November 27, 2012
Mr. Ted Shepard, Planner
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80525
RE: PDP120029 Fort Collins LDS Temple
PDP — Type II
Dear Mr. Shepard,
0 SOUTH FORT COLLINS SANITATION DISTRICT
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed
the above mentioned project and submit the following comment.
The District will require easements on the District's standard easement form, for all facilities that
are not located within the public ROW. The District requires minimum 30 foot and 20 foot wide
easements for the sanitary sewer lines and water lines, respectively.
The District does not allow trees, tree canopies or landscaping within the District's easement or
within 10 feet of District facilities.
The District requires a Reduced Principle Back -Flow -Prevention -Device with on the riser of the
fire line needs to be added.
An 8 inch water line was stubbed to the existing fire hydrant along the north property line for a
future extension. The fire hydrant will need to the re -installed to the end of the 8 inch water line.
The District will provide additional comments when the construction drawings are submitted for
review.
Please do not hesitate to contact me at 226-3104, ext. 104, if you have any questions or require additional
information.
Respectfully,
Mr. rry W. Farrill, P.E.
District Engineer
xc: Mr. Michael D. DiTullio, District Manager
Ken Merritt, Landmark Engineering, LTD
5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeals(a)fcgov.com
Topic: General
Comment Number: 8 Comment Originated: 11/26/2012
11/26/2012: The Landscape plan indicates some work to be done outside the recently
annexed area. The city can not permit this work at this time please contact the county for any
work that will need permits.
Comment Number: 9 Comment Originated: 11/26/2012
11/26/2012: Fencing height is limited to 4ft between the front property line and front of building.
Assuming that the front property line is Along Majestic the fencing between the front of the
building and the property line is required to be 4ft in height.
LUC 3.8.11(C)(2) This section allows to deviate from the 4ft height limit if the there is a
demonstrated unique security purpose.
The other option is to request a modification to LUC 3.8.11(C)(1)
(Proposed Development Plan)
Department: Water -Wastewater Engineering
Contact: Terry Farrill, ,
Topic: General
Comment Number: 4 Comment Originated: 11/27/2012
11/27/2012: An 8 inch water line was stubbed to the existing fire hydrant along the north
property line for a future extension. The fire hydrant will need to be re -installed to the end of the
8 inch water line.
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeals@fcpov.com
Topic: General
Comment Number: 1
Comment Originated: 11/26/2012
11/21/2012: Signs and their locations are not approved in the PDP/FP. Signs and their
locations are permitted through a separate sign permit once the project has been recorded. If
the applicant wants to keep the sign locations on the plans for reference a note should be
included that it will be permitted through separate sign permit. (Proposed Development Plan)
Comment Number: 2 Comment Originated: 11/26/2012
11/21/2012: Please label the dimensions of the trash and recycling enclosure on the plans and
the distance it is from the public sidewalk. (Final Plan)
Comment Number: 3
Comment Originated: 11/2612012
11/2112012: The Single Family dwelling does not meet the garage standards in which the
garage doors are to be recessed behind the house at least 4ft facing the public street.
(Proposed Development Plan)
Also the house would associate better with future neighborhood if the front entrance was
oriented to the street. The driveway can still take access off the private drive.
Comment Number: 4 Comment Originated: 11/26/2012
11/21/2012: The accessibility parking spaces require to be signed. (Final Plan)
Comment Number: 6 Comment Originated: 11/26/2012
11/26/2012: The proposed lighting plan indicated less than the required minimum of 1
foot-candle in some of the parking areas. Please review plan and adjust plans accordingly.
(Final Plan)
Also the uplighting on the Statue is not allowed. To deviate from this standard there are two
ways to make the request 1.) is through the alternative compliance found in section 3.2.4(E) or
2.) through a modification to the standard. (Proposed Development Plan)
Comment Number: 7 Comment Originated: 11/26/2012
11/26/2012: In the LIE zone the minimum lot size is 1/2 an acre. Lot 1 of Block 2 is less then
the 1/2 acre minimum. This lot will need to meet the 1/2 standard or request a modification at
this time for the reduce lot size. (Proposed Development Plan)
Also this lot should include a building envelope on the site plan. (Final Plan)
Department: Traffic Operation
Contact: Ward Stanford, 970.221.6820, wstanfordna.fcgov.com
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 11/29/2012
11/2912012: An east bound right (EbR) turn lane and a SbR turn lane was utlized in the short
and long term analysis, but the EbR does not exist and as far as I know none is planned to be
built with this project. The SbR is planned to be built with this project. The inclusion of the EbR
altered the results but the only significantly affected movement is the Eb left turn in the Friday
PM drops to LOS E, both in the ST background and the ST Total. Please revise the Friday PM
analysis without the EbR turn lane to verify the movement will still meet LOS standards without
causing other movements to fail.
Comment Number: 2
Comment Originated: 11/29/2012
11/29/2012: The TIS states a discussion was held regarding similar locations only produced
approximately 60% of the traffic the use could generate at 100% capacity. I'm unable to recall or
find notes about the discussion, nor is it noted on Attachment A. I would like to discuss this
item with the Consulting TE.
Department: Transportation Planning
Contact: Aaron Iverson, 970.416.2643, aiverson(&fcgov.com
Topic: Variance Request
Comment Number: 1
Comment Originated: 12/03/2012
12/03/2012: As proposed, the project does not meet LCUASS 16.6.4 pedestrian refuge for
South Timberline Road at Trilby Road and Timberline Road at Majestic. Two LCUASS variance
request will need to be submitted with the next round of review and will be evaluated at that
time.
