HomeMy WebLinkAboutBROOKDALE SENIOR LIVING - PDP - PDP120014 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWAcknowledged.
If you have any comments or questions please contact me at (970) 217-4911.
Sincerely,
JR Engineering, LLC
Michael S. Brake, P.E.
4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a
scoping meeting and determine if a traffic study is needed for this project. In
addition, please contact Transportation Planning for their requirements as well.
5. Any public improvements must be designed and built in accordance with the
Larimer County Urban Area Street Standards (LCUASS). They are available
online at: httA://www.larimer.orglengineerinp/GMARdStds/UrbanSt.htm
Acknowledged.
6. This project is responsible for dedicating any right-of-way and easements that
are necessary for this project. Currently it appears that easements for utility
and/or drainage might be required for the proposal.
Proposed easements are included on the replat of the properties.
7. Street cuts to Lemay Avenue and/or Rule Drive will require a street cut permit
with pavement impact fees assessed per the fee schedule established in the
permit.
Acknowledged.
8. Construction plans (or revisions to previously approved construction plans) will
be required.
Construction plans for the site improvements have been prepared.
9. There are two different approvals of record comprising the overall site,
Wovenhearts Memory Care on the east half and Sterling House PUD on the west
half. It may be required to either have a new development agreement common to
both properties or amend both existing development agreements. In either
scenario the document(s) will need to be recorded at Larimer County once the
project is finalized with recordation fees required from the applicant.
Acknowledged.
10. If the applicant seeks to replat the property (or if the review process requires the
replat), and a development agreement isn't required as noted in the previous
comment, a note should be added to the replat indicating that the previous
development agreements for Wovenhearts Memory Care and Sterling House
PUD shall apply to the replat, just to ensure that the development agreements
are still considered valid with having the underlying properties replatted.
A replat is being processed and the above requirements will be added to
the cover sheet.
11. A Development Construction Permit (DCP) and/or excavation permit may need to
be obtained prior to starting any work on the site.
The applicant should make note of Article 3.2.1(C) that requires developments to
submit plans that "..(4) protects significant trees, natural systems, and habitat".
Note that a significant tree is defined as a tree having DBH (Diameter at Breast
Height) of six inches or more. If any trees on site have a DBH of greater than six
inches, a review of the trees shall be conducted with Tim Buchanan, City
Forester (221-6361) to determine the status of the existing trees and any
mitigation requirements as the result of development impacts.
A field visit has been conducted with Tim Buchanan and the results
incorporated into the proposed landscape plans.
2. With respect to landscaping and design, the City of Fort Collins Land Use Code,
in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses in your
landscaping or re -landscaping and reduce bluegrass lawns as much as possible.
Acknowledged, refer to landscape plans.
3. The City's green building program has many programs that may benefit your
project. Resources are available at the Green Building web page:
http.//wwwfcgov.com/greenbuilding/. Of particular interest maybe the Integrated
Design Assistance Program, which offers financial incentives and free technical
support to those interested in delivering high-performance buildings that exceed
building code requirements for energy performance. Gary Schroeder (970-221-
6395) is the contact person for this program. This is the direct link to the web
page for this program: http.//www.fcgov.com/conservation/biz-idap.php.
Acknowledged.
Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the
time of building permit. Please contact Matt Baker at 224-6108 if you have any
questions.
Acknowledged.
2. The City's Transportation Development Review Fee (TDRF) is due at the time of
submittal. For additional information on these fees, please see:
http://www. fcpov. com/engineering/dev-review.php
Acknowledged.
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as
streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to
construction of this project, shall be replaced or restored to City of Fort Collins
standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
Acknowledged.
An exhibit for the existing and proposed impervious areas has been
included in the drainage report.
2. A drainage and erosion control report and construction plans are required and
must be prepared by a Professional Engineer registered in Colorado.
A drainage and erosion control report and construction plans have been
submitted to the city for review.
3. In the McClellands drainage basin, onsite detention is required with a 0.2 cfs/ac
release rate for the 10 year storm and a 0.5 cfs/ac release rate for the 100 year
storm. The existing onsite detention may be modified to meet the detention
requirements. Parking lot detention for water quantity is allowed as long as it is
not deeper than one foot.
