HomeMy WebLinkAboutLEGACY AUTO - PDP - PDP120001 - CORRESPONDENCE - (11)Page 7 of 7
01/24/2012
means
shows
01/24/2012
01/24/2012
existing
01/24/2012
parking".
fence
other)?
01/24/2012
2/7/2012
materials to complete the installation.
Topic: Lighting Plan
Comment Number: 3
Comment Originated:
01/24/2012: New and existing lighting must comply with current code regulations. This
that lights must be down —directional and light sources shielded. No fixtures at an angle on
angle brackets are allowed, and no adjustable angle brackets are allowed. Add note to plan
that all new and existing fixtures will be down —directional and shielded. The lighting plan
parking lot light poles and location. Please also show the locations on the site plan. Are any
ground —mounted lights proposed? If so, show them on the lighting and site plans. Are the
Aero—Dome light fixtures shown on the lighting plan 'shielded'? It's difficult to tell from the
drawing if the light source is concealed.
Topic: Site Plan
Comment Number: 2
Comment Originated:
01/24/2012: Provide a detail of the construction of the'decorative display spaces', i.e.
materials, color, etc.
Comment Number: 4 Comment Originated:
01/24/2012: show/label/dimension existing canopy on plans. Indicate front setback of
building and phase 2 addition. Indicate setback from Phase 4 building to north lot line.
Comment Number: 5 Comment Originated:
01/24/2012: The 53 space storage parking area in Phase 1 is labeled "stacked storage
What does "stacked" mean. Is the intent to stack items two high? If so, the 6' tall screen
isn't tall enough. Or does'stacked' really mean tandem parking (one space behind the
Comment Number: 6
Comment Originated:
01/24/2012: The 8' wide customer parking stalls need to be 9' wide (Sec. 3.2.2(L) Table A).
Page 6 of 7
Comment Number: 3
02/07/2012
Comment Originated:
02/07/2012: The flows that would leave the pond over the emergency spillway need to be
analyzed and shown that they can pass through the properties to the south and west without
inundating any structures all the way to the nearest public right—of—way..
Comment Number: 4 Comment Originated:
02/07/2012
02/07/2012: The detention pond needs to meet the requirements in the Detention Pond
Landscape Standards.
Department: Zoning
Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com
Topic: General
Comment Number: 8
01/24/2012
Comment Originated:
01/24/2012: Note should be added to project data on cover sheet that a maximum of 36
display models will be displayed on designated display spaces and excess inventory will be
stored on the designated screened storage spaces.
Topic: Landscape Plans
Comment Number: 1
01/24/2012
Comment Originated:
01/24/2012: The 15' landscape strip along College Avenue needs trees/shrubs per Sec.
3.2.1(E)(4). Phase lines on site and landscape plans are difficult to determine for Phases
1-3.
The phases should be delineated in a clearer manor.
Comment Number: 7 Comment Originated:
01/24/2012
01/24/2012: Add a Planting Note stating that all landscaping and irrigation must be installed
in
each phase prior to the issuance of a certificate of occupancy for use of any building or
property within that phase or, if not installed, must be guaranteed with a financial guarantee
in
the amount of 125% of a written estimate from a landscape contractor of the value of labor
and
2/7/2012
•`
0
Page 5 of 7
02/01/2012
02/01/2012
plan.
02/01/2012
01 /23/2012
02/07/2012
of
02/07/2012
routed
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
Comment Number: 1
Comment Originated:
02/01/2012: Electric development and system modification charges will apply. Please
coordinate power requirements with Light & Power Engineering at (970)221-6700.
Comment Number: 2 Comment Originated:
02/01/2012: Light & Power Engineering will need a paper copy (or pdf) of the final utility
A pdf can be sent to Doug Martine at DMARTINE@FCGOV.COM.
Comment Number: 3 Comment Originated:
02101/2012: Please send an AutoCad drawing of the final site plan to Terry Cox at
TCOX@FCGOV.COM.
Department: Park Planning
Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com
Topic: General
Comment Number: 1
01/23/2012: No comments
Comment Originated:
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, waamarque@fcgov.com
Topic: General
Comment Number: 1
Comment Originated:
02/0712012: The Development is required to detain half College Avenue along the frontage
this site. These flows need to be routed into the detention pond.
Comment Number: 2 Comment Originated:
02/07/2012: The site needs to detain basin 4 as well. These flows should be able to be
2/7/2012
into the inlet near the southern boundary of the site.
Page 4 of 7
01 /27/2012
ability
purposes
to
three)
available
palette).