Department: Water -Wastewater Engineering
Contact: Terry Farrill, ,
Topic: General
Comment Number: 1
Comment Originated: 11/27/2012
11/27/2012: Terry Farrill, District Engineer, with The Fort Collins -Loveland Water District and the
South Fort Collins Sanitation District reviewed the LDS Temple project and have the following
comments. Please contact Terry at 226-3104 ext. 104 with questions.
Comment Number: 2 Comment Originated: 11/27/2012
11/27/2012: The District will require easements on the Districts standard easement form, for all
facilities that are not located within the public R.O.W. The District requires minimum 30 foot and
20 foot wide easements for the sanitary sewer lines and water lines, respectively.
Comment Number: 3 Comment Originated: 11/27/2012
11/27/2012: The District requires a Reduced Principle Back -Flow -Prevention Device with on
the riser of the fire lines needs to be added.
Department: Traffic Operation
Contact: Ward Stanford, 970-221.6820, wstanford@fcgov.com
Topic: Construction Drawings
Comment Number: 9 Comment Originated: 11/2912012
11/2912012: S&S Plans C11: Please remove the back-to-back arrows in the TWLTL on
Timberline at the south side of the Majectic intersection (near CL STA 109+00) and the north
side of the Rock Castle intersection (near CL STA 113+00). Maintain the ones shown at CL STA
111+00.
Comment Number: 10 Comment Originated: 11/29/2012
11/29/2012: S&S Plans C10: Please label the new R1-1 with street name sign at the outbound
lane on E. Majestic at Timberline.
Comment Number: 11 Comment Originated: 11/29/2012
11/29/2012: S&S Plans C10: Please add/label new R1-1 signs at the exits from parking areas
on to Majestic.
Comment Number: 12
Comment Originated: 11/29/2012
11/29/2012: S&S Plans: Please include a signing/striping plan for the intersection of Trilby and
Majestic providing R1-1 with street name signage and a stop bar.
Comment Number: 13
Comment Originated: 11/29/2012
11/29/2012: S&S Plans: Please remove the stop bar on the approaches at Timberline and
Trilby where crosswalks exist or will be added. Typically we don't include stop bars at
signalized intersections
Comment Number: 14 Comment Originated: 11/29/2012
11/29/2012: S&S Plans: Reflect the above S&S comments on the Ultimate S&S plans also.
Topic: General
Comment Number: 5
Comment Originated: 11/29/2012
11/29/2012: Project will need to plan a minimum of 12 weeks in advance for ordering the new
traffic signal pole at the NW corner of Timberline and Trilby. Sixteen weeks has been required
on recent orders. Contact Traffic Operations for the signal changes and the specifications of the
products being changed/new.
Topic: Landscape Plans
Comment Number: 3
Comment Originated: 11/29/2012
11/29/2012: Trees and other plantings in sight distance easements must maintain a minimum
30" clear visual window, measured from the street flowline. Also the trees along the north side
of E. Majestic should be verified to not be creating a picket fence effectively blocking sight of
west bound commuters and south bound commuters entering Majestic from the parking lot
access points. See LCUASS section 7.4.1.C. 5 thru 7.
Comment Number: 4
Comment Originated: 11/29/2012
11/29/2012: Please verify sight distance north and south at the E. Majestic and Timberline
intersection. With the quantity and spacing of tree planting shown on the plans Traffic has
concerns with sight distance at Timberline and Majestic between high speed vehicles on
Timberline and vehicles exiting from E. Majestic.
Topic: Traffic Impact Study
Department: Technical Services
Contact: Jeff County, 970.221.6588, Icounty(a)fcgov.com
Topic: Plat
Comment Number: 31 Comment Originated: 11/28/2012
11/28/2012: Please show a detail for the area at the southeast corner of Trilby Road & Majestic
Drive.
Comment Number: 32 Comment Originated: 11/28/2012
11/28/2012: Please change the seconds on curve C3 to 28". Both the Amended Plat of Lots 1
-4 of the Leistikow M.R.D. S-21-92 and the Leistikow Annexation show this as 28".
Comment Number: 33 Comment Originated: 11/28/2012
11/28/2012: The boundary and legal description close.
Topic: Site Plan
Comment Number: 1 Comment Originated: 11/28/2012
110/2012: Please remove the "Being a Project Development Plan fo approximately 15.7, Ac
of the Leistikow Annexation". This is a development plan for the property being platted as Fort
Collins LDS Temple.
Comment Number: 2 Comment Originated: 11/28/2012
11/28/2012: Please add a legal description for the property to sheet SPA.
Comment Number: 3
Comment Originated:
11/28/2012
11/28/2012: There are line over text issues on sheets SP.2, SP.3 & SP.5.
Comment Number: 4
Comment Originated:
11/28/2012
11/28/2012: Please correct the sheet numbering on sheet SPA.
Comment Number: 5
Comment Originated:
11/28/2012
11/28/2012: There are text over text issues on sheet SP.5.
Comment Number: 6
Comment Originated:
11/28/2012
11/28/2012: There is text that is doubled over itself on sheet SP.5.
