Loading...
HomeMy WebLinkAboutLEGACY AUTO - PDP - PDP120001 - CORRESPONDENCE - (11)Page 7 of 7 01/24/2012 means shows 01/24/2012 01/24/2012 existing 01/24/2012 parking". fence other)? 01/24/2012 2/7/2012 materials to complete the installation. Topic: Lighting Plan Comment Number: 3 Comment Originated: 01/24/2012: New and existing lighting must comply with current code regulations. This that lights must be down —directional and light sources shielded. No fixtures at an angle on angle brackets are allowed, and no adjustable angle brackets are allowed. Add note to plan that all new and existing fixtures will be down —directional and shielded. The lighting plan parking lot light poles and location. Please also show the locations on the site plan. Are any ground —mounted lights proposed? If so, show them on the lighting and site plans. Are the Aero—Dome light fixtures shown on the lighting plan 'shielded'? It's difficult to tell from the drawing if the light source is concealed. Topic: Site Plan Comment Number: 2 Comment Originated: 01/24/2012: Provide a detail of the construction of the'decorative display spaces', i.e. materials, color, etc. Comment Number: 4 Comment Originated: 01/24/2012: show/label/dimension existing canopy on plans. Indicate front setback of building and phase 2 addition. Indicate setback from Phase 4 building to north lot line. Comment Number: 5 Comment Originated: 01/24/2012: The 53 space storage parking area in Phase 1 is labeled "stacked storage What does "stacked" mean. Is the intent to stack items two high? If so, the 6' tall screen isn't tall enough. Or does'stacked' really mean tandem parking (one space behind the Comment Number: 6 Comment Originated: 01/24/2012: The 8' wide customer parking stalls need to be 9' wide (Sec. 3.2.2(L) Table A). Page 6 of 7 Comment Number: 3 02/07/2012 Comment Originated: 02/07/2012: The flows that would leave the pond over the emergency spillway need to be analyzed and shown that they can pass through the properties to the south and west without inundating any structures all the way to the nearest public right—of—way.. Comment Number: 4 Comment Originated: 02/07/2012 02/07/2012: The detention pond needs to meet the requirements in the Detention Pond Landscape Standards. Department: Zoning Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com Topic: General Comment Number: 8 01/24/2012 Comment Originated: 01/24/2012: Note should be added to project data on cover sheet that a maximum of 36 display models will be displayed on designated display spaces and excess inventory will be stored on the designated screened storage spaces. Topic: Landscape Plans Comment Number: 1 01/24/2012 Comment Originated: 01/24/2012: The 15' landscape strip along College Avenue needs trees/shrubs per Sec. 3.2.1(E)(4). Phase lines on site and landscape plans are difficult to determine for Phases 1-3. The phases should be delineated in a clearer manor. Comment Number: 7 Comment Originated: 01/24/2012 01/24/2012: Add a Planting Note stating that all landscaping and irrigation must be installed in each phase prior to the issuance of a certificate of occupancy for use of any building or property within that phase or, if not installed, must be guaranteed with a financial guarantee in the amount of 125% of a written estimate from a landscape contractor of the value of labor and 2/7/2012 •` 0 Page 5 of 7 02/01/2012 02/01/2012 plan. 02/01/2012 01 /23/2012 02/07/2012 of 02/07/2012 routed Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com Topic: General Comment Number: 1 Comment Originated: 02/01/2012: Electric development and system modification charges will apply. Please coordinate power requirements with Light & Power Engineering at (970)221-6700. Comment Number: 2 Comment Originated: 02/01/2012: Light & Power Engineering will need a paper copy (or pdf) of the final utility A pdf can be sent to Doug Martine at DMARTINE@FCGOV.COM. Comment Number: 3 Comment Originated: 02101/2012: Please send an AutoCad drawing of the final site plan to Terry Cox at TCOX@FCGOV.COM. Department: Park Planning Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com Topic: General Comment Number: 1 01/23/2012: No comments Comment Originated: Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, waamarque@fcgov.com Topic: General Comment Number: 1 Comment Originated: 02/0712012: The Development is required to detain half College Avenue along the frontage this site. These flows need to be routed into the detention pond. Comment Number: 2 Comment Originated: 02/07/2012: The site needs to detain basin 4 as well. These flows should be able to be 2/7/2012 into the inlet near the southern boundary of the site. Page 4 of 7 01 /27/2012 ability purposes to three) available palette). 