Loading...
HomeMy WebLinkAboutBUCKING HORSE FIRST FILING - FDP - FDP120008 - CORRESPONDENCE -Comment Number: �ment Originated: 07/30/2012 07/30/2012: Has the applicant thought about the landscape plan being divided into phases associated with C/0's or Letter of Completions for each building? Comment Number: 10 Comment Originated: 07/30/2012 07/30/2012: A note added stating to alter driveway locations will require a Minor Amendment to site and plan and possible landscaping plan. Comments from Tim Buchanan, City Forester: 08/07/2012: Additional discussion about street tree species selection is requested by the City Forester. Please contact the City Forester to discuss and get detail comments to incorporate into the final plan on street trees and some others. 08107/2012 Please show locations of existing trees to be protected on the landscape plan not just on the tree protection and mitigation plan. This will aid in seeing how the existing trees incorporate into the new landscape. 08/07/2012: Please confirm the count of mitigation trees at 24. Record the mitigation trees on landscape sheet G002 by listing under the recorded species how many will be upsized mitigation trees. Comments from Don Kapperman, Comcast: Comcast is requesting a six-foot wide utility easement along the rear yard lot lines for all homes. The names of the buildings on the site plan need to be consistent with the names of the buildings on the elevations. 07/30/2012: Where are the elevations for the entrance to wine cave, and trash/recycling enclosures? Please indicate with a note on the elevation of the 6-plex that the 5,4,3-plex are variations of building elements found on the 6-plex. Names of buildings on the site plan and the elevations need to be coordinated and be consistent (applicant might use the building numbering on the plat). Comment Number: 2 Comment Originated: 04/26/2012 04/26/2012: Please show on the plans in a table how parking/bicycling requirements are being met. 07/30/2012: In the applicant response letter it was indicated that zoning would receive this table separately. Zoning never received this table, however this table needs to be on documented within the plans. Indicate on the plans the three parking classes (Child Care, Shopping Center, and Industrial) and the quantity that was approved with the PDP through the alternative compliance for each class. Comment Number: 6 Comment Originated: 04/27/2012 04/27/2012: LUC 3.2.5 & 3.5.1(1) Trash/Recycling enclosures shall be on a concrete pad, designed with a walk-in access without having to open the main service gate, and set back twenty ft from a public sidewalk 07/30/2012: Where are the trash/recycling enclosures for buildings on PAD 1, PAD 2, and PAD 3 on LOT 1? The trash/recycling enclosures in the attached single family and at the day-care facility appear not to have walk-in access without opening the main service gate, these enclosures also need the walk-in access. Comment Number: 7 Comment Originated: 07/30/2012 07/30/2012: Sheets LS100 indicates the parking stall dimensions are 9'xl8' for stand vehicle and Sheet LS102-104 indicates the parking stall dimensions are 10'x18', however actual standard dimensions are 9'xl9' this may be modified if stall overhangs meets the criteria outlined in figure 5 of section 3.2.2 of the Land Use Code. When using the overhang to reduce the size of stall the width of the landscaped area or sidewalk the vehicles will overhang needs to be labeled on plans. Comment Number: 8 Comment Originated: 07/30/2012 07/30/2012: There was no lighting plans include with the FPD. Comment Number: 1y comment Originated: 07/31/2012 07/31/2012: Schedule a joint meeting with Water Utilities and PFA to discuss the fire hydrants in the townhome area to find an alternative to the extra long hydrant leads. Comment Number: 21 Comment Originated: 07/31/2012 07/31/2012: Pad sites 3-8 (on utility plans) are in the same general vicinity. Pad site 9, however, is quite a distance away. It is suggested that 9 be moved adjacent to 3-8 or provide a separate water tap. Comment Number: 22 Comment Originated: 07/31/2012 07/31/2012: Show and label the steel casings at all locations where water or sanitary sewer lines are crossing below storm drains which are 24" or larger. Specify the diameter, thickness and length of the casings. Comment Number: 23 Comment Originated: 07/31/2012 07/31/2012: Where storm drains are crossing over water mains, add encasement of storm drain joints for all joints within 10" of water mains. Encasement can be concrete per the standard detail