Department: Traffic Operation
Contact: Ward Stanford, 970.221.6820, wstanford(rDfcgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 11/29/2012
11/29/2012: S&S plans C10: please remove the dotted/dashed lines at the opening of the turn
bays (lefts/rights, TWLTL), except where a right turn lane moves right of a bike lane.
Comment Number: 7 Comment Originated: 11/29/2012
11/29/2012: S&S Plans C10: Please remove the ONLY in the short South bound left turn (SbL)
lane on Timberline at Trilby.
Comment Number: 8 Comment Originated: 11/29/2012
11/29/2012: S&S Plans C10: Please add an R4-4 sign at STA 103+16.05 (start of the SbR turn
lane taper at Timberline and Majestic), and at STA 105+64.04 (start of NbR turn lane at
Timberline and Trilby), and at STA 92+40.75 (start of SbR turn lane at Timberline and Trilby).
Department: Technical Services
Contact: Jeff County, 970.221.6588, icountv(@fcgov.com
Topic: Lighting Plan
Comment Number: 12
11/2812012: There are line over text issues on sheets EA & E.2.
Comment Number: 13
11/28/2012: Please add a scale & scale bar to sheets EA & E.2.
Comment Number: 14
11/28/2012: The text on sheet EA is too small, please increase the size.
Comment Originated: 11/28/2012
Comment Originated: 11/28/2012
Comment Originated: 11/28/2012
Comment Number: 15 Comment Originated: 11/28/2012
11/28/2012: The sheet titles on sheets EA & E.5 do not match the sheet index on sheet SPA.
Topic: Plat
Comment Number: 20 Comment Originated: 11/28/2012
11/28/2012: Please add "Replat of Lot 2 of the Amended Plat of Lots 1 -4 of the Leistikow
M.R.D. S-21-92, and being a" to the sub -title.
Comment Number: 21 Comment Originated: 11/28/2012
11/28/2012: Please correct the legal description, and increase the text size.
Comment Number: 22 Comment Originated: 11128/2012
11/28/2012: Please add a blank & title to the Owners signature block.
Comment Number: 23 Comment Originated: 11/28/2012
11/28/2012: Are there any lienholders? If so, please add the Lienholders signature block.
Comment Number: 24 Comment Originated: 11/2812012
11/28/2012: Please add the Sight Distance Easement language.
Comment Number: 25 Comment Originated: 11/28/2012
11/28/2012: Please add "as shown on the Amended Plat of Lots 1 -4 of the Leistikow M.R.D.
S-21-92," to the Basis Of Bearings statement.
Comment Number: 26 Comment Originated: 11/28/2012
11/28/2012: Please show all right of way widths, and how the rights of way were dedicated.
Comment Number: 27 Comment Originated: 11/28/2012
11/28/2012: Please move around the bearings & distances along Timberline Road.
Comment Number: 28 Comment Originated: 11/28/2012
11/28/2012: Please add the distances along Timberline Road as indicated.
Comment'Number: 29 Comment Originated: 11/28/2012
11128/2012: Are Outlots A & B intended to be easements?
Comment Number: 30 Comment Originated: 11/28/2012
11/28/2012: The easements shown on sheet 2 for vacation can only be vacated with an
acknowledgement from the easement holder/ditch owners(shown here and signed by the ditch
owners).
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416.2418, wlamargue(.fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 11/28/2012
11/28/2012: The increase of flow from the widening of the east side of Timberline Road needs
to be analyzed downstream. The increase is minor, but capacity downstream needs to be
shown. The conveyance for these flows also needs to be.shown stable and not result in
additional erosion.
Department: Technical Services
Contact: Jeff County, 970.221-6588, icounty(rDfcgov.com
Topic: Building Elevations
Comment Number: 11 Comment Originated: 11/28/2012
11128/2012: The sheet titles on sheets A.1 - AA do not match the sheet index on sheet SPA.
Topic: Construction Drawings
Comment Number: 16
Comment Originated: 11/28/2012
11/28/2012: The description on benchmark 9-02 does not match the City's Vertical Control
Network. There is a typo in the description of benchmark 10-96, and the elevation has changed
to 4915.12.
Comment Number: 17 Comment Originated: 11/28/2012
11/28/2012: Is the Larimer County Engineering signature block needed, since this is annexed
into the City of Fort Collins?
Comment Number: 18 Comment Originated: 11/28/2012
11/28/2012: There are line over text issues on sheets C.2, C.3, C.9 & C.17.
Comment Number: 19 Comment Originated: 11/28/2012
11/28/2012: Please darken or mask the lighter text on sheets C.12 - C.14.
Topic: Landscape Plans
Comment Number: 7
Comment Originated: 11/28/2012
11/28/2012: There are line over text issues on sheets LS.1, LS.2, LP.1 - LP.7.
Comment Number: 8 Comment Originated: 11/28/2012
11/28/2012: There is text that is too small on sheets LS.2 & LP.1 - LP6. Please increase the
size.
Comment Number: 9
Comment Originated: 11/28/2012
11/28/2012: The sheet numbering in the key map and the matchlines does not match the actual
sheet numbers on sheets LPA - LP.6.
Comment Number: 10
Comment Originated: 11/28/2012
11/28/2012: Please remove the boundary inform ation (bearings & distances) and any other
information not important to these sheets.
