf document of the three sheets that have minor issues to him (as opposed to the paper
copies discussed during review) prior to submitting mylars.
Topic: Lighting Plan
Comment Number: 2
Comment Originated: 04127/2011
04/27/2011: There is a condition of approval on this plan to provide a revised lighting plan
"demonstrating that pole -mounted lighting along the edge of the new concerete paved area for
bus operator training complies with Section 3.2.4 of the Land Use Code." The concern from the
neighbors was glare and lighting from the parking area. The revised plan now includes a detail
that shows a full -cutoff lighting structure and meets Section 3.2.4 of the Land Use Code,
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex(o)fcaov.com
Topic: General