HomeMy WebLinkAboutENGINES & ENERGY CONVERSION LAB - BDR - BDR120006 - CORRESPONDENCE - REVISIONSComment Number: 13 Comment Originated: 09/19/2012 09/19/2012: See redlined utility plans for additional minor comments. Topic: General Comment Number: 5 09/19/2012: Comment Originated: 08/06/2012 08/06/2012: Will an easement be needed on the south side of the railroad property for the sewer connection? Comment Number: 6 Comment Originated: 08/06/2012 09/19/2012: 08/06/2012: Railroad crossing permit/license will be required. Comment Number: %_,nment Originated: 08/01/2012 08/01/2012: The 100 year flows may overtop the curb at the gravel turn -around location. Please provide documentation showing these flows will make the corner into the water quality pond or revise design. Comment Number: 3 Comment Originated: 08/01/2012 08/01/2012: Please provide a cleanout for the water quality swale outfal pipe at the southern most bend. Comment Number: 4 Comment Originated: 08/01/2012 08/01/2012: Please add a detail for the inlet and by-pass located at the low end of the water quality swale. Comment Number: 5 Comment Originated: 08/01/2012 08/01/2012: Please add a note for the connection of the pvc pipe and the inlet on College Avenue. Note should include core -drilling the inlet and grouting around the new pipe. Department: Technical Services Contact: Jeff County, 970-221.6588, jcountyC�fcgov.com Topic: Building Elevations Comment Number: 3 Comment Originated: 08/06/2012 09/1812012: This has not been corrected. 08/06/2012: There are a few line over text issues. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221-6854, rbuffington .fcgov.com Topic: Construction Drawings Comment Number: 7 Comment Originated: 09/19/2012 09/19/2012: There is an existing 6" valve that is not shown on the utility plans. This valve is on the 6" line that extends to the old power plant building. See the redlined plans for the general location. (One of the Neenan people was working to get this located in the field.) Comment Number: 8 Comment Originated: 09/19/2012 09/19/2012: The fire hydrant at the end of the new water main is to be installed in accordance with the standard detail using a swivel tee. Comment Number: 9 Comment Originated: 09/19/2012 09/19/2012: The existing water main extending into the site from College Avenue is a 6" main. It is labeled as an 8" on the demolition plan. Comment Number: 10 Comment Originated: 09/19/2012 09/19/2012: Update the sewer service drawing with the revised routing and pump station location. Comment Number: 11 Comment Originated: 09/19/2012 09119/2012: Is a separate irrigation tap planned for the project? Comment Number: 12 Comment Originated: 09/19/2012 09/19/2012: HDPE maybe used for the 2" water service if desired. Topic: Landscape Plari_ Comment Number: 1 Comment Originated: 08/03/2012 09/18/2012: The revised landscape plan includes wetland plugs, but only specifies one species of plugs - is there an option for a more diverse suite of species? 08/03/2012: Regarding the wetland species proposed in the detention area, the only time City staff has observed great success with the plantings is when plugs are used and not broadcast seed. Plugs should be designed at 12" O.C. but can be 24" O.C. if they are larger in size. Comment Number: 5 Comment Originated: 08/03/2012 09/18/2012: This comment has not been addressed in the revised submittal. 08/03/2012: The shrubs within the Natural Habitat Buffer Zone are a bit uniform. Consider mixing up the species variety within the clumps. Topic: Reports - Soils, Subdrain Comment Number: 9 Comment Originated: 08/03/2012 09/18/2012: The standard warranty period for buffer zone landscape planting is 3 years, but this can be addressed at the time of the Development Agreement. 