or a product called EZ-Wrap (or approved equal). Comment Number: 24 Comment Originated: 07/31/2012 07/31/2012: Adjust manholes in the private drives to place manholes on the centerline. Topic: General Comment Number: 20 Comment Originated: 07/31/2012 07/31/2012: Revise the pad site numbering so that the site plan and the utility plans have same numbering scheme. Topic: Landscape Plans Comment Number: 18 Comment Originated: 04/30/2012 04/30/2012: BHTH: Show water and sanitary sewer mains and services on the landscape plans and adjust plantings to provide the required separation distances. Topic: Plat Comment Number: 14 04/3012012: JFAV: Show utility easements on the plat. Department: Zoning Contact: Noah Beals, 970.416-2313, nbeals(_fcgov.com Topic: General Comment Number: 1 Comment Originated: 04/30/2012 Comment Originated: 04/26/2012 04/26/2012: Need elevations for all buildings (3-plex, 5-plex, 6-plex, the other industrial building, the other commercial building, the child care center, entrance to wine cave, trash/recycling enclosures) Elevations of the industrial building include the loading dock area. All elevations should include preliminary locations of mechanical/utility equipment with a note on how such equipment should be screened/painted. Comment Number: 2 Comment Originated: 04/30/2012 04/30/2012: BHR: The heavy phasing lines are covering some notes and symbols on the overall water plan. Comment Number: 3 Comment Originated: 04/30/2012 04/30/2012: BHR: Maintain 10 foot separation between water mains and all sewers (sanitary and storm). (Noticed on Cutting Horse Drive.) Comment Number: 4 Comment Originated: 04/30/2012 04/30/2012: BHR: Install water mains and sanitary sewers in steel casing at all locations where these lines are crossing below a storm sewer 24" or larger. Comment Number: 5 Comment Originated: 04/30/2012 04/30/2012: BHR: Re -align storm sewers to cross water and sanitary at right angles (+/-). Comment Number: 6 Comment Originated: 04/30/2012 04/30/2012: BHR: Lowering table on Sht 61 contains more lowering that labeled on water plans. Schedule meeting to review and clarify. Comment Number: 7 Comment Originated: 04/30/2012 04/30/2012: BHR: Underdrain detail shows 1 foot separation between bottom of sanitary and top of underdrain. Why are profiles generally showing in excess of 2 feet of separation? Comment Number: 8 Comment Originated: 04/30/2012 04/30/2012: BHR: Update Standard Details. Comment Number: 9 Comment Originated: 04/30/2012 04/30/2012: BHR: See redlined utility plans for other comments. Comment Number: 10 Comment Originated: 04/30/2012 04/30/2012: Jessup Farm Artisan Village (JFAV): Will Pads 2 and 3 in Lot 2 and Pad 4 in Lot 1 need water and sewer service? Comment Number: 11 Comment Originated: 04/30/2012 04/30/2012: JFAV: Can the two fire hydrants in Lot 1 be switched to the other side of the drive to avoid crossing the sewer? Comment Number: 12 Comment Originated: 04/30/2012 04/30/2012: JFAV: What are the plans for water and sewer service to Pads 4 through 8 in Lot 2? Comment Number: 13 Comment Originated: .04/30/2012 04/30/2012: JFAV: Are there any irrigation taps planned? Comment Number: 15 Comment Originated: 04/30/2012 04/30/2012: Bucking Horse Townhomes (BHTH): A meeting with PFA is needed to discuss fire hydrant locations and the need for hydrants slong the interior drives. Comment Number: 16 Comment Originated: 04/30/2012 04/30/2012: BHTH: Schedule meeting to review alignments of sanitary sewers in relationship to landscaping and required separation distances Comment Number: 17 Comment Originated: 04/30/2012 04/3012012: BHTH: Install water mains and sanitary sewers in steel casing at all locations where these lines are crossing below a storm sewer 24" or larger. ( l Comment Number: 4 Comment Originated: 05/25/2012 06/19/2012: Based upon discussions with engineering staff and traffic management staff, and with review of past TIS's and Special Improvement District documents related to the Timberline and Prospect intersection it has been determined that the project has fulfilled its monetary obligations for improvements at the intersection. 