Loading...
HomeMy WebLinkAboutDIXON CREEK & TIMBERLINE SUBSTATIONS - SPAR - SPA120005 - CORRESPONDENCE - (12)r Department: Light And Power Contact: Doug Martine, 970.224.6152, dmartine(cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 08/20/2012 08/20/2012: The existing security beam pedestals and conduit must be protected and unobstructed during construction. Installation of a swale along the east side of the site (between the control house and fence) is suggested. The elevation of the site east of the control house is at a higher elevation that could be lowered, eliminating the need for a culvert in the swale. Contact Bob Hover at 221-6727, or cell phone 217-8109. Department: Park Planning Contact: Craig Foreman, 970.221.6618, cforemanOfcgov.com Topic: General Comment Number: 1 Comment Originated: 08/06/2012 O8/0612012: No comments Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221.6854, rbuffington0fcgov.com Topic: General �J Comment Number: 1 08/27/2012: No comments. O Comment Originated: 08/27/2012 Department: Engineering Development Review Contact: Sheri Langenberger, 970.221.6573, slangenbergerC�fcgov.com Topic: General Comment Number: 2 Comment Originated: 08/27/2012 08/31/2012: Timberline Substation I am okay with the wall installation location provided it is installed in the location shown on the Google map provided. The paper plans that just show the site need to show where the wall is to be located in reference to adjacent property lines and Timberline Road needs to be shown and labeled on the plans. Also need an address and legal description on the plans. Department: Environmental Planning Contact: Lindsay Ex, 970.224-6143, lex fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/04/2012 09/04/2012: Dixon Substation - Please describe how this proposal meets Section 3.8.11(A) of the Land Use Code which requires that the wall does not create a "tunnel" effect. Comment Number: 2 Comment Originated: 09/04/2012 09/04/2012: Dixon Substation - at the neighborhood�m\eting; ttheerre was extensive discussion surrounding landscaping on the east side as we�lll•as•the northeast and southeast corners to screen the property. One suggestion was also.to dadbould s to the corners and the front in N 1 �. order to blend the wall better into the site. -Another s suggestion was that additional landscaping should be provided on all side��fhe p, j\cty not lust the east. Please provide a revised landscaping plan that includes(the following: -Additional landscaping, e.g., evergreens,/specifically at the SE and NE project corners. -Additional landscaping on the w st side of the project. Alternatively, could you provide a rendering of the view to the west side of the wall to indicate that slopes or other features would allow the wall to blend in as it is. Comment Number: 3 Comment Originated: 09/04/2012 09/04/2012: Dixon Substation - Can a simulation be provided that not only depicts the proposed wall on the east side, but also the landscaping? Please ensure the proposed landscaping on the east side does not conflict with any future, proposed sidewalks for this area, as per Engineering's conceptual review comments. Comment Number: 4 Comment Originated: 09/04/2012 09/04/2012: Both stations - Is there a way we can work with you to create a base, middle, and top for each of the walls? I can provide images to illustrate what we are referring to and that would build off the discussion at the neighborhood meeting. Let's also further discuss how to articulate the height. Department: Light And Power Contact: Doug Martine, 970.224.6152, dmartine(cDfcgov.com Topic: General City Of Fort Collins September 05, 2012 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/deve/0pmentreview Send-- an t Mike Dahl Platte River Power Authority I s 1 o� ��r ? 2000 E. Horsetooth Rd W_aj Fort Collins, CO 80525 w r^hl ^Q` s; kc j,. dsc �\ a� -. Ur 4'�e. ba ` �—'� fle afiong? RE: Dixon Creek and Timberline Substation - Wall Project, SPA70005, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Lindsay Ex, at 970-224-6143 or lex@fcgov.com. Comment Summary: Department: Advance Planning Contact: Pete Wray, 970-221-6754, pwray(iDfcgov.com !appear Topic: General Comment Number: 1 Comment Originated: 08/21/2012 08/21/2012: Existing pine trees along Overland Tto be in decline. Consider adding additional landscaping/screening along street frontage to buffer wall, with or without existing trees. Department: Engineering Development Review Contact: Sheri Langenberger, 970.221-6573, slangenbergerna-fcpov.com Topic: General Comment Number: 1 Comment Originated: 08/27/2012 08/27/2012: Dixon Creek Substation. Provide that the wall is located as shown on the plans behind the landscaping I have no issues with the wall location. Comments on the two plan sheets provided: LS101 and LS101 1. Overland Trail needs to be identified and labeled on the plans. 2. Need an address and legal description on the plans. 3. There are sections identified on the plans, but sheet LS201 was not provided (at least not to me.)