05/24/2011: All I received to review was sheet A-100, the Master Site Plan. If this is the
only site plan.that was submitted, it is lacking sufficient detail to comment on. i.e., need to
show parking stall and drive aisle dimensions, building footprint or envelope dimensions
and setbacks to lot lines, labeled bike racks, trash enclosure locations, parking lot light
poles, etc.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project, please
feel free to contact me at 970-221-6343.
Sincerely,
Ted Shepard
Chief Planner
1
Staff Review Letter Generated: 6/13/2011 at 2:03 pm
City of
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
Number: 2 Issue Originated: 06/07/2011
06/07/2011: Are there any modifications to the water lines in the area between the
Sheriffs Office and the Detention Center? If so, schedule a meeting to review the existing
water mains, services and fire lines in that area.
Number: 3 Issue Originated: 06/07/2011
06/07/2011: On the shallow sanitary sewers, include the design of the insulation
(thickness and width) and a specification for the insulation. It must a brand and type that is
suitable for underground applications.
Number: 4
Issue Originated: 06/07/2011
06/07/2011: Clarify the note on the connection to the existing sanitary sewer MH
emphasize that the MH must be core drilled.
Number: 5
Issue Originated: 06/07/2011
06/07/2011: At locations where encasement is required on sewers (at crossings with
water mains), "EZ Wrap" or similar product may be applied to the sewer joints for
encasement.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington(cDfcgov.com
Topic: Construction Drawings
Number: 6 Issue Originated: 06/07/2011
06/07/2011: See redlined plans for other comments.
Department: Zoning
Contact: Peter Barnes, 970-416-2355, pbarnes(CDfCgov.com
Topic: Landscape Plans
Number: 1
Issue Originated: 05/24/2011
05/24/2011: Per Sec. 3.2.1(E)(5)(c) of the LUC, each parking lot landscape island must
have at least 1 tree. Most shown don't have a tree.
Number: 2
Issue Originated: 05/24/2011
05/24/2011: Sec. 3.2.1(E)(5)(e) - The easternmost row of parking has more than 15
parking spaces in a row without an intervening landscape island.
Number: 3 Issue Originated: 05/24/2011
05/24/2011: Sec. 3.2.2(E)(4) - the ends of parking aisles should be defined by a
landscape island. Many of the end of aisles are defined by a "painted" island.
Topic: Site Plan
Number: 4 Issue Originated: 05/24/2011
Staff Review Letter Generated: 6/13/2011 at 2:03 pm
City of
Flirt Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970,224.6134 - fax
fcgov.com
06/08/2011: There are many sheets with line over text & text over text issues.
Number: 5 Issue Originated: 06/08/2011
06/08/2011: The subtitle on sheet CV01 does not describe the property completely.
Number: 6 Issue Originated: 06/08/2011
06/08/2011: Benchmark 2-94's elevation has changed as of the 2008 publishing of the
City of Fort Collins Vertical Control Network.
Number: 7 Issue Originated: 06/08/2011
06/08/2011: Please change the "County Road 9" references in the benchmark
descriptions to "Ziegler Road". Per Resolution 2000-73 the road was renamed.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icountyftfcgov.com
Topic: Landscape Plans
Number: 2
06/08/2011: No comments.
Topic: Site Plan
Number: 1
06/08/2011: No comments.
Department: Traffic Operation
Issue Originated: 06/08/2011
Issue Originated: 06/08/2011
Contact: Ward Stanford, 970-221-6820, wstanford(cDfcgov.com
Topic: Traffic Impact Study
Number: 1 Issue Originated: 06/08/2011
06/08/2011: TIS does not review or provide analysis of the existing, background or total
conditions related to the Workender program being extended into the weekday. It is adding
significant traffic to the area roadways but fails to analyze or contrast how the new traffic
will impact the area. The TIS fails to meet typical LCUASS TIS review standards.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington(a)-fcgov.com
Topic: Construction Drawings
Number: 1 Issue Originated: 06/07/2011
06/07/2011: Water service from water main to a point 5 feet downstream of the meter pit
must be 2" or 3" (same size as the meter). No 2.5" available. Beyond the meter pit, the
size of service may be increased. 3
1
Staff Review Letter Generated: 6/13/2011 at 2:03 pm
City of
Flirt Collin
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(Mcgov.com
Topic: General
Number: 1 Issue Originated: 06/08/2011
06/08/2011: Please provide HGLs for the storm sewer profiles.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue(CDfcgov.com
Topic: General
Number: 2 Issue Originated: 06/08/2011
06/08/2011: Class V RCP is probably not necessary, and class 3 can be used.
