HomeMy WebLinkAboutNEW PROSPECT - PDP - 4-10 - CORRESPONDENCE - (10)L. Lot Nine should be restricted from having a solid six foot fence
along the south property line as this line abuts a City of Fort
Collins Natural Area. If you have any questions regarding the
City -owned property, please contact Mark Sears, 416-2096.
0
A. The site is contained within the East Prospect — Spring Creek
Sub -area Plan. The conceptual plan complies in that Apex
Drive is extended into the subject site.
B. A vehicular connection into Prospect Commons to the west is
not required. However, bicycle and pedestrian connections
should be made. According to the plat of Prospect Commons,
there are four opportunities to make such connections. These
are the Pitkin Lateral Irrigation Ditch and Pipe easement, the
sanitary sewer easement, and the pedestrian, bicycle and
maintenance vehicle access easement. Note that irrigation
ditch easement and Tract A are closest to the future alignment
of Apex Drive and would provide the most convenient east/west
circulation without having to use either Prospect Road or the
Spring Creek Trail.
C. A connection should be made to the Spring Creek Trail.
Otherwise, an informal path will evolve without the benefit of a
hard surface or owner's permission.
D. Lot 22 looks severely impacted by the existing sanitary sewer
easement.
E. Pockets of guest parking should be scattered throughout the
project.
F. A small area should be set aside for the U.S. Postal Service
mail delivery cluster box. This area could also be used to post
notices for H.O.A. meetings and other announcements.
G. Areas outside the lots that are to be held in common must be
placed within a specific tract. The purpose and long term
maintenance of each tract must be stated on the plat.
H. Street lighting on the private drives will be the responsibility of
the developer.
Street trees are required along all public streets and should be
provided along the private drives for continuity.
J. The Pitkin Lateral owners may need to sign the plat.
K. A plat note should be provided stating that the long term
maintenance, street -cleaning, snow removal and re -surfacing of
the private drives and walkways will be the responsibility of the
H.O.A., not the City of Fort Collins.
L✓
prior to the acceptance of completed improvements and/or prior to the
issuance of the first Certificate of Occupancy.
L. Utility plans will be required for this project. A development
agreement will be done with this project. A Development Construction
Permit (DCP) will need to be obtained prior to starting any work on the
site. For further information, please contact Susan Joy, 221-6581.
7. The following comments are provided Matt Wempe, Transportation
Planner:
A. A bicycle/pedestrian connection should be made to the Spring
Creek Trail either directly or indirectly.
B. Ellis Street will become the new pick-up/drop-off area for Lesher
Junior High School. This will put more traffic at the Prospect
Road / Ellis Street intersection. This traffic should be
considered in the T.I.S.
C. The proposed private drive will need sidewalks. Sidewalks
should either be attached with a six foot width or detached with
a 4.5 foot width.
8. The following comments are provided by the Historic Preservation
Department:
A. The owner should provide good photographs of all 4 sides of the building
and any other buildings 50 years or older that would be affected by the
project to help determine if it (they) are eligible for local landmark
designation. This determination of eligibility will be made within two
weeks of receiving this information.'
B. If this or any nearby property is considered eligible, we will review the
development project to ensure it is compatible with the nearby historic
property.
C. If any properties individually eligible for local landmark designation exist
within the development site, these properties should be included within
the development plans.
D. If this or other nearby property is not individually eligible for landmark
designation, we will have no comment on the project. For further
information, please contact Pam Opiela, 221-6597.
9. The following comments are from Current Planning:
VA
aligned intersections along Prospect Road with Mathews Street,
Peterson Street, Whedbee Street and Stover Street.
C. Larimer County Road Impact Fees and Street Oversizing Fees are due
at the time of building permit. Please contact Matt Baker at 224-6108 if
you have any questions.
D. Please contact Joe Olson and Transportation Planning to schedule a
scoping meeting and determine if a traffic study is needed for this
project. Also need to discuss the separation distance between Ellis
and this subdivision's intersection. A variance request will need to be
submitted in accordance with 1.9.4 before the alignment can be
determined.
E. No structures of any kind are allowed in easements.
F. This project will be obligated to provide access to the property to the
northwest. And, if this property has a private driveway intersecting with
Prospect Road, and alternative access is provided via Apex Drive, then
the Traffic Operations Department may consider closing this driveway.
