Loading...
HomeMy WebLinkAboutLIBERTY COMMON HIGH SCHOOL EXPANSION - SPAR - SPA110003 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (3)PDP.Submittal Suggested items for the Sketch Plan: Property location and boundaries, surrounding land uses, proposed use(s), eAsting and proposed improvements (buildings, landscaping, parking/drive areas, water treatment/detention, drainage), edsbng natural features (water bodies, wetlands, large trees, wildlife, canals, irrigation ditches), utility line locations (if knownThings to consider when making a proposal: How does the site drain now? Will it change? Questions of Staff for more clarity. i. Explain the process we will go through for approval for a Charter School_ ii. Building plan and initial review iii. Detention pond modification and relocation of bike path iv. Parking requirements v. What detail and utility info required for Phase 2 vi. What is length of time that approved plan can be open? 3 years? Is that enough time to complete phase 2? Revised October 23, 2009 2 PDP Submittal Requirements Whfi v: GIS wen NUe gAeepmtlee pope I A ❑ep:npe.hemmm/fan.amRwv.wxaunl�aav�9:0emmt�.ve �P I :o 11 roft Collins GIS Liberty Commons High School 1 inch = 600 feet 2745 Minnesota Drive N A r &.145 Minnesota Drive Liberty Commons High School /e-;5rC� . Aerial Site Map Liberty Common Nigh m Y Fort Collins IsS V f `Q( M! OC Q'd Des Moines Or n 1 inch = 300 feet w City Of I I c Development Review Guide - STEP 2 of 8 Fort Collins CONCEPTUAL REVIEW: APPLICATION General Information All proposed development projects begin with Conceptual Review. At this early stage, the development idea does not need to be finalized or professionally presented. However, a site plan and this application must be submitted to City Staff nine (9) days prior to the Conceptual Review meeting. Please be aware that any information submitted may be considered a public record, available for review by anyone who requests it, including the media. As a free service, Conceptual Reviews are only scheduled on three Monday mornings per month at 9:30 a m., 10:15 a.m. or 11:00 a.m. on a first come, first served basis. One 45 minute meeting is allocated per applicant. Complete applications and sketch plans must be submitted to City Staff no later than 5 pm, two Tuesdays prior to the meeting date. Application materials can be dropped off in person to 281 N College Avenue or e-mailed to Courtney Rippy at cnppvrafcgov.com. Once your site plan and application are in, you are eligible to tie &fiedoled for a conceptual review and your date and time will be confirmed via e-mail. Digital copies are encouraged. At Conceptual Review, you will meet with Staff from a number of City departments such as: Zoning, Planning, Engineering, Light/Power, Stonnwater, Water/Waste Water, Historic Preservation and Poudre Fire Authority. There is no approval or denial of development proposals associated with Conceptual Review. At the meeting you will be presented with a letter from staff, summarizing comments on your proposal. "BOLDED ITEMS ARE REQUIRED" 1. Contact Name(s) and Role(s) (Please identify whether Consultant or Owner, etc) Michael Chalona, Owner Representative 2. Business/Project Name The Neenan Company / Liberty Commons High School Addition 3. Mailing Address 2620 E Prospect Ave, Suite 100, Fort Collins, CO 4. Phone Number 970.416.7267 5. Email Address 2620 E Prospect Ave, Suite 100, Fort Collin 6. Site Address (parcel # if no address) 2745 Minnesota Drive, Fort Collins, CO michael.chalona@neenan.com �2 3 s, co 0/VCT-2 chart,tx JYrddc. /6D6-ru �r►,crt s- S P rt 4 7. Major Cross Streets: North South Custer East Minnesota West 8. Description of Proposal 2 story addition to existing charter school, including engineering lab, gymnasium and classrooms; small play field area; and the addition of small parking lot. Broken into 2 main phases and 3 sub phases for phase 2. Existing building is 26,333 Sf and proposed is 28,838 SF = 55,171 SF. 9. Proposed Use Charter School 10. Existing Use Charter School 11. Zone District MMN Zone District info available on the FC Maps website at http7//gis.fcgov com/fcmaps/fcmap.aspx Click Zoning Districts tab on left and zoom to property. 12. Total Building Square Footage55175 (ex+propn3. Total Site Square Footage 18,9937 SF ly..2 a itC 14. Number of Stories Two 151ot Dimensions 691' E x 539- P1 x 504' W x 720' S 16. Age of any Existing Structures —14 17. Date Existing Structures Built /M M N Info available on Larimer County's Website: http://www.co.larimer.co.us/assessor/query/search.cfm If any structures are 50+ years old, good quality, color photos of all sides of the structure are required. 18. Is your property in a Flood Plain? ❑ Yes X No If yes, then at what risk is it? Info available on FC Maps: http://gis.fcgov.com/fcmcps/fcmap.asr) Click Floodplains tab and zoom to property. 19. Increase in Impervious Area— 39500 S.F. (Approximate amount of additional building, pavement, or etc, that will cover existing bare ground to be added to the site) Community Development & Neighborhood Services — 281 N College Ave — Fort Collins, CO 80522-0580