Topic: Lighting Plan
Department: PFA
Contact: Jim Lynxwiler, 970.416-2869, jlvnxwilenJ@poudre-fire.org
Topic: General
Comment Number: 06 Comment Originated: 11/27/2012
11/27/2012: SECURITY GATES
The installation of security gates across fire apparatus access roads, trails, or other
accessways, shall be approved by the fire chief. When security gates are installed, they shall
have an approved means of emergency operation. The security gates and the emergency
operation shall be maintained operational at all times. Further discussion with the fire
department on this issue is required.
2006 International Fire Code 503.6
Comment Number: 07 Comment Originated: 11/27/2012
11127/2012: KEY BOXES REQUIRED
Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in approved
location(s) on every new building equipped with a required fire sprinkler or fire alarm system.
The top shall not be higher than 6 feet above finished floor.
2006 International Fire Code 506.1 and Poudre Fire Authority Bureau Policy 88-20
Comment Number: 08 Comment Originated: 11/27/2012
11/27/2012: PREMISE IDENTIFICATION
New and existing buildings shall be plainly identified. Address numbers shall be visible from
the street fronting the property, plainly visible, and posted with a minimum of six-inch numerals
on a contrasting background.
2006 International Fire Code 505.1
Comment Number: 10 Comment Originated: 11/29/2012
11/29/2012: Emergency access easement on south side of temple to include the turn around
@ passenger drop off. The emergency access on the north side of the temple is under review.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970.416-2418, wlamargue(&fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/28/2012
11/28/2012: The drainage design meets the necessary requirements for a PDP submittal
except for the following items which need to be addressed before a public hearing.
Comment Number: 2 Comment Originated: 11/28/2012
11/28/2012: If any off -site drainage easements are needed, letter of intents are required before
a public hearing.
Comment Number: 3
Comment Originated: 11/28/2012
11/28/2012: The release rate for the detention pond located at the southwest corner of the
project is high compared to similar scenarios. The calculations were also hard to follow and
not based on historic basins. This will need to be reviewed.
Department: PFA
Contact: Jim Lynxwiler, 970.416.2869, Ilynxwiler(a)poudre-fire.org
Topic: General
Comment Number: 02 Comment Originated: 11/27/2012
11/27/2012: FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to the design
criteria already contained in relevant standards and policies, any new fire lane must meet the
following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width* & 14 foot minimum overhead
clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons.
> Be visible by painting and signage, and maintained unobstructed at all times.
> Have appropriate maintenance agreements that are legally binding and enforceable.
*NOTE: For structures three stories or more in height; required fire lanes shall be 30 foot wide
minimum on at least one long side of the building.
2006 International Fire Code 503.2.3, 503.3, 503.4 and Appendix D
Comment Number: 03 Comment Originated: 11/27/2012
11/27/2012: TURNING RADII
The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside
and 50 feet outside.
International Fire Code 503.2.4 and Local Amendments
Verify this has been achieved at turn around at passenger drop off on south side of temple and
show this in the drawings.
Comment Number: 04
11/27/2012: FIRE LANE PROXIMITY
Comment Originated: 11/27/2012
Buildings or portions of buildings exceeding 30 foot in height above the lowest level of fire
department vehicle access shall be provided with approved fire apparatus access roads
capable of accommodating fire department aerial apparatus. Overhead utility and power lines
shall not be located within the aerial fire apparatus access roadway. Fire lanes shall have a
minimum unobstructed with of 30 feet and shall be positioned parallel to one entire side of the
building. Fire lanes shall be located within a minimum of 15 feet and a maximum of 30 feet from
the building. 2006 International Fire Code Appendix D
Comment Number: 05
Comment Originated: 11/27/2012
11/27/2012: FDC
Fire Department Connections shall be installed in accordance with NFPA standards. The
location of the FDC shall be discussed and approved by the fire department.
2006 International Fire Code 912.2
Department: Internal Services
Contact: Russ Hovland, ,
Topic: General
Comment Number: 1
Comment Originated: 11/14/2012
11/14/2012: This A-3 Occupancy is too large for V-B wood non -rated construction.
Fire Sprinklers are required. Please see attached letter for additional information.
Department: Light And Power
Contact: Doug Martine, 970.224.6152, dmartine@fcpov.com
Topic: General
Comment Number: 1
Comment Originated: 11/15/2012
11/15/2012: A landscape plan showing existing and planned streetlights was sent to Landmark
Engineering on 11-14-12. These lights need to be shown on the landscape plan, and tree
locations adjusted to provide a minimum 40 feet of clearance between shade type trees and
lights (15 feet if the tree is an ornamental type).
Comment Number: 2
Comment Originated: 11/15/2012
11/15/2012: It is assumed that afire booster pump will not be installed. If one will be installed,
please contact Light & Power Engineering at (970)221-6700 to coordinate service and metering
requirements.
Comment Number: 3
Comment Originated: 11/15/2012
11/15/2012: By City Code, the residential house on the site will need to be metered and
served separately.
Comment Number: 4
Comment Originated: 11/15/2012
11/15/2012: Light & Power Engineering will need a Commercial Service Information (C-1) form
completed relative to the service to the temple building, and the name/address of who to
invoice for the Light & Power electric development charges. There will be two invoices issued,
each for 50% of the Light & Power charges. The 1 st 50% will be payable before we can
schedule installation of the Light & Power facilities. The 2nd 50% will be payable before the
electric system can be energized. Once the plan is final, an AutoCad (version 2008) drawing of
the utility/site plan will need to be sent to Terry Cox at TCOX@FCGOV.COM.