G. Please contact Transportation Planning to determine how many
bicycle/pedestrian connections to the west will be required to meet
minimum bicycle and pedestrian level of service requirements.
H. Any public improvements must be designed and built in accordance
with the Larimer County Urban Area Street Standards (LCUASS).
This project is responsible for dedicating any right-of-way and
easements that are necessary for this project. A local street has 51-
53' of right-of-way, plus a 9' Utility Easement. This will need to match
the right-of-way and curb and gutter type that the development to the
east has designed on their property. Prospect Road is considered a
constrained arterial which requires 102' of r.o.w. of which this
development is responsible for dedicating half (51) from the centerline,
plus a 15' Utility Easement.
J. Transportation Development Review Fee (TDRF) is due at the time of
submittal. For additional information on these fees, please see
http://www.fcqov.com/engineering/dev-review.php
K. Any damaged curb, gutter and sidewalk existing prior to construction,
as well as streets, sidewalks, curbs and gutters, destroyed, damaged
or removed due to construction of this project, shall be replaced or
restored to City of Fort Collins standards at the Developer's expense
t•
structures are three or more stories.in height).
➢ If the building is equipped throughout with an approved automatic fire -
sprinkler system, the fire code official is authorized to increase the
dimension of 150 feet.
B. CUL-DE-SAC
A dead-end street cannot exceed 660 feet in length. The turn -around at the end
of the street must have an outside turning radius of 50 feet or more, and an
inside turning radius of 25 feet. Short fire lanes are permitted to facilitate a
second point of access when the street is longer than 660 feet. All structures
beyond the 660-foot limit shall be fire sprinklered if a second point of
access cannot be provided.
C. WATER SUPPLY
Fire hydrants must be the type approved by the City Water Utility and the Fire
Department. Hydrant spacing and water flow must meet minimum requirements
based on type of occupancy. Minimum flow and spacing requirements include:
1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the
building, on 800-foot centers thereafter. These requirements may be modified if
buildings are equipped with automatic fire sprinkler systems.
D. ADDRESS NUMERALS
Address numerals shall be visible from the street fronting the property, and
posted with a minimum six-inch high numerals on a contrasting background.
(Bronze numerals on brown brick are not acceptable).
E. STREET NAMES
Street names shall be reviewed and verified by LETA (Larimer Emergency
Telephone Authority) prior to being put in service. When a roadway turns 90
degrees, a new, separate, unique street name is required. For further
information, please contact Carie Dann, 219-5337.
6. The following comments are from Engineering:
A. The proposed intersection with Prospect Road, an arterial street, is
required to be no less than 460 feet from the nearest intersection. If
this separation cannot be achieved, then a variance must be submitted
to the City of Fort Collins Engineering Department.
B. Staff is concerned that the new intersection will not align with Ellis
Street on the north side of Prospect. Note that there are already non-
W
impervious area. This fee is to be paid at the time the building
permit is issued. For further information, please contact Glen
Schlueter, 224-6065.
4. The following comments are from the Water and Wastewater Utility:
A. Existing mains: 8-inch water and 6-inch sewer in Prospect; 24-inch and
30-inch sewer trunk lines in an easement crossing the southern portion of
this site.
B. Easements for the 24 and 30-inch trunk lines must be 15 feet each side of
the sewer centerlines.
C. Any connections to the sewer trunk lines must be made at a manhole.
D. If 811 Prospect is included in the project, the new water mains must
connect to the existing main in Apex.
E. Development fees and water rights will be due at building permit. For
further information, please contact Roger Buffington, 221-6854.
5. The following comments are from the Poudre Fire Authority:
A. REQUIRED ACCESS
Fire access roads shall be provided for every building when any portion of the
building is located more than 150 feet from fire apparatus access as
measured by an approved route around the exterior of the building or facility.
This fire lane shall be visible by painting and signage, and maintained
unobstructed at all times. A fire lane plan shall be submitted for approval
prior to installation. In addition to the design criteria already contained in
relevant standards and policies, any new fire lane must meet the following
general requirements:
➢ Be designed as a flat, hard, all-weather driving surface (asphalt or
concrete) capable of supporting fire apparatus weights. Compacted road
base shall be used only for temporary fire lanes or at construction sites.
