HomeMy WebLinkAboutENGINES & ENERGY CONVERSION LAB - BDR - BDR120006 - CORRESPONDENCE - REVISIONSComment Number: 13 Comment Originated: 09/19/2012
09/19/2012: See redlined utility plans for additional minor comments.
Topic: General
Comment Number: 5
09/19/2012:
Comment Originated: 08/06/2012
08/06/2012: Will an easement be needed on the south side of the railroad property for the
sewer connection?
Comment Number: 6 Comment Originated: 08/06/2012
09/19/2012:
08/06/2012: Railroad crossing permit/license will be required.
Comment Number: %_,nment Originated: 08/01/2012
08/01/2012: The 100 year flows may overtop the curb at the gravel turn -around location.
Please provide documentation showing these flows will make the corner into the water quality
pond or revise design.
Comment Number: 3 Comment Originated: 08/01/2012
08/01/2012: Please provide a cleanout for the water quality swale outfal pipe at the southern
most bend.
Comment Number: 4
Comment Originated: 08/01/2012
08/01/2012: Please add a detail for the inlet and by-pass located at the low end of the water
quality swale.
Comment Number: 5 Comment Originated: 08/01/2012
08/01/2012: Please add a note for the connection of the pvc pipe and the inlet on College
Avenue. Note should include core -drilling the inlet and grouting around the new pipe.
Department: Technical Services
Contact: Jeff County, 970-221.6588, jcountyC�fcgov.com
Topic: Building Elevations
Comment Number: 3 Comment Originated: 08/06/2012
09/1812012: This has not been corrected.
08/06/2012: There are a few line over text issues.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221-6854, rbuffington .fcgov.com
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 09/19/2012
09/19/2012: There is an existing 6" valve that is not shown on the utility plans. This valve is on
the 6" line that extends to the old power plant building. See the redlined plans for the general
location. (One of the Neenan people was working to get this located in the field.)
Comment Number: 8 Comment Originated: 09/19/2012
09/19/2012: The fire hydrant at the end of the new water main is to be installed in accordance
with the standard detail using a swivel tee.
Comment Number: 9
Comment Originated: 09/19/2012
09/19/2012: The existing water main extending into the site from College Avenue is a 6" main.
It is labeled as an 8" on the demolition plan.
Comment Number: 10 Comment Originated: 09/19/2012
09/19/2012: Update the sewer service drawing with the revised routing and pump station
location.
Comment Number: 11 Comment Originated: 09/19/2012
09119/2012: Is a separate irrigation tap planned for the project?
Comment Number: 12 Comment Originated: 09/19/2012
09/19/2012: HDPE maybe used for the 2" water service if desired.
Topic: Landscape Plari_
Comment Number: 1
Comment Originated: 08/03/2012
09/18/2012: The revised landscape plan includes wetland plugs, but only specifies one
species of plugs - is there an option for a more diverse suite of species?
08/03/2012: Regarding the wetland species proposed in the detention area, the only time City
staff has observed great success with the plantings is when plugs are used and not broadcast
seed. Plugs should be designed at 12" O.C. but can be 24" O.C. if they are larger in size.
Comment Number: 5 Comment Originated: 08/03/2012
09/18/2012: This comment has not been addressed in the revised submittal.
08/03/2012: The shrubs within the Natural Habitat Buffer Zone are a bit uniform. Consider mixing
up the species variety within the clumps.
Topic: Reports - Soils, Subdrain
Comment Number: 9
Comment Originated: 08/03/2012
09/18/2012: The standard warranty period for buffer zone landscape planting is 3 years, but this
can be addressed at the time of the Development Agreement.
08/03/2012: Staff appreciates the long management implications outlined in the ECS. As the
project proceeds through to construction (should it gain approval), staff will require a weed
management plan and a landscape bond for the Natural Habitat Buffer Zone to ensure this area
achieves its design objectives.
Staff also cautions the applicant in selecting a landscaping company that is proficient in
establishing and maintaining native landscapes to increase the site's success.