Comment Number: 5 Comment Originated: 11/15/2012
11/15/2012: The electric transformer will need to be located within 10 feet of an all-weather
surface that is accessible to a utility line truck, and it will need a minimum of 8 feet unobstructed
clearance in front, and 3 feet on the other 3 sides. If the transformer will be screened (ex.
fenced in), please contact Doug Martine in Light & Power Engineering at (970)224-6152 to
coordinate specifics. Also, contact Doug with any questions.
Comment Number: 6
Comment Originated: 11/15/2012
11/15/2012: The utility plan shows electric utility facilities to be installed east of the sidewalk
along Timberline Rd. The electric facilities will be placed between the curb and the sidewalk.
The established utility installation sequence specifies that utilities will be installed from deepest
to shallowest, with electric to be installed after curbs (excluding the radii), but before the
sidewalks.
Department: PFA
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchanan(a)fcgov.com
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 11/28/2012
11/28/2012: Some cold hardiness issues have been observed in Sterling Silver Linden in Fort
collins by the Fort Collins Forestry Division. As a suggestion, Redmond Linden could be
considered as a substitution that has done well in Fort Collins.
Comment Number: 5 Comment Originated:
11/28/2012
11/28/2012: What form of irrigation will be provided to trees planted in out lots A&B?
Comment Number: 6 Comment Originated:
11/28/2012
11/28/2012: Please include the existing tree analysis and matrix information as a landscape
sheet or other method. This is currently referenced on the landscape sheets and the Statement
of Planning Objectives to include location; species; size; condition; intent to remove; keep in
place or transplant. Each tree is assigned a number.
Comment Number: 7 Comment Originated:
11/28/2012
11/28/2012: Please review tree placement and selection for site distance and stop sign
clearance at entries and intersections. Staff will be providing the applicant some additional
comments on this.
Comment Number: 8 Comment Originated:
11/28/2012
11/28/2012: Please provide a detail of transplanted trees to include such things as, guying,
mulching and staking. Include notes about tree transplanting that addresses methods time of
year, tree spade size, post planting irrigation. The City Forestry Division can provide some
information on these items.
Comment Number: 9 Comment Originated:
11128/2012
11/28/2012: Consider increasing the diversity of street trees used. These are some
suggestions to consider:
Along Trilby use three Chinkapin Oak in the middle of the row of Hackberry between the two
sidewalk entries to the project.
Along Majestic west of the west entrance to the parking lot consider using Chinkapin Oak in
place of Honeylocust. This is the area between Timberline and the west entrance to the lot.
Along Timberline just to the south of Majestic consider the use of Kentucky Coffee Tree.
Comment Number: 10 Comment Originated: 11/28/2012
11/28/2012: Consider using Fat Albert Blue Spruce at the corner beds in place of Black Hills
Spruce. It has excellent color and form and has much better availability. Its uniform shape
provides a nice formal effect
Comment Number: 11 Comment Originated: 11/28/2012
11128/2012: Please put a note by Bur Oak in the schedule on LP7 that says 'Bullet Gall
Resistant Trees"
Department: Internal Services
Contact: Russ Hovland, ,
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchanan(a.fcgov.com
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 11/28/2012
11/2812012: Please add additional General notes:
Place trees and include in a note the tree utility separations found in 3.2.1 K 1-5 plus that trees
shall be placed at least 8 feet away from driveways and alleys. Forty feet between shade trees
and City streetlights. Fifteen feet between ornamental trees and streetlights. Twenty feet
between shad and /or ornamental trees and traffic control signs and devices. Ten feet between
trees and water or sewer mains. Six feet between trees and water or sewer service lines. Four
feet between trees and gas lines.
All plant material shall be to the most current AAN standard for Nursery stock number one
grade.
The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened
to a depth of not less than 8 inches and soil amendment shall be thoroughly incorporated into
the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other
suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand
(1,000) square feet of landscape area.
A permit must be obtained from the City forester before any trees or shrubs as noted on this
plan are planted, pruned or removed on the public right-of-way. This includes zones between
the sidewalk and curb, medians and other city property. This permit shall approve the location
and species to be planted. Failure to obtain this permit may result in replacing or relocating
trees and a hold on certificate of occupancy.
The developer shall contact the City Forester to inspect all street tree plantings at the
completion of each phase of the development. All trees need to have been installed as shown
on the landscape plan. Approval of street tree planting is required before final approval of
each phase. Failure to obtain approval by the City Forester for street trees in a phase shall
result in a hold on certificate of occupancy for future phases of the development.
All trees shrubs and perennials and lawn areas will be irrigated with a permanent automatic
irrigation system.
Tree pruning or removal shall be performed by a City of Fort Collins Licensed arborist as
required by code.
Comment Number: 3 Comment Originated: 11/28/2012
11/28/2012: Echoing Current Plannings comment, please provide a continuous row of street
trees along Trilby and Majestic.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224-6143, lexr7a.fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 11/27/2012
11/27/2012: The landscaping proposed in the wetland mitigation areas do not reflect the
recommendations from the Ecological Characterization Study. Please amend the species
selected or provide a justification for why the species proposed are more suitable. Or is this
just a mix-up in the symbols used on the detailed landscape pages?
In addition, more trees and shrubs should be added to these areas for increased vertical
diversity.
