Loading...
HomeMy WebLinkAboutZIEGLER - HARVEST PARK PDP - PDP120033 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATION (6)0 0 HAZARDOUS MATERIALS Inspection Surveys were completed on all buildings, there are no known hazardous issues. VARIANCE REQUEST • County Fair Lane, alignment and design. Final improvements provided, requested, as noted in the Civil CD's. • Minimum local street design standards, one request to address two specific design standards; 1s` - reduce minimum tangent between curves on local residential streets, 2"d - reduce the minimum distance between high volume driveways and intersections. EASEMENTS —LETTER OF INTENT • Temporary Construction easement discussed and requested of the Harvest Park HOA, for new tree plantings in their existing detention pond. • There is no request for any off -site easements. The sanitary sewer connection on the Harvest Park property is within the existing sewer easement and our proposed grades are matching at the property line so there is no request for a temporary construction easement. OWNERSHIP & MAINTENANCE RESPONSIBILITY • An Ownership HOA will be established to provide overall project management including maintaining all exterior buildings, private landscape open space areas, walk/driveways and other common elements. Private trash/recycle collection services will be provided for each unit. Stephen J. Steinbicker, AIA, NCARB LEED Accredited Professional BD +C Architecture West, LLC HARVEST PARK / ZIEGLER MIXED -USE OVERALL DEVELOPMENT PLAN & PRELIMINARY DEVELOPMENT PLAN FORT COLLINS, COLORADO Complete List of Existing WFeaesed) Street Names County Fair Lane Saber Cat Drive Ziegler Road Property Owners / Partners & Addresses DP Investment Group LLC 4640 Withers Drive Fort Collins, Colorado 80524 Lindsay Pierson Sherry Pierson Jacob Pierson Jamie DeVries Brian DeVries Phasing December 5, 2012 The project will be completed in 2-4 phases, (subject to Final Approvals and Sales); • 1st Phase; will include all public improvements, public road/walk construction, utilities, detention pond, Building 'A', (NWC) and pad development on the remaining 3 building sites. Start Spring — 2013, complete Fall - 2013 • 2"d _ 4rn Phase; construction of Buildings' B, C & D', consecutively. Winter —2014 thru Spring — 2015 CONCEPTUAL MEETING COMMENTS • We have coordinated all Zoning, Environmental Planning, Current Planning issues into the Final Documents Submittal. • We have coordinated all Water/Sewer, Fire, Stormwater, Electric Engineering & Transportation Utility issues into the Final Documents Submittal. • Geo-Technical, Traffic Engineering, Environmental Characterization, Independent Building Inspections and existing tree mitigation site investigation/plan & associated Reports were obtained, provided. All applicable information/requirements will be implemented.