Loading...
HomeMy WebLinkAboutTRANSFORT FACILITY EXPANSION - FDP - FDP110003 - CORRESPONDENCE -Department: Technical Services Contact: Jeff County, 970-221-6588, icountvCa�fcgov.com Topic: Construction Drawings Comment Number: 54 Comment Originated: 04/26/2011 04/26/2011: There is still a line over text & text over text issue on sheet C5.0. Topic: Landscape Plans . Comment Number: 51 Comment Originated: 04126/2011 04/26/2011: No comments. Topic: Plat Comment Number: 47 Comment Originated: 04/26/2011 04/26/2011: The boundary and legal close. Comment Number: 48 Comment Originated: 04/26/2011 04/26/2011: The boundary and legal do not match. See redlines. Comment Number: 49 Comment Originated: 04/26/2011 04/26/2011: The bearing in the basis of bearings statement is missing the degrees symbol. Comment Number: 53 Comment Originated: 04/26/2011 04/26/2011: Please "locate" the 30' waterline easement at the north end of the property. Department: Environmental Planning Contact: Lindsay Ex, 970-224.6143, lex(a)fcpov.com Topic: General Comment Number: 1 Comment Originated: 04/25/2011 04/25/2011: As a reminder, a site visit with Natural Areas (Rick Bachand) and myself will need to be coordinated prior to construction to assess the site for prairie dog and potential burrowing owls. Let's tentatively discuss timeframes on Wednesday. Department: Light And Power Contact: Doug Martine, 970.224.6152, dmartine(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/08/2011 04/08/2011: No comments. Department: PFA Contact: Carie Dann, 970.219.5337, CDANN(a)poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 04/22/2011 04/22/2011: Please refresh my memory. I thought we had agreed upon FIRE LANE NO PARKING signs instead of NO PARKING BETWEEN SIGNS, as well as no red curb paint for the emergency access alignment. I apologize if I'm not recalling this correctly ... ? Department: Stormwater Engineering Contact: Wes Lamarque, 970.416.2418, wlamaraue(o)fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/27/2011 04/27/2011: Please see minor comments on the redlined plans. Most comments are regarding additional details for drainage or erosion control improvements. Comment Number: 2 Comment Originated: 04/27/2011 04/27/2011: Please add an erosion control escrow calculation in the drainage report. Comment Number: 3 Comment Originated: 04/27/2011 04/27/2011: Please add a 4th row (hole) to the water quality outlet structure. See redlines. Comment Number: 4 Comment Originated: 04127/2011 04/27/2011: Please provide an erosion control plan and the drainage plan in the utility plan set. Department: Technical Services Contact: Jeff County, 970.221.6588, jcountvat7.fcaov.com Topic: Building Elevations Comment Number: 52 04/26/2011: No comments. Comment Originated: 04/26/2011 Fort Collins April 09, 2012 Brian Williamson Jim Sell Design 153 W Mountain Fort Collins, CO 80524 RE: Transfort Facility Expansion, FDP110003, Round Number 1 Community Development and Neighborhood services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970,224.6134 - fax fcgov. com/developmentre view Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Current Planning Contact: Lindsay Ex, 970.224.6143, lex fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/27/2011 04/27/2011: After the staff review on April 27, 2011, staff agreed this project is ready to submit for mylars. The one exception is with regards to Jeff County's comments below - please submit a .pdf document of the three sheets that have minor issues to him (as opposed to the paper copies discussed during review) prior to submitting mylars. Topic: Lighting Plan Comment Number: 2 Comment Originated: 04127/2011 04/27/2011: There is a condition of approval on this plan to provide a revised lighting plan "demonstrating that pole -mounted lighting along the edge of the new concerete paved area for bus operator training complies with Section 3.2.4 of the Land Use Code." The concern from the neighbors was glare and lighting from the parking area. The revised plan now includes a detail that shows a full -cutoff lighting structure and meets Section 3.2.4 of the Land Use Code, Department: Environmental Planning Contact: Lindsay Ex, 970.224.6143, lex(o)fcaov.com Topic: General