Comment Number: 4
Comment Originated: 11/27/2012
11/27/2012: Asper the ECS, the recommendations found on page 7 regarding the raptor nest
to the west of Timberline shall be a condition of this project's approval. In addition, the Siberian
elms on site shall be surveyed prior to construction for any raptor nests.
If a raptors nest is found during the pre -construction surveys, then a temporary Limits of
Development shall be applied in accordance with Section 3.4.1(N)(5) of the Land Use Code.
Comment Number: 5
Comment Originated: 11/27/2012
11/27/2012: As a heads -up, staff is proposing an amendment to the Land Use Code that would
require mitigation of non-native trees, e.g., Siberian elms, if they are found to have habitat
value. Though the ECS suggests these species do not have value, I have observed raptors
perched on the trees and the trees certainly provide the only cover in this portion of the site.
Thus, staff would strongly encourage mitigation of these trees in the projects overall tree
mitigation plan. Adding the vertical diversity (trees and shrubs) into the wetland mitigation areas
will achieve this.
Comment Number: 6
Comment Originated: 11/27/2012
11/27/2012: The grading on the southwest mitigation area should undulate more to reflect a
more naturalistic mitigation area. The northeast mitigation area should do the same.
Comment Number: 7
Comment Originated: 11/30/2012
11/30/2012: In the updated ECS, please also reflect on how the lighting on the temple's tower
could or could not affect the area's bird populations.
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchanan(&fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 11/28/2012
11/28/2012: Please add a list on LP9 listing numbers by species of upsized mitigation trees.
On Sheet LP7 put an asterisk or foot note on species that are included for mitigation with an
explanation at the bottom of the page that says in effect- see sheet LP9 for upsized mitigation
tree numbers. Also on sheet LP9 identify what the abbreviations for Transplanted Trees is
BS=Blue Spruce and SP= Scotch pine.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970.221.6573, slangenberger(Mcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/14/2012
11/14/2012: An additional $47.50 is due for the TDRF PDP fees for this project. This can be
paid at such time as Final fees are paid.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224-6143, lex(mfcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/27/2012
11/27/2012: A letter from the Army Corps of Engineers has been provided that indicates the
site's wetlands are not jurisdictional (dated October 30, 2012).
Comment Number: 2
Comment Originated: 11/27/2012
11/27/2012: As per the ECS, the site has 17,775 sq ft (or 0.41 acres) of wetlands within the
elevated lateral ditch. As these wetlands possess little ecological value, e.g., they are only 1-2'
wide in most places, and are only associated with the elevated ditch, the applicants have
proposed that the wetlands be mitigated on -site.
The applicants have proposed wetland mitigation within two bioswale/water quality areas at the
northeast and southwest corners of the site. Is there groundwater data to support the selection
of these sites and so the planting can be better tailored to the different groundwater levels
expected? Staff suggests installing piezometers to measure the groundwater in this area prior
to finalizing the mitigation sites.
In our discussion at staff review, it was indicated that the wetlands will largely be supported by
stormwater runoff from the site and not by groundwater. Success criteria will need to be
developed in the monitoring plan, see below, to address this.
When finalized, the areas proposed for mitigation should be labeled as "Natural Habitat Buffer
Zones' in compliance with Section 3.4.1 of the Land Use Code (in some places, I've seen them
labeled as Natural Area Mitigation Boundary, this should be changed to Natural Habitat Buffer
Zone). These labels should be applied to the site, landscape and utility plans. Note that no
lighting can spill over into these buffer zones.
A mitigation and monitoring plan will be due at the time of final plans, if the PDP plans are
approved. The monitoring plan shall include a plan for three years of post -construction
monitoring, e.g., groundwater and plant success monitoring to achieve the success criteria that
will be established at the time of the Development Agreement.
Department: Engineering Development Review
Contact: Marc Virata, 970.221-6567, mvirata(a)fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 11/19/2012
11/19/2012: LCUASS 16.6.4 requires that a street crossing of greater than 56 feet requires the
construction of pedestrian refuge. This standard would require pedestrian refuge on Majestic
Drive at the Timberline Road intersection as well as Timberline Road at both the Trilby Road
and Majestic Drive intersections. In discussion with City transportation staff we've interpreted
that the median in Majestic Drive accomplishes the intent of the requirement even though the
median is not physically extended into the pedestrian crossing area. The lack of pedestrian
refuge island(s) on Timberline Road at both Trilby Road and Majestic Drive is left as an
unaddressed issue. City transportation staff can see the potential support for a variance for the
lack of a pedestrian refuge island on Timberline at Trilby due to the signalized intersection
allowing the timing of pedestrians to cross the intersection. For Timberline Road at Majestic
Drive the unsignalized nature of the intersection leaves potential support of a variance request
less clear. The present roadway design indicates that there is additional right-of-way behind the
proposed sidewalk such that the excess right-of-way could be utilized to provide pedestrian
refuge. The status on potential pedestrian refuge will need to be addressed prior to hearing.
Comment Number: 8
Comment Originated: 11/19/2012
11/19/2012: The southeast corner of Trilby Road and Timberline Road needs to be constructed
with split directional ramps for designating the westbound and northbound crossing
movements. A receiving ramp will also need to be added on the southwest corner of the
Trilby/Timberline intersection to receive the crossing movement (the proposed signal pole on
this corner may need to shift location as a result).
Comment Number: 16 Comment Originated: 11/19/2012
11/19/2012: Please coordinate the title of the plans to be consistent. The site plan and civil
construction plans share the same title, however the subdivision plat has a different title.
