Loading...
HomeMy WebLinkAboutTRANSFORT FACILITY EXPANSION - MJA - 23-10 - CORRESPONDENCE - (5)5. Is the mock station simply raised concrete or is it a type of structure? Please indicate and if it is a structure, please provide some details. 6. On the Lighting Plan, please indicate if the LED Wall Light will be the small or medium. Also, it is not necessary to include data on illuminance levels within the structure. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Sitcea �.✓( Chief Planner Ted Shepard Pa.-e 5 Number: 31 Created: 10/8/2010 [10/8/10] Please provide a drainage alignment for the limits of the detention pond. Number: 32 Created: 10/8/2010 [10/8/10] Please make sure the entire detention pond is located on the parcel once lot lines are finalized. Number: 33 Created: 10/8/2010 [10/8/10] Stormwater is ready for a hearing after the pond is shown to be entirely on the City's parcel. Department: Zoning Issue Contact: Peter Barnes Topic: Zoning Number: 1 Created: 9/23/2010 [9/23/10] The site plan labels the bus addition as a "Bus Canopy". The elevation drawings show the addition to be an enclosed building. I assume the elevation drawings are correct, which means that the site plan needs to remove "canopy" and replace it with "garage" or something similar. Number: 2 Created: 9/23/2010 [9/23/10] The dimensions of the bus garage addition and the wash bay addition need to be shown on the site plan. The north/south dimension of the garage addition is shown, but I don't see the east/west dimension. No dimensions are shown for the wash bay addition. Number: 3 Created: 9/23/2010 [9/23/10] The site plan is cluttered and includes layers that should be removed in order to better understand the vehicular use patterns. Please remove the existing trees that are going to be transplanted, topo lines and any ghosted text. Number: 4 Created: 9/23/2010 [9/23/10] The tables on the site plan should be expanded to list "existing", "new", and "total". Comments from Current Planning: 1. The westerly boundary adjoins the naturalized drainage channel, the northerly boundary adjoins Prairie Dog Meadow and the easterly boundary faces Brittany Knolls. Because of the sensitivity associated with the surrounding land uses, the proposed chain link fence should be vinyl -clad versus galvanized. This will soften the perimeter and complement the new and relocated landscaping. 2. On the site plan, label the surrounding land uses. 3. On the architectural elevations, please provide more detail on the parapet for the proposed building. Will the new parapet match the existing? Will it be of sufficient height to screen the roof top mechanical units? 4. On the elevations, please call out the horizontal reveals as to width, depth and do they match the existing building? Pne 4 Number: 26 Created: 10/6/2010 BOLLARDS Protective bollards must comply with 2006 IFC Section 312 Vehicle Impact Protection. Department: Traffic Operations Issue Contact: Ward Stanford Topic: Traffic Number: 27 Created: 10/6/2010 [10/6/10] The TIS needs to discuss existing/new bus impacts on the traffic at Trilby and College intersection. Number: 28 Created: 10/6/2010 [10/6/10] The TIS needs to provide discussion at the Portner and Trilby intersection of any queuing due to existing/new buses turning from Trilby to Portner or from Portner to Trilby. Department: Technical Services Issue Contact: Jeff County Topic: Landscape Plan Number: 6 Created: 10/5/2010 [10/5/10] There are line -over -text and text -over -text issues o Landscape Plan sheet 1-1.1. Topic: Site Plan Number: 5 Created: 10/5/2010 [10/5/10] Please add a legal description to the Site Plan. Number: 10 Created: 10/5/2010 (10/5/10] The area outlined in "yellow"(see redlines) on the Site Plan, is not platted. Does it need to be platted? Topic: Utility Plan Number: 7 Created: 10/5/2010 [10/5/10] Please correct the benchmark information on sheet C0.0, C0.1, C2.0 & C2.1 of the Utility Plans. Number: 8 Created: 10/5/2010 [10/5/10] There are minor line -over -text issues on sheet C4.0 of the Utility Plans. Number: 9 Created: 10/5/2010 [10/5/10] Please add a legal description to the Utility Plans. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number:29 1 Created:l0/8/2010 [10/8/10] Please label the type of pipe for the existing storm sewer proposed to be underneath the bus shelter. Number: 30 Created: 10/8/2010 [10/8/10] Please provide a note on the Utility plan on how maintenance would be conducted for the existing storm sewer underneath the bus shelter. Page 3 [10/6/10] Please see redlines for additional minor comments. Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 23 Created: 10/6/2010 REQUIRED ACCESS Fire access roads (fire lanes) shall be provided for every building constructed within the PFA's jurisdiction when any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: ❑ Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites. a Have appropriate maintenance agreements that are legally binding and enforceable. ❑ Be designated on the plat as an Emergency Access Easement. Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structure is three or more stories in height). If the building is equipped throughout with an approved automatic fire -sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. PLEASE NOTE: PFA will require an Emergency Access Alignment (as opposed to an "easement" since the property is City -owned) through an approved location on the site. Please contact me to discuss. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D Number: 24 Created: 10/6/2010 AUTOMATIC FIRE -SPRINKLER REQUIREMENTS Proposed structures may be required to be equipped with approved automatic fire -sprinkler systems, depending on occupancy type, construction type, building size, emergency -vehicle access, water supply issues and other factors. Fire sprinkler system is required for the structure and addition. 2006 International Fire Code New Table 903.1 and Section 702 Number: 25 Created: 10/6/2010 WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements are 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. PLEASE NOTE: The site currently has three hydrants in the area. Can you show all locations on plans so I can determine if we need an additional hydrant? 2006 International Fire Code 508.1 and Appendix B Page 2 AMP. STAFF PROJECT REVIEW City of Fort Collins Jim Sell Design Date: 10/11/2010 Brian Williamson 153 W Mountain Ave Fort Collins, CO 80524 Staff has reviewed your submittal for TRANSFORT FACILITY EXPANSION MAJOR AMENDMENT PDP-TYPE II, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Andrew Carney Topic: Utility Plan Number: 11 Created: 10/5/2010 [10/5/10] The utility plan set needs to contain a utility sheet. Number: 12 Created: 10/5/2010 [10/5/10] Add #48 to the general construction notes. See redlines. Number: 13 Created: 10/5/2010 [10/5/10] The utility plan set needs to show the entire site, as well as, off site conditions at least 50 feet off site including grading, driveways, sidewalks, and other major features. Number: 14 Created: 10/5/2010 [10/5/10] Add checklist item II. E. to the grading sheet. See redlines. Number: 15 Created: 10/5/2010 [10/5/10] Finish grade elevations are needed for lot corners, and finish floors/top of foundation of buildings and lots. See checklist item 11. D. Number: 16 Created: 10/5/2010 [10/5/10] The utility set did not contain a utility sheet so I was not able to review any utility sheet items. Once submitted a review of the utility sheet may result in additional comments. Number: 17 Created: 10/5/2010 [10/5/10] Are there any proposed emergency access easements? If so, as with other city properties, they will need to be "alignments" not easements. Number: 18 Created: 10/5/2010 [10/5/10] On the NW comer of the site, off site grading is proposed which will require a off - site easement as well as a letter of intent prior to hearing. Number: 20 Created: 10/5/2010 [10/5/10] Please show the existing sidewalks on the site, landscape, and utility plans. Number: 21 Created: 10/5/2010 (10/5/10] According to the current platted lot lines, almost all of the proposed improvements are happening off -site. Is a off -site easement/agreement proposed? A replat is encouraged. Number: 22 Created: 10/6/2010 Page 1