Acknowledged.
4. Water quality treatment is required as described in the Urban Storm Drainage
Criteria Manual, Volume 3 - Best Management Practices (BMPs). Extended
detention is the usual method selected for water quality treatment; however the
use of any of the BMPs is encouraged.
(http://www.udfcd.org/downloads✓down critmanual vollll.htm) The existing
detention pond and outlet structure can be modified to treat the runoff from the
new impervious areas.
Water quality has been designed into the existing ponds and modifications
have been indicated in the construction plans.
5. The design of this site must conform to the drainage basin design of the
McClellands Creek Master Drainage Plan as well the City's Design Criteria and
Construction standards.
Acknowledged.
6. The Stormwater development fee (PIF) is $6, 313.00/acre ($0.1449/sq.ft.) for new
impervious area over350 sq.-ft. In addition, there is a $1,045.00/acre
($0.024/sq.ft.) review fee. No fee is charged for existing impervious area. These
fees are to be paid at the time each building permit is issued. Information on fees
can be found on the City's web site at
http.//www. fcgov. com/Utilitieslbusinesslbuilders-and-developers/plant-
investment-development-fees or by contacting Jean Pakech at 221- 6375. There
is also an erosion control escrow required before the Development Construction
Permit is issued. The amount of the escrow is determined by the design engineer
and is based on the site disturbance area or erosion control measures shown on
the site construction plans.
Acknowledged.
Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Ms. Courtney Rippy
- -City-of-Fort Collins -- - - - - - - - - --
Community Development
281 North College Avenue
Fort Collins, CO 80522
RE: Response To June 8, 2011 Conceptual Review Team Comments
Dear Ms. Rippy:
This letter is in response to your Conceptual Review Comments from June 8, 2011. Our
responses in bold font follow your comments in italics.
Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
1. Existing water mains and sanitary sewers in the area include an 8-inch water
main and an 8-inch sewer in Rule, an 8-inch water main in the property to the
west and a 20-inch water main in Lemay.
Acknowledged.
2. The existing water services to the existing buildings include 2-inch domestic
services and 6-inch fire lines to each building (1002 Rule and 1008 Rule).
Acknowledged.
3. If an additional kitchen is planned, a grease interceptor will be required.
Acknowledged.
4. If additional or larger water services are needed, development fees and water
rights will be due at building permit.
Acknowledged.
Stormwater Engineering
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
1. It is important to document the existing impervious area since drainage
requirements and fees are based on new impervious area. An exhibit showing
the existing and proposed impervious areas is required.
i
PLANNING �.
DESIGN
FD CONSTRUCTION
signs is recommended. This can be done electronically such as with LEDs or
manual message board. Ground signs currently being evaluated
Respectfully submitted:
Edward Johnson, AA, ALA
Project Architect
ARCHITECTURE
PLANNING
INTERIORS
CONSTRUCTION
DEVELOPMENT
FCDPLANNING
DESIGN
CONSTRUCTION
2. REQUIRED ACCESS
Fire access roads (fire lanes) shall be provided for every facility, building or portion of
a building hereafter constructed or moved into or within the PFA's jurisdiction when
any portion of the facility or any portion of an exterior wall of the first story of the
building is located more than 150 feet from fire apparatus access as measured by an
approved route around the exterior of the building or facility. This fire lane shall be
visible by painting and signage, and maintained unobstructed at all times. A fire lane
plan shall be submitted for approval prior to installation. In addition to the design
criteria already contained in relevant standards and policies, any new fire lane must
meet the following general requirements:
4 Be designed as a flat, hard, all-weather driving surface (asphalt or concrete)
capable of supporting fire apparatus weights. Compacted road base shall be used
only for temporary fire lanes or at construction sites.
6 Have appropriate maintenance agreements that are legally binding and
enforceable.
i Be designated on the plat as an Emergency Access Easement.
6 Maintain the required minimum width of 20 feet throughout the length of the fire
lane (26 feet on at least one long side of the building when the structure is three or
more stories in height).