Department: Light And Power
Contact: Alan Rutz, 970.224-6153, arutza)fcgov.com
Topic: General
Comment Number: 3
Comment Originated: 08/03/2012
08/03/2012: If addition is being served from the existing transformers, contact Light and Power
to discuss load requirements. Submit C-1 form, Panel Schedule and One Line Diagram.
Contact: Doug Martine, 970.224-6152, dmartineaPfcgov.com
Topic: General
Comment Number: 5
Comment Originated: 09/18/2012
09/18/2012: Light & Power Engineering will need a 1-line diagram of the electric service,
including the planned fire booster pump. Also an AutoCad drawing (version 2008) of the site
showing the planned addition needs to be sent to Terry Cox at TCOX@FCGOV.COM. Please
contact Doug Martine at (970)224-6152 with any questions.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970.416.2418, wlamargueofcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/01/2012
08/01/2012: Please clarify where the soil media for the water quality features will be used on
the grading plan with dimensions, etc.
any project. Pla, Al need to be routed to CDOT for review G. approval and the applicant
may need to obtain access permits from CDOT
Comment Number: 9
Comment Originated: 09/18/2012
09/18/2012: North Weld County Water District will need to sign off on sheets C2 and C2.01
regarding the proposed sanitary sewer service line A crossing.
Comment Number: 10 Comment Originated: 09/18/2012
09/18/2012: Please revise General Note #5 to read:
All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry"
utility installations, shall conform to the City of Fort Collins standards and specifications current
at the date of approval of the plans by the City of Fort Collins Engineer.
Comment Number: 11 Comment Originated: 09/18/2012
09/18/2012: Please revise General Note #34 to reference the City of Fort Collins instead of
Larimer County.
Comment Number: 12
Comment Originated: 09/18/2012
09/18/2012: On Sheet C2.01 you reference 16 inch steel casing under the BNRR easement for
the sanitary sewer service but on the sanitary sewer line A cross section you call for 4 inch
steel casing. Please revise
Comment Number: 13 Comment Originated: 09/18/2012
09/18/2012: Please update the pavement detail on sheet C5 to reference on-site/private work
only.
Comment Number: 14 Comment Originated: 09/18/2012
09/18/2012: Please add LCUASS sidewalk detail 1601
Topic: General
Comment Number: 7 Comment Originated: 09/18/2012
09/18/2012: The utility alignment and sanitary sewer easement dedication documents have
been received with this submittal. Please pay the Transportation Development Review Fee of
$500 to process by separate document. This process will not start until the associated fees
have been paid.
Comment Number: 8 Comment Originated: 09/18/2012
09/18/2012: An additional temporary agreement/easement from the Burlington Northern railroad
is needed for the proposed grading and asphalt removal in BNRR right of way.
Department: Environmental Planning
Contact: Lindsay Ex, . 970-224-6143, lex aa)fcgov.com
Topic: General
Comment Number: 11
Comment Originated: 09/20/2012
09120/2012: The project has requested alternative compliance to the lighting standards. In the
areas where the lighting spills over into the buffer zone, please add additional plantings to help
screen out this light, e.g., fastigiate spruces or other evergreen species that will ensure the
minimum amount of lighting spills over.
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134 - fax
fcgov. con7/developmentreview
September 20, 2012
Angela Milewski
BHA Design, Inc.
1603 Oakridge Drive
Fort Collins, CO 80525
RE: Engines & Energy Conversion Lab, BDR120006, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or
tshepard@fcgov.com.
Comment Summary:
Department:, Current Planning
Contact: Ted Shepard, 970-221.6343, tshepard(a)fcaov.com
Topic: General
Comment Number: 1 Comment Originated: 09/20/2012
09/2012012: The shadow analysis indicates compliance with Section 3.5.1(G) -Building Height
Review.
Comment Number: 2 Comment Originated: 09/20/2012
09/20/2012: The Lighting Plan complies with Sections 3.4.7 - Historic and Cultural Resources -
New Construction and Section 3.2.4(E) - Site Lighting - Alternative Compliance.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmunda(�.fcgov.com
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 08/03/2012
09/18/2012: Please provide a copy of the signed access control plan approved by CDOT
08/03/2012: This site is adjacent to CDOT roadway and all access to the site is governed by an
access control plan. The access control plan will need to be followed and implemented with