08/03/2012: Staff appreciates the long management implications outlined in the ECS. As the project proceeds through to construction (should it gain approval), staff will require a weed management plan and a landscape bond for the Natural Habitat Buffer Zone to ensure this area achieves its design objectives. Staff also cautions the applicant in selecting a landscaping company that is proficient in establishing and maintaining native landscapes to increase the site's success. Department: Light And Power Contact: Alan Rutz, 970.224-6153, arutza)fcgov.com Topic: General Comment Number: 3 Comment Originated: 08/03/2012 08/03/2012: If addition is being served from the existing transformers, contact Light and Power to discuss load requirements. Submit C-1 form, Panel Schedule and One Line Diagram. Contact: Doug Martine, 970.224-6152, dmartineaPfcgov.com Topic: General Comment Number: 5 Comment Originated: 09/18/2012 09/18/2012: Light & Power Engineering will need a 1-line diagram of the electric service, including the planned fire booster pump. Also an AutoCad drawing (version 2008) of the site showing the planned addition needs to be sent to Terry Cox at TCOX@FCGOV.COM. Please contact Doug Martine at (970)224-6152 with any questions. Department: Stormwater Engineering Contact: Wes Lamarque, 970.416.2418, wlamargueofcgov.com Topic: General Comment Number: 1 Comment Originated: 08/01/2012 08/01/2012: Please clarify where the soil media for the water quality features will be used on the grading plan with dimensions, etc. any project. Pla, Al need to be routed to CDOT for review G. approval and the applicant may need to obtain access permits from CDOT Comment Number: 9 Comment Originated: 09/18/2012 09/18/2012: North Weld County Water District will need to sign off on sheets C2 and C2.01 regarding the proposed sanitary sewer service line A crossing. Comment Number: 10 Comment Originated: 09/18/2012 09/18/2012: Please revise General Note #5 to read: All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. Comment Number: 11 Comment Originated: 09/18/2012 09/18/2012: Please revise General Note #34 to reference the City of Fort Collins instead of Larimer County. Comment Number: 12 Comment Originated: 09/18/2012 09/18/2012: On Sheet C2.01 you reference 16 inch steel casing under the BNRR easement for the sanitary sewer service but on the sanitary sewer line A cross section you call for 4 inch steel casing. Please revise Comment Number: 13 Comment Originated: 09/18/2012 09/18/2012: Please update the pavement detail on sheet C5 to reference on-site/private work only. Comment Number: 14 Comment Originated: 09/18/2012 09/18/2012: Please add LCUASS sidewalk detail 1601 Topic: General Comment Number: 7 Comment Originated: 09/18/2012 09/18/2012: The utility alignment and sanitary sewer easement dedication documents have been received with this submittal. Please pay the Transportation Development Review Fee of $500 to process by separate document. This process will not start until the associated fees have been paid. Comment Number: 8 Comment Originated: 09/18/2012 09/18/2012: An additional temporary agreement/easement from the Burlington Northern railroad is needed for the proposed grading and asphalt removal in BNRR right of way. Department: Environmental Planning Contact: Lindsay Ex, . 970-224-6143, lex aa)fcgov.com Topic: General Comment Number: 11 Comment Originated: 09/20/2012 09120/2012: The project has requested alternative compliance to the lighting standards. In the areas where the lighting spills over into the buffer zone, please add additional plantings to help screen out this light, e.g., fastigiate spruces or other evergreen species that will ensure the minimum amount of lighting spills over. City of Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov. con7/developmentreview September 20, 2012 Angela Milewski BHA Design, Inc. 1603 Oakridge Drive Fort Collins, CO 80525 RE: Engines & Energy Conversion Lab, BDR120006, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or tshepard@fcgov.com. Comment Summary: Department:, Current Planning Contact: Ted Shepard, 970-221.6343, tshepard(a)fcaov.com Topic: General Comment Number: 1 Comment Originated: 09/20/2012 09/2012012: The shadow analysis indicates compliance with Section 3.5.1(G) -Building Height Review. Comment Number: 2 Comment Originated: 09/20/2012 09/20/2012: The Lighting Plan complies with Sections 3.4.7 - Historic and Cultural Resources - New Construction and Section 3.2.4(E) - Site Lighting - Alternative Compliance. Department: Engineering Development Review Contact: Tyler Siegmund, 970-221-6501, tsiegmunda(�.fcgov.com Topic: Construction Drawings Comment Number: 4 Comment Originated: 08/03/2012 09/18/2012: Please provide a copy of the signed access control plan approved by CDOT 08/03/2012: This site is adjacent to CDOT roadway and all access to the site is governed by an access control plan. The access control plan will need to be followed and implemented with