Number: 3 Issue Originated: 06/08/2011
06/08/2011: Please design the outlet structure for the ultimate design with the 1 cfs per
acre release. This will prevent from having to alter the outlet structure each time future
additions to the campus are proposed.
Number: 4 Issue Originated: 06/08/2011
06/08/2011: Please revise wq outlet structure detail. per redlines. Elevations A and B do
not correspond to the water quality depth of 2.43 ft. Discussion should take place on the
pros and cons of providing a temporary WQ orifice plate or the ultimate plate.
Number: 5 Issue Originated: 06/08/2011
06/08/2011: Please revise erosion control notes per redlines.
Number: 6 Issue Originated: 06/08/2011
06/08/2011: Please add a riprap detail. Fort Collins requires riprap to be buried with 6
inches of topsoil with temporary erosion control.
Number: 7 Issue Originated: 06/10/2011
06/10/2011: The City of Fort Collins has detention pond landscape standards adopted by
City Council.. Please review standards and revise ponds accordingly. These standards
are located on the City's website.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty(cDfcgov.com
Topic: Construction Drawings
Number: 3 Issue Originated: 06/08/2011
06/08/2011: The text on sheet DT06 is very bold & hard to read. Can it be toned down?
Number: 4 Issue Originated: 06/08/2011
1
Staff Review Letter Generated: 6/13/2011 at 2:03 pm
City of
Fort Collins
Department: PFA
Contact: Carie Dann, 970-219-5337, CDANN(cDpoudre-fire.org
Topic: General
Number: 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
Issue Originated: 06/08/2011
06/08/2011: WATER SUPPLY: PFA will require two new hydrants to service the new ASD
structure: One to the southwest of the building, another to the northeast. It's difficult to
determine if plans currently show one or two new hydrants; UT01 and 02 seem to show a
hydrant symbol in one place but a hydrant label in another. General hydrant requirements
are below:
Fire hydrants, where required, must be the type approved by the water district having
jurisdiction and the Fire Department. Hydrant spacing and water flow must meet
minimum requirements based on type of occupancy. Minimum flow and spacing
requirements include:
• Commercial -1,500 gpm at 20 psi residual pressure, spaced
not further than 300 feet to the building, on 600-foot centers thereafter
These requirements may be modified if buildings are equipped with automatic fire sprinkler
systems.
2006 International Fire Code 508.1 and Appendix B
Number: 2 _ _ _ _ _ ._ Issue Originated: _06/08/2011
0.6/08/2011: FIRE DEPARTMENT CONNECTION: PFA will allow the FDC for the new
ASD to be located on the building, instead of remote. Location TBD and approved by PFA.
ALSO, please show locations of FDCs on existing buildings.
Number: 3
Issue Originated: 06/08/2011
06/08/2011: TURNING RADII: Minimum turning radii is 25 feet inside, 50 feet outside.
Some existing curves are less but new curves must meet 25/50.
Number: 4
Issue Originated: 06/08/2011
06/08/2011: EMERGENCY VEHICLE ACCESS: Because this is a county -owned property,
we cannot dedicate an emergency access easement to ourself. However, we may
consider an emergency access alignment, to ensure access to structures. Can we please
meet on site soon to discuss.
Number: 5
Issue Originated: 06/08/2011
06/08/2011: HYDRANTS: Several existing hydrants are shown but are not labeled (as
#11).
Staff Review Letter Generated: 6/13/2011 at 2:03 pm
City of
Fart Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
perhaps the concrete channel can taper the curb height as it approaches the sidewalk in
order to not have a raised curb section up against the sidewalk.
Number: 12
Issue Originated: 06/08/2011
06/08/2011: There is a potential question posed to our legal staff as to whether the
unplatted property that comprises the site would be interpreted as to needing to be platted
in conjunction with this review.
Number: 13
Issue Originated: 06/08/2011
06/08/2011: Please note that the legal descriptions of the site do not match between the
site plan and the construction plan set.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata(cDfcgov.com
Topic: General
Number: 14
Issue Originated: 06/08/2011
06/08/2011: Just as a heads -up, the data on the Larimer County GIS specifies that the
parcel of land in which the new ASD building is to be located has a legal description of
"East Elizabeth Medical Condo", it -appears to be an error and might be worth correcting.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine(cDfcgov.com
Topic: General
Number: 1 Issue Originated: 05/25/2011
05/25/2011: Relative to the ASD building, Light & Power Engineering will need a
Commercial Service Information (C-1) form completed. Will also need to coordinate the
location of the electric transformer, and the name/address of who to invoice for the Light &
Power Development Charges. Please contact Light & Power Engineering at 221-6700.