➢ Have appropriate maintenance agreements that are legally binding and
enforceable.
➢ Be designated on the plat as an Emergency Access Easement.
➢ Maintain the required minimum width of 20 feet throughout the length of
the fire lane (30 feet on at least one long side of the building when the
4
3. The following comments are from the Stormwater Utility:
A. The southeast corner of this property is located in the FEMA-
regulatory flood fringe and floodway of Spring Creek and is subject
to the requirements of Chapter 10 of City Code.
B. No residential structure may be constructed in the floodway. All
other floodway development, including fill, excavation, fencing,
landscaping, detention features, and others, must be certified to
cause no -rise in the base flood elevation (BFE).
C. _ New residential construction touching the flood fringe at any point
will be considered to be in the floodplain. Residential structures in
the flood fringe must have the lowest floor and all utilities/HVAC
elevated 18 inches above the BFE. New basements may not be
constructed if the home touches the flood fringe.
D. No new critical facility may be constructed in the flood fringe or
floodway.
E. The Floodplain Administrator for the Spring Creek basin is Brian
Varrella (416-2217).
F. A drainage and erosion control report and construction plans are
required and must be prepared by a Professional Engineer
registered in Colorado.
G. Onsite detention is required with a 2 year historic release rate for
water quantity. Parking lot detention for water quantity is allowed
as long as it is not deeper than one foot.
H. Water quality treatment is also required as described in the Urban
Storm Drainage Criteria Manual, Volume 3 — Best Management
Practices (BMPs). The use of all BMPs is encouraged.
I. An easement is needed from the site to the low flow channel of
Spring Creek for the detention pond outfall. Generally the
easement width is 20 feet.
J. The design of this site must conform to the drainage basin design
of the Spring Creek Drainage Master Drainage Plan as well the
City's Design Criteria and Construction standards.
K. The city-wide development fee is $4,420/acre ($0.1015/sq.ft.) for
new impervious area over 350 sq.-ft. No fee is charged for existing
3
Forof
t` Collins
ITEM: 805 East Prospect Road
MEETING DATE: June 29, 2009
CONCEPTUAL REVIEW
APPLICANT: Dan Tweeton, 1500 Luke Street, Fort Collins, CO
80524.
LAND USE DATA: This is a request to subdivide the properties at 805,
807 and possibly 811 East Prospect Road into 29 lots for single family detached
dwelling units. The properties are located on the south side of East Prospect
Road, north of Spring Creek and east of Stover Street. The properties contain
existing houses which are likely to remain. A street stub is provided along the
east property line for the extension of Apex Drive into the site. The area between
the south property line and Spring Creek is owned by the City of Fort Collins
Natural Areas Program.
COMMENTS:
1. The property is zoned L-M-N, Low Density Planned Residential. The
proposed density of 6.07 dwelling units per acre complies with density
standard. Single family detached dwellings are permitted subject to
Administrative (Type One) review. A plat will be required. A landscape
plan will be required and be sure to include street trees in the parkway.
2. The site will be served electrical power by the City of Fort Collins Utilities.
Power exists along East Prospect and there is conduit stubbed along
Apex Drive coming from the east. Due to site constraints, we may need to
have a utility coordination meeting to make sure all utilities have a place to
be properly installed meeting minimum clearances. Normal development
fees will apply. For further information, please contact Janet McTague,
224-6154.
Current Planning 281 N Coll ge Ave - PO Box 580 - Fort Collins, CO 80522-0580
fcgov.com/currentplanning 970.221.6750
City of
F6rt Collins
July 14, 2009
Dan Tweeton
1500 Luke Street
Fort Collins, CO 80524
Dear Dan:
Planning, Development and
Transportation Services
Current Planning
281 N. College Ave.
PO Box 580
Fort Collins, CO 80522-0580
970.221.6750
970.224.6134 - fax
fcgov. com/currentplanning
For your information, attached is a copy of the Staffs comments for 805, 807 and
possibly 811 East Prospect Road which was presented before the Conceptual
Review Team on June 29, 2009.
The comments are offered by staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these
comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 970-221-6750.
Sincerely,
T-'4AA1UA
Ted Shepard
Chief Planner