05/25/2012: The impacts at Timberline and Prospect are greater than can be mitigated with only the addition of the south bound right turn lane, the east bound FREE right turn and timing adjustments. Timing adjustments just move the failed LOS from one movement to another. There does exist documents pertaining to the previous intersection improvements indicating funds already provided by area land owners, this one included, that may prove they have already paid for their developments traffic impacts at the intersection. Traffic is seeking clarification or confirmation of this issue. Comment Number: 5 Comment Originated: 06/12/2012 06/12/2012: The TIS's has an error in its Balanced Existing PM Sb volume. The number shown is 115 but was 352 in the unbalanced existing count. Please correct. Department: Transportation Planning Contact: Emma McArdle, 970-221-6197, emcardle(a)fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/05/2012 06/05/2012: Currently route 16 runs adjacent to this property on Timberline Road. Two existing stops are located at Timberline and Nancy Gray and Timberline and Prospect, approximately a 1/2 mile away from each other. Transfort prefers to space stops out about 1/4 mile from each other. This would be the northern side of outlot C. Please provide an accessible bus stop pad in this vicinity of the at least 12' deep by 18' wide. The pad needs to be either in the ROW or in a Transit Easement. Our preferred location would be 50' to 80' north of the proposed Blackbird Drive, but due to the grading in the area, we are open to the exact location. Please feel free to contact me to assist you in locating a pad site. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson(&fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 04/27/2012 04/27/2012: Per Eric Olson, Russian Sage is no longer on the City of Fort Collins allowed plant list. Please revise landscape plan. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221.6854, rbuffington anfcgov.com Topic: Construction Drawings Comment Number: 1 Comment Originated: 04/30/2012 04/30/2012: Bucking Horse Residences (BHR): The overall utility plans appear to show drive locations; however, drives are not included on the plat for Sidehill 2nd Filing. In addition, the drive locations for some lots do not align with the building envelops. Please clarify. Department: Traffic Operation Contact: Ward Stanford, 970.221-6820, wstanford(a)fcgov.com Topic: Construction Drawings Comment Number: 7 Comment Originated: 06/19/2012 06/19/2012: R1-1 (Stop) signs should be revised to 36x36 and should include the street name sign above. Comment Number: 8 Comment Originated: 06/19/2012 06/19/2012: Please revise all locations in the Signing and Marking Notes that state "Local Entity or City of Ft Collins Engineer" by inserting "Traffic" in front of Engineer . This is a permanent change so please revise your standard notes file to reflect the change. Comment Number: 9 Comment Originated: 06/21/2012 06/21/2012: (Site and Landscape plans also) The sight distance triangle from the Blue Yonder to Cutting Horse, south side of Blue Yonder, may be a little large. Please review that the 260' is measured along the vehicle path and the resulting sight line defines the easement area. Might get some land back. Topic: General Comment Number: 6 Comment Originated: 06/19/2012 06/19/2012: The TIS reviews the full ODP site. The PDP submittal is about a third of the ODP area. This project's submittal is not typical in that an overall TIS is normally done then as phases come in for approval additional TIS's are drafted for that phase. Since this project has submitted a TIS for the full site either additional TIS's need to be done for strictly the submitted area or the impacts in the TIS will need to be mitigated in concert with the construction of the submittal area. Topic: Traffic Impact Study Comment Number: 1 Comment Originated: 05/19/2012 05/19/2012: The comments provided for this initial round of review pertains to all of the components of the Buckinghorse submittal. There will not be individual comments for the 3 differing parts of the submittal (Jessup, Residences and.Townhomes). Comment Number: 2 Comment Originated: 05/25/2012 05/19/2012: TIS states the need to provide right turn green overlaps with covering left turns. Is the right turn overlaps needed at certain locations to achieve acceptable LOS? Please provide the locations. Comment Number: 3 Comment Originated: 05/25/2012 05/25/2012: Traffic concurs with the studies findings at Timberline and Drake, except that Traffic Op's can get acceptable LOS in the existing condition with fairly minor timing adjustments. Traffic can also achieve acceptable LOS in the ST TOTAL with the stated physical roadway improvements, without cycle length changes. This projects short term traffic does increase delay greater than 2% between BACKGROUND and TOTAL and therefore has responsibility for physical improvements at this intersection. The City concurs with the addition of a south bound left turn lane and a west bound right turn lane to mitigate the developments impacts. 