01 /27/2012 (D) from over buffer 02/06/2012 Comment Number: 2 Comment Originated: 01/27/2012: Within the 50' buffer zone, according to Article 3.4.1(E)(1)(g), the City has the to determine if the existing landscaping within the buffer zone is incompatible with the of the buffer zone. The landscaping in the buffer zone, as currently proposed, in insufficient meet the standards of 3.4.1. For instance, the trees proposed within the buffer area (only are lacking both in quantity (we want more trees and shrubs throughout the entire site) and quality (the proposed trees are not native, please see the City's Native Plants Guide at hftp://www.fcgov.com/naturalareas/native—plants.php for a more appropriate plant Staff would be happy to meet with you to discuss these issues in more detail. Topic: Lighting Plan Comment Number: 1 Comment Originated: 01/2712012: With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4 (6) requires that "natural areas and natural features shall be protected from light spillage off —site sources." Thus, lighting from the parking areas or other site amenities shall not spill to the buffer areas. The lighting plan must not allow for any foot candle spillage into the zone, in addition to addressing zoning's comments below. Department: Historical Preservation Contact: Josh Weinberg, 970-221-6206, jweinberg@fcgov.com Topic: General Comment Number: Comment Originated: Building not yet 50 years old, so there is no historic preservation review. 2/7/2012 Department: Light And Power Page 3 of 7 and PDP—C1.1 B of the plan set show 33 & 34 spaces, respectively. Please identify the other 2 or 3 spaces. Comment Number: 3 02/06/2012 Comment Originated: 02/06/2012: There is so much line work on the 2 Site Plans and it makes it very difficult to read them. The utilities, curve radii, existing landscaping & notes, and possibly contours may be eliminated from these plans. Comment Number: 4 Comment Originated: 02/06/2012 02/06/2012: There is a lot of "line over" information on the Site Plans that must be eliminated. This makes certain areas of the plan illegible. Comment Number: 5 Comment Originated: 02/06/2012 02/06/2012: Is the pond in the southwest corner of the site really a "retention" pond, not a detention pond? Comment Number: 6 02/06/2012 Comment Originated: 02/06/2012: There are 2 described lines (metes & bounds) on the Site & Landscape Plans that are not shown on the Subdivision Plat. What are they for? Please see red —lined Site Plans. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: Construction Drawings Comment Number: 3 01 /27/2012 Comment Originated: 01/27/2012: The following notes/graphics will need to be added to the utility plan: 1. Please indicate the "limits of development' line, as per Section 3.4.1(N)(1) of the Land Use Code. 2. Please add the following note to the utility, site and landscape plans "See Section 3.4.1 of the Land Use Code for allowable uses within the buffer zone" 3. Please add an Environmental Planner signature to the signature blocks on the utility plans. Topic: Landscape Plans 2/7/2012 a Page 2 of 7 970.221.6750 970.224.6134 - fax fcgov.com/devo/0pmenfreview 0 - February 07, 2012 Don Shields WG Architects P.O. Box 270788 Fort Collins, CO 80527 RE: Legacy Auto, PDP120001, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Steve Olt, at 970-221-6341 or solt(a)fcoov.com. Comment Summary: Department: Current Planning Contact: Steve Olt, 970-221-6341, solt@fcgov.com 02/06/2012 Planning 02/06/2012 Topic: General Comment Number: 1 Comment Originated: 02/06/2012: Please better define "urban tractors" in the Description of Rationale in the Objectives. Topic: Site Plan Comment Number: 2 Comment Originated: 02/0612012: The Planning Objectives indicate 36 vehicle display spaces. Sheets PDP—C1.1A 2/7/2012 Page 1 of 7 Steve Olt From: Steve Olt Sent: Tuesday, February 07, 2012 10:34 AM To: 'dons@wgarchitects.com' Subject: FW: Legacy Auto PDP - staff review 2/08/12 Don, I am forwarding this message, with comments, on to you regarding Legacy Auto PDP. Sorry, I misspelled wgarchitects in your e-mail address when I previously sent the message. SAM Olt Steve Olt Project Planner From: Steve Olt Sent: Tuesday, February 07, 2012 10:29 AM To: 'LegacyTractors@yahoo.com'; 'dons@wgarchitercts.com' Cc: Lindsay Ex; Doug Martine; Wes Lamarque; Peter Barnes Subject: Legacy Auto PDP - staff review 2/08/12 Gary and Don, Attached is a "DRAFT" staff comment letter for your Legacy Auto PDP submittal. A meeting with you and staff for the first round of development review for the project will take place tomorrow morning, February 8th, at 8:30 a.m. in conference room A, 281 North College Avenue. Other comments will be available at the meeting and staff will provide you with "complete" comments for the first round by the end of the day Friday, February 1 Oth. Steve Olt City's Project Planner 970-221-6341 solt@fcgov.com Fort Collins Community Development and Neighborhood services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 2/7/2012