Loading...
HomeMy WebLinkAboutTRANSFORT FACILITY EXPANSION - MJA - 23-10 - ADMIN HEARING PACKET - RECOMMENDATION/REPORTB. The expansion complies with the applicable criteria of the Article Three General Development Standards. C. The expansion complies with the applicable criteria of Article Four Employment Zone standards. D. The expansion is compatible with the surrounding neighborhood. RECOMMENDATION: Staff recommends approval of Transfort Facility Replat and Expansion, #23-10. The Transfort Expansion includes a new, enclosed 600 square foot chassis wash that is located on the south side of the existing building attached to the existing wash facility. It is 265 feet from the rear property lines of the closest homes in Brittany Knolls. Also a new compressed natural gas fueling operation will be provided and it is located in the southwest corner of the site at the existing station and the lines will run underground to the expansion area. Therefore, noise from the compressors will be mitigated. J. Section 3.6.4 — Transportation Level of Service Requirements A Transportation Impact Study (T.I.S.) was performed in March of 2010. Transfort estimates that three new employees will be added as a result of the expansion. The T.I.S. also describes an existing deficiency at the College Avenue / Trilby Road intersection that causes excessive delays. The length of the westbound Trilby Road left turn lane is short due to the existing driveways associated with the 7-Eleven convenience store at the southeast quadrant of the intersection. The combination of this short left turn lane and high volume of westbound left turns blocks the westbound through / right -turning traffic. Also the lack of eastbound and westbound right -turn lanes and small corner radii at the northeast and southwest corners holds the right -turning movements until the east -west traffic has a green light. The T.I.S. indicates that in the morning, buses leave between 5:30 and 6:30 a.m. and return in the evening between 6:45 and 7:45 p.m. and do not return in the middle of day. Therefore, since these are off-peak times, the buses do not significantly impact the inefficiencies at the College Avenue / Trilby Road intersection. 5. Citizen Participation: Two neighborhood information meetings were held —April 14, 2010 and May 24, 2010. Summaries of these meetings are provided. As mentioned, significant revisions were made to the plan as result of citizen input. 6. Findings of Fact / Conclusion: In evaluating the request for Transfort Facility Replat and Expansion, Staff makes the following findings of fact: A. The expansion is in conformance with the approved Overall Development Plan. 6 Prairie Dog Meadow Natural Area borders the north edge of the project. There is a small wetland (.25 acre) associated with the drainage channel. The study finds: • There are no natural drainages in the area. • There is no suitable habitat for Preble's meadow jumping mouse, Ute ladies -tresses orchid, or Colorado butterfly plant. • The naturalized drainage channel does not represent a wildlife movement corridor since the south end of the channel provides no connection to any natural or undeveloped areas. • The only special habitat feature is the wetlands and naturalized drainage channel which are under one-third of an acre requiring a buffer of 50 feet. A 50-foot buffer, as demarcated by the limits of disturbance line on the site plan, has been established which complies with the buffer standard. F. Section 3.4.3 — Water Quality Water quality of the stormwater runoff is provided by an extended detention basin. The capture volume is based off of the required 40-hour drain time. G. Section 3.5.1— Building and Project Compatibility The new building will be attached to the north wall of the existing building. Both the addition and existing building feature common exterior materials and color consisting of pre -cast concrete panels treated with exposed aggregate texture and painted brown. There will be horizontal reveals and a parapet wall to match the existing building. The design of this building was revised after input from the adjoining neighborhood. Base on this input, the building was reduced in height to 22 feet and a pitched roof was revised to a flat roof thus lowering the profile. H. Section 3.5.1(H) —Land Use Transition The Transfort Facility and the neighborhood to the east, Brittany Knolls, are dissimilar land uses. Transition is provided by a combination of distance, landscaping, earthen berms, fencing, building placement and building design. These attributes were carefully scrutinized at the two neighborhood information meetings and contribute to the Transfort Expansion complying with this standard. Section 3.5.1(J) — Operational /Physical Compatibility Standards R 4. Compliance with Applicable General Development Standards: A. Section 3.2.1 — Landscaping and Tree Protection Significant new plant material will be placed along the eastern edge of the site. For example, there will be a row of new evergreen trees placed within the perimeter security fence. Between the security fence and Brittany Knolls, there is 115 feet of buffer that will feature drought -tolerant ground cover and transplanted trees. The existing berms will be re -contoured to provide effective screening. There is a grove of existing trees in the location of the new building. These trees will be removed. As part of the compliance with tree protection standards, there will be a combination of transplanting and mitigation. The tree protection plan has been reviewed by the City Forester and found to be acceptable. B. Section 3.2.2 — Access Circulation and Parking Circulation has been designed as a one-way loop with pull -through parking so there is minimal backing maneuvers. The general area is purposely intended to serve the bus fleet and be secured for employees only so there are no connecting walkways or bike paths through the site. The setback of the vehicular use area significantly exceeds the required 10 feet from Portner Road. There is sufficient existing parking for the anticipated number of new employees associated with servicing the Mason Corridor. C. Section 3.2.4 — Site Lighting There will be seven new wall -mounted light fixtures on the new building. Two of these will face east. All will feature sharp cut-off and