Topic: Plat
Comment Number: 2 Comment Originated: 11/19/2012
11/19/2012: The plat indicates that a 15' ditch easement and 10' irrigation easement are to be
vacated by the plat. Who are the owners of these easement interests that would be vacated?
They would need to be signatories on the plat approving the vacations.
Comment Number: 4
Comment Originated: 11/19/2012
11/19/2012: The dedicating of landscape easements to the City isn't required and should be
removed from the plat as their intent isn't understood.
Comment Number: 5 Comment Originated: 11/19/2012
11/19/2012: Please change the "emergency vehicle access" dedication to "emergency
access".
Comment Number: 14
Comment Originated: 11/19/2012
11/19/2012: Why is the right-of-way dedication along Timberline providing for a 1' area of
right-of-way behind the sidewalk instead of dedicating right-of-way to coincide with the back of
walk? To the extent possible, we would prefer to see right-of-way coincide with the back of
walk.
Contact: Sheri Langenberger, 970.221.6573, slangenberger((Dfcgov.com
Department: Engineering Development Review
Contact: Marc Virata, 970.221-6567, mvirata@fcgov.com
Topic: Construction Drawings
Comment Number: 9 Comment Originated:
11/19/2012
11/1912012: The street design plans did not provide an ultimate design of Timberline Road
abutting the property (between Trilby Road and Rock Castle Lane) to ascertain how interim and
ultimate improvements are intended and how these improvements align across intersections.
Comment Number: 10 Comment Originated:
11/19/2012
11/19/2012: The plan and profile sheets need to show indication that when tying into existing
roadways that the flowline/centerline grades shown on the drawings match to exisfing
centerline/flowline grades (such as on Sheet C17, extend existing profile grade to the west to
indicate that the existing grade is 3.81 %.)
Comment Number: 11 Comment Originated:
11/19/2012
11/19/2012: Please ensure that signing and striping plan sheets do not split information across
intersections, the plan sheets need to have the complete intersection shown for verification of
alignment.
Comment Number: 12 Comment Originated:
11/19/2012
11/19/2012: Please label the plan and profile sheets in terms of stating that the profile lines are
centerline.
Comment Number: 13 Comment Originated:
11/19/2012
11/19/2012: 7.4.6.8 of the Larimer County Urban Area Street Standards requires offsite design
along Timberline Road to be continued 1,000 feet from the property.
Comment Number: 15 Comment Originated:
11/19/2012
11/19/2012: The landscaped median within Majestic Drive will need to provide an underdrain
system underneath the median to mitigate subsurface water from the median irrigation. It
appears the proposed storm sewer crossing Majestic Drive can be utilized for this subdrain
system.
Topic: General
Comment Number: 3
Comment Originated: 11/1912012
11/19/2012: The use of enhanced crosswalks mid -block across Majestic Drive won't be
allowed and need to be removed. The use of enhanced crosswalks at the intersections of
Timberline Road and Trilby Road are acceptable (though not required), along with the
enhanced crosswalks that cross the private driveways. The enhanced crosswalks that cross the
private driveways should ideally be built in a manner that has the back of crosswalk correspond
to the right-of-way.
Comment Number: 6
Comment Originated: 11/19/2012
11/19/2012: Majestic Drive's cross sectional width does not match the typical connector
standard in Larimer County Urban Area Street Standards (LCUASS) with wider sidewalk and
parkways than the standard requires. Please be aware that the additional sidewalk width (from
4.5' feet 5') will not be reimbursable by the City as would a typical 5' sidewalk on City
designated collector roadway.
Department: Current Planning
Contact: Courtney Levingston, 970.416.2283, clevingston(a.fcgov.com
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 11/27/2012
11/27/2012: Please note the visual clearance standard in 3.2.1(D)(5)(a) as it relates to driver
sight dstance at driveway intersections with Majestic.
Comment Number: 6
Comment Originated: 11/27/2012
11/27/2012: There is a bit of confusion with the plant species list (numbers) and what is shown
on the landscape plans. Please correct this upon resubmittal.
Comment Number: 7
Comment Originated: 11/30/2012
11/30/2012: Irrigation plans must be submitted at time of final plan/building permit submittal.
Please see LUC 3.2.2(J)(3) for details on how to ensure you comply with the irrigation plan
requirements.
Topic: Lighting Plan
Comment Number: 1
Comment Originated: 11/28/2012
11/2812012: Please provide alighting detail sheet for the proposed illumination of Angel
Moroni in addition to your 3.2.4 alternative compliance submittal. The intent of this Section is to
prohibit uplighting and to prevent an adverse effect on adjacent properties or the surrounding
neighborhoods. While uplighting is prohibited, the City of Fort Collins Land Use Code allows for
alternative compliance. By providing additional lighting detail, the extent to which the proposed
lighting of the steeple/Angel Moroni and the affects of the lighting will be evaluated while
considering the light source, level of illumination, hours of illumination and need for illumination
in relation to the potential negative impacts of the lighting on adjacent property owners and/or
the neighborhood.
Staff has compared the proposed uplighting with that of a City of Fort Collins Street Light and
suggests that the proposed uplighting be reduced so that the illumination levels are generally
equivalent. As currently proposed, the watts (26 x 4) is 104 where as one City street light is only
70 Watts. The lumens proposed are 8000 (2000 x 4) where as a City street light is 6300. The
Kelvins of the proposed lamp are 3000 and a City Street light is closer to 2500. In terms of
reflectivity, asphalt is not reflective at all where as the gold painted Angel Moroni is highly
reflective.