Number: 2 Issue Originated: 05/25/2011
05/25/2011: Records indicate that the existing electric services to the Sheriffs office and
the Comcorr building are each 1200 amps at 277/480 volts. If either of these need to
change, please contact Light & Power Engineering to coordinate power requirements and
associated costs.
1
Staff Review Letter Generated: 6/13/2011 at 2:03 pm
City Of
Fort Collins
/410 ..
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
06/08/2011: Please coordinate the titles to be consistent on all the drawings, the
construction plan set has a different title than the other documents.
Topic: General
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata(cDfcgov.com
Topic: General
Number: 1 Issue Originated: 06/08/2011
06/08/2011: Ideally, additional right-of-way or access easement should be dedicated to the
City to encompass all of the sidewalk along Midpoint (existing and proposed). Currently it
appears portions of the existing sidewalk as well as new sidewalk.
Number: 2 Issue Originated: 06/08/2011
06/08/2011: It appears that with the attached sidewalk shown on Midpoint Drive as the
roadway heads south (though is labeled as detached), relocation of streetlights, fire
hydrants, and other utilities would be needed. Out of curiosity, has a detached sidewalk
been looked at? It appears there could be room to do an attached sidewalk that would
avoid relocation of streetlights, hydrants, and other utilities and perhaps still keep the fence
in its present location.
Number: 3 - Issue Originated: 06/08/2011
06/08/2011: The access ramps out to Midpoint that are "mid -block" and not at
intersections with public streets appears awkward in that there are no access ramps
across the street for pedestrians to "receive" and is it preferred to promote these crossing
not at intersections? Do these access ramps need to be provided? If these crossings are
intended to promote pick-up/drop-off maneuvers, can this be accomplished on -site as
Midpoint is not intended to have parking on -street and bike lanes could potentially be added
to this roadway.
Number: 5 Issue Originated: 06/08/2011
06/08/2011: The conceptual review plans indicated additional storm sewer line installation
that would traverse offsite several thousand feet to the future Sharp Point street roadway
connection. This was not shown on the construction plan set. Is it no longer under
consideration?
Number: 6 Issue Originated: 06/08/2011
06/08/2011: It appears that an existing gutter pan that takes parking lot flows and directs it
over the existing sidewalk on Midpoint onto a cross pan across Midpoint is being
reconfigured into a concrete channel (Sheet SW02) that empties out onto and over the
existing sidewalk on Midpoint. It would be ideal if perhaps in conjunction with the concrete
channel, a sidewalk chase were installed to direct flows under the walk and not continue to
perpetuate nuisance flows over the sidewalk, as noted in 7.7.4 of the Larimer County
Urban Area Street Standards. If the applicant is not wanting to provide a sidewalk culvert,
1
Staff Review Letter Generated: 6/13/2011 at 2:03 pm
City of
F&I C611ins
/"
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224,6134 - fax
fcgov.com
June 13, 2011
Carr Bieker
The Architect's Studio
151 W Mountain Avenue
Fort Collins, CO 80524
City staff and outside reviewing agencies have reviewed your submittal for Larimer County Midpoint
Campus Detension Center Expansion, and we offer the following comments:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata(cDfcgov.com
Topic: Construction Drawings
Number: 4 Issue Originated: 06/08/2011
06/08/2011: The existing conditions, horizontal control, grading and erosion control sheets
are missing the portion of area that includes -Where Midpoint Drive starts to -curve from
east -west to north -south: Please include this information as it may help to better
understand what's occurring with what appears to be a new driveway cut and closure of
an existing.
Number: 7 Issue Originated: 06/08/2011
06/08/2011: Ideally a vicinity map should be provided on all the sheets, not just the
sidewalk plan sheets.
Number: 8
Issue Originated: 06/08/2011
06/08/2011: Please replace "Director of Engineering" with "City Engineer" on the utility plan
approval block.
Number: 9 Issue Originated: 06/08/2011
06/68/2011: The General Notes on the construction plan set need to reflect that it is based
upon the 4/1/2007 version. It was last repealed and reenacted on April 1, 2007.
Number: 10 Issue Originated: 06/08/2011
06/08/2011: On the existing conditions sheet replace General Note #4 with: "Limits of
street repair are approximate. Final limits to be determined in the field by the City
Engineering Inspector at the time the streets cuts are made. All repairs to be done in
accordance with City standards."
Number: 11 Issue Originated: 06/08/2011