down directional luminaries. With the substantial setback, there will be no light spillage across the property line. D. Section 3.3.1— Plat Standards The plat contains 13.77 acres and includes both replatting existing land and including new land. There is street frontage along two public streets, Trilby Road and Portner Road. Proper land dedications for Trilby Road (arterial) and Portner Road (collector) have been made. In addition, proper dedications have been made for utility and drainage easements as well as emergency access. E. Section 3.4.1(E) — Natural Habitats and Features An Ecological Characterization Study was prepared to establish the buffer and limits for disturbance between the developed portion of the site and the existing naturalized drainage channel and detention pond. The channel and pond are located along the west and north of the improvements. In addition, the City's 4 3. Compliance with Applicable Employment Zone Standards: A. Section 4.27(B)(1)(b) — Site Specific Development Plan As mentioned, Transfort was approved as a P.U.D. in 1982 well before the adoption of the Land Use Code in 1997. In 1997, the parcel was zoned E, Employment, and the use was defined as a "Public Facility" which was a permitted use in the E zone up until 2009. In 2009, the term "Public Facility" was eliminated and re -defined into two new uses — "Minor Public Facility" and "Major Public Facility" in order to distinguish between small, unmanned facilities versus large facilities with full-time staff. Transfort meets the definition of a "Major Public Facility." Major and Minor Public Facilities were then re -assigned to various zone districts as permitted uses. For example, prior to 2009, "Public Facilities" were allowed in 24 zones. With the code revision in 2009, "Major Public Facilities were restricted to four zones (C, C-L and 1) but not the Employment zone The governing P.U.D. constitutes a "Site Specific Development Plan" in accordance with Section 4.27(B)(1)(b). Therefore, the Transfort Facility, is a permitted use with the ability to expand subject to the applicable standards of Article Three and Four. B. Section 4.27(E)(1)(b) — Site Design This standard states that where an employment or industrial use abuts a residential area, there shall be no drastic and abrupt change in the scale and height of buildings. The Brittany Knolls subdivision is located east of the subject site. There is approximately 245 feet that separate the new Transfort building with the rear property lines of the closest homes. The following features have been incorporated in response to citizen input to provide a transition between the Transfort building and Brittany Knolls: • The building has been shifted south to become an addition to the existing building versus a free-standing building. • The height of the new building has been lowered and the roof was changed from pitched to flat. • Additional landscape material has been added between Transfort and the houses and transplanted trees will be placed in the buffer yard as well. • Perimeter security fencing has been upgraded from galvanized to vinyl - clad chain link. 3 COMMENTS: 1. Background: The surrounding zoning and land uses are as follows N: P-O-L; City of Fort Collins Natural Area, Prairie Dog Meadow S: L-M-N; Residential, Provincetown and Mobile Home Park E: R-L; Residential, Brittany Knolls NW: E; Poudre School District Satellite Bus Facility W; E; City of Fort Collins Utilities Electrical Transmission Substation The site is part of the Southside Service Center Overall Development Plan (O.D.P.) The following actions have been approved within this O.D.P.: • The O.D.P. was originally approved in 1982 comprising 60 acres. • The City of Fort Collins Transfort Bus Facility P.U.D. was approved in 1982. • The O.D.P. was amended and a Site Plan Advisory Review approved to create the Poudre School District "Satellite Bus Maintenance Facility and South Bus Terminal' in 1992. • The O.D.P. was amended to create a 29-acre natural area, a 4.64 parcel for future development and a 2.2 acre parcel for Transfort expansion in 1995. • The PSD Bus Facility was modified to add a bus enclosure as an Amended Site Plan Advisory Review in 1996. • In March of 1997, the property was rezoned from R-L-P (with P.U.D. condition) to E, Employment as part of the city-wide implementation of City Plan. • In July of 2001, the PSD Bus Facility was expanded to add a 2,700 square foot building for offices and conference space and a new, 3,000 square foot, detached, two -bay bus repair building for minor maintenance. 2. Overall Development Plan: The area of the new garage and bus training course is designated on the O.D.P. as 'Transfort Expansion, Parcel D." The Major Amendment, therefore, complies with the O.D.P. z of F Collins I I c'M NO MEETING DATE Pe.6eutgA. 9, aoll STAFF Tx',o s,#,r Ao HEARING OFFICER PROJECT: Transfort Facility Expansion, Replat and Expansion of a Site Specific Development Plan, #23-10 APPLICANTS: City of Fort Collins c/o Department of Transportation 6570 Portner Road Fort Collins, CO 80525 OWNERS: Same PROJECT DESCRIPTION: This is a request to replat and expand the existing Transfort Facility by adding a new 16,240 square foot bus enclosure to protect the new bus fleet from weather. Also, the existing bus wash facility will be enlarged by 600 square feet to accommodate newer larger buses. The location of the proposed bus storage building will directly adjoin the existing building along the north wall as a building addition. A new concrete paved area will be added for bus operators to practice maneuvering the new articulated buses that will be used along the Mason Corridor. The site is 13.77 acres and located at the northeast corner of Trilby Road and Portner Road. The zoning is E, Employment. RECOMMENDATION: Approval EXECUTIVE SUMMARY: The new enclosure will store up to 24 buses. The replat and expansion of the Transfort Facility (Site Specific Development Plan) comply with the Overall Development Plan and the applicable standards of Articles Three and Four. Two neighborhood meetings were held and the plan was revised to further provide compatibility with Brittany Knolls, the adjacent subdivision. Current Planning 281 N College Ave - PO Box 580 - Fort Collins, CO 80522-0580 fcgov.com/currentplanning 970.221.6750