If the building is equipped throughout with an approved automatic fire -sprinkler
system, the fire code official is authorized to increase the dimension of 150 feet.
Please note, the existing private drives/drive aisles are required to be dedicated as
an Emergency Access Easement. This was not done on the original plat.
2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D; FCLUC
3.6.2(L) Acknowledged, JR Engineering has met with the Fire Authority to review design
and has obtained preliminary approval of proposed design and all comments as listed in
these staff review comments.
3. HYDRANT
An additional hydrant will likely have to be added, as the two existing hydrants on
Rule Drive do not meet minimum Fire Code requirement for distance from hydrant to
building. Acknowledged, a new hydrant has been added.
Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
ARCHITECTURE 1 As to approval process Current Planning will make the decision if this project is
PLANNING reviewed as a major amendment or minor amendment as the development was a
PUD. Acknowledged, this project is a major amendment
INTERIORS 2. The Landscape Plan should indicate trees being removed so that some
mitigation of their removal can be decided. Acknowledged, site plan will indicate all
CONSTRUCTION tree mitigation as well as being reviewed and g g approved by the City Forester.
DEVELOPMENT 3. Final beds and staff numbers will dictate maximum parking spaces the facility
can have. See LUC 3.2.2(K)(2)(a) Parking count requirements are .33 stalls per
bed plus 1 stall per 2 employees at the highest shift count. 122 Beds X .33 = 40.26 or
41 stalls; 30 employees X .5 =15 stalls; total required per code 56 stalls. Total
provided 65 stalls
4. It is advised to consider a change in ground signs. Both facilities have had their
share of portable signs (which isn't permitted) and banners (permitted w/permit)
displayed. A consideration of a changeable copy message board on ground
PLANNING
DESIGN
CONSTRUCTION
June 6, 2012
Conceptual Review Staff Comment
(From meeting held June 8, 2o22)
Current Planning
Contact: Courtney Levingston, 970-416-2283, CLevingston@fcgov.com
1. This project is a minor amendment that must be brought into compliance with the
standards in Article 3 and 4 per LUC 1.6.5(8) - "where a building is proposed to
be enlarged, expanded or added by more than 25% of the gross floor area ... the
parcel shall be brought into compliance." Since the initial conceptual review staff
meeting this project is now proceeding under a major amendment process.
If you would like to replat the property, then that replat would be managed by the
planning department. www.fogov.com/developmentreview for application
requirements and fees for a project development plan w/replat. A replat will be an
Administrative (Type 1) review and hearing. We will be replatting this project into
one lot and it will proceed concurrently with the major amendment process.
2. Please ensure that 6% of the interior of the parking lot is in landscape islands,
parking lot and building lighting needs to be down directional and shielded, need
landscaping along west side of expanded parking lot. Acknowledged, will be
compliant
3. How many spaces will be provided? 3.2.2 (K) parking requirements. Parking
count requirements are .33 stalls per bed plus 1 stall per 2 employees at the highest
shift count. 122 Beds X .33 = 40.26 or 41 stalls; 30 employees X .5 = 15 stalls; total
required per code 56 stalls. Total provided 65 stalls
ARCHITECTURE
4. Any trash and/or recycling enclosures shall be compatible with the style of
PLANNING architecture of the building
, per Section 3.2.5 of the LUC. Pease ensure there is
INTERIORS adequate space in the dumpster area to allow for recycling services.
Acknowledged, will be compatible
CONSTRUCTION
5. The proposed development is subject to a Minor Amendment Review, please
DEVELOPMENT contact the Zoning Department regarding your formal submittal. Since the initial
meeting this project is now proceeding under a major amendment process.
Fire Authority
Contact: Carie Dann, 970-219-6337, CDANN@poudre-fire.org
1. AUTOMATIC FIRE SPRINKLERS: Any addition to Sterling House and/or Clare
Bridge House must be equipped with automatic fire sprinklers, tying into the
existing structure(s). All new construction will be fully sprinklered as well as all of
the existing buildings shall be fully sprinklered.