01 /27/2012
(D)
from
over
buffer
02/06/2012
Comment Number: 2
Comment Originated:
01/27/2012: Within the 50' buffer zone, according to Article 3.4.1(E)(1)(g), the City has the
to determine if the existing landscaping within the buffer zone is incompatible with the
of the buffer zone. The landscaping in the buffer zone, as currently proposed, in insufficient
meet the standards of 3.4.1. For instance, the trees proposed within the buffer area (only
are lacking both in quantity (we want more trees and shrubs throughout the entire site) and
quality (the proposed trees are not native, please see the City's Native Plants Guide
at hftp://www.fcgov.com/naturalareas/native—plants.php for a more appropriate plant
Staff would be happy to meet with you to discuss these issues in more detail.
Topic: Lighting Plan
Comment Number: 1
Comment Originated:
01/2712012: With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4
(6) requires that "natural areas and natural features shall be protected from light spillage
off —site sources." Thus, lighting from the parking areas or other site amenities shall not spill
to the buffer areas. The lighting plan must not allow for any foot candle spillage into the
zone, in addition to addressing zoning's comments below.
Department: Historical Preservation
Contact: Josh Weinberg, 970-221-6206, jweinberg@fcgov.com
Topic: General
Comment Number:
Comment Originated:
Building not yet 50 years old, so there is no historic preservation review.
2/7/2012
Department: Light And Power
Page 3 of 7
and PDP—C1.1 B of the plan set show 33 & 34 spaces, respectively. Please identify the
other 2
or 3 spaces.
Comment Number: 3
02/06/2012
Comment Originated:
02/06/2012: There is so much line work on the 2 Site Plans and it makes it very difficult to
read
them. The utilities, curve radii, existing landscaping & notes, and possibly contours may be
eliminated from these plans.
Comment Number: 4 Comment Originated:
02/06/2012
02/06/2012: There is a lot of "line over" information on the Site Plans that must be
eliminated.
This makes certain areas of the plan illegible.
Comment Number: 5 Comment Originated:
02/06/2012
02/06/2012: Is the pond in the southwest corner of the site really a "retention" pond, not a
detention pond?
Comment Number: 6
02/06/2012
Comment Originated:
02/06/2012: There are 2 described lines (metes & bounds) on the Site & Landscape Plans
that
are not shown on the Subdivision Plat. What are they for? Please see red —lined Site Plans.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: Construction Drawings
Comment Number: 3
01 /27/2012
Comment Originated:
01/27/2012: The following notes/graphics will need to be added to the utility plan:
1. Please indicate the "limits of development' line, as per Section 3.4.1(N)(1) of the Land
Use
Code.
2. Please add the following note to the utility, site and landscape plans "See Section 3.4.1 of
the Land Use Code for allowable uses within the buffer zone"
3. Please add an Environmental Planner signature to the signature blocks on the utility
plans.
Topic: Landscape Plans
2/7/2012
a
Page 2 of 7
970.221.6750
970.224.6134 - fax
fcgov.com/devo/0pmenfreview
0 -
February 07, 2012
Don Shields
WG Architects
P.O. Box 270788
Fort Collins, CO 80527
RE: Legacy Auto, PDP120001, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact
the
individual commenter or direct your questions through the Project Planner, Steve Olt, at
970-221-6341 or
solt(a)fcoov.com.
Comment Summary:
Department: Current Planning
Contact: Steve Olt, 970-221-6341, solt@fcgov.com
02/06/2012
Planning
02/06/2012
Topic: General
Comment Number: 1
Comment Originated:
02/06/2012: Please better define "urban tractors" in the Description of Rationale in the
Objectives.
Topic: Site Plan
Comment Number: 2
Comment Originated:
02/0612012: The Planning Objectives indicate 36 vehicle display spaces. Sheets
PDP—C1.1A
2/7/2012
Page 1 of 7
Steve Olt
From:
Steve Olt
Sent:
Tuesday, February 07, 2012 10:34 AM
To:
'dons@wgarchitects.com'
Subject: FW: Legacy Auto PDP - staff review 2/08/12
Don,
I am forwarding this message, with comments, on to you regarding Legacy Auto PDP. Sorry, I
misspelled wgarchitects in your e-mail address when I previously sent the message.
SAM Olt
Steve Olt
Project Planner
From: Steve Olt
Sent: Tuesday, February 07, 2012 10:29 AM
To: 'LegacyTractors@yahoo.com'; 'dons@wgarchitercts.com'
Cc: Lindsay Ex; Doug Martine; Wes Lamarque; Peter Barnes
Subject: Legacy Auto PDP - staff review 2/08/12
Gary and Don,
Attached is a "DRAFT" staff comment letter for your Legacy Auto PDP submittal. A meeting
with you and staff for the first round of development review for the project will take place
tomorrow morning, February 8th, at 8:30 a.m. in conference room A, 281 North College Avenue.
Other comments will be available at the meeting and staff will provide you with "complete"
comments for the first round by the end of the day Friday, February 1 Oth.
Steve Olt
City's Project Planner
970-221-6341
solt@fcgov.com
Fort Collins
Community Development and
Neighborhood services
281 North
College Avenue
PO Box 580
Fort Collins.
CO 80522
2/7/2012