In so much, suggests a lower watt, and possibly a high-pressure sodium lamp due to its warm
appearance when looking to meet alternative compliance.
On the lighting plan update, please call out which fixture and the quantity will be used to light
the Angel Moroni.
This issue should be addressed prior to scheduling the Planning and Zoning Board hearing.
Comment Number: 2 Comment Originated: 11/28/2012
11/2812012: Staff has determined that resubmittal and another formal round of review is
necessary prior to going to Planning and Zoning Board.
Department: Engineering Development Review
Department: Current Planning
Contact: Courtney Levingston, 970.416.2283, clevingstonna.fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/14/2012
11/14/2012: The build -to line modification request is not necessary due to exceptions to the
build -to line standards contained in Section 3.5.3(13)(3)(d). The formal garden/plaza area
between Timberline Road serves as an outdoor space in this respect and meets the exception
criteria.
Comment Number: 2 Comment Originated: 11/14/2012
11/14/2012: Lowering the 6 foot wrought iron fence could assist and reinforce meeting the
build -to line exception standard in Section 3.5.3(13)(3)(d). Woodward Governor has a similar 4
foot wrought iron security fence that meets security needs at the lower height. This lower height
would provide a better connection between the building and the street.
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 11/20/2012
11/20/2012: On sheet LS1, (hydrozone) there is approximately a 50,000 square foot area along
Trilby that is included as very low water usage that is not part of the project boundary. Please
subtract this from the 92,803 square feet identified as very low water use on the water budget
chart and recalculate the totals/annual water usage. This can be updated at time of Final Plan.
Comment Number: 2
Comment Originated: 11/27/2012
11/27/2012: There is a 160 foot street tree gap along Timberline Road and 145 foot street tree
gap along Majestic. The Land Use Code states in Section 3.2.1(D)(2)(a) that, "wherever the
sidewalk is separated from the street by a parkway, canopy shade trees shall be planted at 30
foot to 40 foot spacing in the center of all such parkway areas. Such street trees shall be
placed at least 8 feet away from the edges of driveways and alleys, and 40 feet away from any
streetlight and to the extent reasonably feasible, be positioned at evenly spaced intervals."
Canopy trees should be added in these areas to fill in the gaps. This will need to be updated
prior to going to Planning and Zoning Board.
Comment Number: 3
Comment Originated: 11/27/2012
11/27/2012: The intersection of Trilby and Timberline is signalized and the canopy trees need
to be spaced 40 feet from the streetlight per LUC Section 3.2.1(K). At the non -signalized
intersections of Majestic and Trilby, there should be 20 foot on center spacing. Please update
prior to Planning and Zoning Board hearing.
Comment Number: 4
Comment Originated: 11/27/2012
11/27/2012: The interior of the parking lot features landscape islands with ornamental trees as
opposed to canopy trees. The intent of the standard was to provide comfort and visual relief.
While a case could be made that the generous ornamental plantings are in essence equal to
compliance with the standard, a formal modification request should be made.
As a friendly suggestion, modification requests should be submitted in the following format:
1. Standard at Issue: state the code section (text citation) you are requesting the modification
for.
2. Describe your modification request.
3. State a justification for the modification request based on the criteria outlined in Section 2.8.2
of the LUC and then go into the reasoning behind that selected criteria.
We would need this prior to hearing.
C�tyof
Fort Collins J
December 20, 2012
Ken Merritt
Landmark Ltd.
Representing the Church of Jesus Christ of Latter -Day Saints
3721 West Eisenhower Blvd
Loveland, CO 80537
RE: LDS Temple, PDP120029, Round Number 1
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6760
970.224.6134 - fax
rcgov. com/developmentreview
Please see the following summary of comments from City staff and outside'reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Courtney Levingston, at
970-416-2283 or clevingston@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970.416.2283, clevingston fcgov.com
Topic: Building Elevations
Comment Number: 1
Comment Originated: 11/14/2012
11/14/2012: It would appear as though to the top of the "painted fiberglass statute" is about 112
feet. That seems quite high given the context of the surrounding neighborhoods as it relates to
compatibility with the surrounding land uses. Section 3.5.1(G)(4) speaks to compatibility and
neighborhood scale in this manner. It may be difficult for staff to find compliance with Section
3.5.1 as proposed as it appears out of scale with the neighborhood and community. At the next
round of review, Staff suggest providing exhibits comparing the height of the proposed
structure with other tall structures in the community (the Key Bank building, for example).
Comment Number: 2
Comment Originated: 11/14/2012
11/1412012: 1 do not see the trash enclosures on the elevations. Please include and note
materials and the trash enclosure should be on a concrete pad. This can be done at time of
final plan submittal.
Comment Number: 3
Comment Originated: 11/20/2012
11/14/2012: Please provide bike rack detail on elevations. Bicycle parking should allow the
bicycle frame and both wheels to be securely locked to the parking structure. The structure
shall be of permanent construction such as heavy gauge tubular steel with angle bars
permanently attached to the pavement foundation. Fixed bicycle parking facilities shall be at
least 2 feet in width and 51/2 feet in length, with additional back -out or maneuvering space of at
least 5 feet. This can be submitted at time of Final Plan.