05/09/2012: BH1 - i here are text over text issues on sheet 2. Comment Number: 51 Comment Originated: 05/09/2012 05/09/2012: BHT - Please change the vicinity map to match the boundaries being replatted. Comment Number: 52 Comment Originated: 05/09/2012 05/09/2012: BHT - All text should be oriented so that it is read from the bottom of the page. Comment Number: 53 Comment Originated: 05/09/2012 05/09/2012: BHT - Please add ownership & maintenance for all Tracts per Development Review Submittal requirement 3(e). Comment Number: 54 Comment Originated: 05/09/2012 05/09/2012: BHT - Please cite the development agreement and/or other documents affecting use of the property. Comment Number: 55 Comment Originated: 05/09/2012 05/09/2012: BHT - Please correct Sandbur Drive on sheet 2. Sandbur is one word. Comment Number: 56 Comment Originated: 05/09/2012 05/09/2012: BHT - Please adjust curve labels to appropriate sides of curves. Comment Number: 57 Comment Originated: 05/09/2012 05109/2012: BHT - Please add graphical tie information to the Basis of Bearings. Comment Number: 58 Comment Originated: 05/09/2012 05/09/2012: BHT - Please provide monument records for all public land corners per Development Review Submittal requirement 3(v). Topic: Site Plan Comment Number: 59 Comment Originated: 05/09/2012 05109/2012: BHFF - The legal description on the cover sheet doesn't describe what is shown on the plans. Comment Number: 60 Comment Originated: 05/09/2012 05/09/2012: BHFF - There are line over text issues on sheets LS100, LS101 & LS102. Comment Number: 61 Comment Originated: 05/09/2012 05/09/2012: BHT -The legal descriptions on the cover sheet & sheet LS100 don't match the subdivision plat. Comment Number: 62 Comment Originated: 05/09/2012 05/09/2012: BHT - The cover sheet index doesn't match sheet LS100. Comment Number: 63 Comment Originated: 05/09/2012 05/09/2012: BHT -There are line over text issues on sheets LS101, LS102 & LS103. Comment Number: 64 Comment Originated: 05/09/2012 05/09/2012: BHT -There are text over text issues on sheet LS102. Comment Number: 65 Comment Originated: 05/09/2012 05/09/2012: BHJF - There are line over text issues on sheets LS401 & LS403. j ( i Comment Number: 32 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please show all building envelope dimensions. Comment Number: 33 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please tie all building envelopes to the outer boundary. Comment Number: 34 Comment Originated: 05/09/2012 05/09/2012: BHJF - All text should be oriented so that it is read from the bottom of the page. Comment Number: 35 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please make all size & thickness of text consistent. Comment Number: 36 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please state the scale that the scale bar is showing. Comment Number: 37 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please provide monument records for all public land corners per Development Review Submittal requirement 3(v). Comment Number: 38 Comment Originated: 05/09/2012 05109/2012: BHT - The boundary & legal close. Comment Number: 39 Comment Originated: 05/09/2012 05/09/2012: BHT - Please correct the typos in the legal description. Comment Number: 40 Comment Originated: 05/09/2012 05/09/2012: BHT - Please state the scale that the scale bar is showing. Comment Number: 41 Comment Originated: 05/09/2012 05/09/2012: BHT - Where there any found pins? Comment Number: 42 Comment Originated: 05/09/2012 05/09/2012: BHT - Please correct the sub -title. This is in the west half of Section 20. Comment Number: 43 Comment Originated: 05/09/2012 05/09/2012: BHT - Please show the adjoining street right of way, and how it was dedicated. Comment Number: 44 Comment Originated: 05/09/2012 05/09/2012: BHT - Please dimension all property lines. Comment Number: 45 Comment Originated: 05/09/2012 05/09/2012: BHT - Please label all blocks. Comment Number: 46 Comment Originated: 05/09/2012 05/09/2012: BHT - Please label all tracts, and show their use. Comment Number: 47 Comment Originated: 05/09/2012 05/09/2012: BHT - All existing & proposed easements must be locatable. Comment Number: 48 Comment Originated: 05/09/2012 05/09/2012: BHT - Please reference the all adjoining subdivision plats. Comment Number: 49 Comment Originated: 05/09/2012 05/09/2012: BHT - There are line over text issues on sheets 1 & 2. Comment Number: 50 Comment Originated: 05/09/2012 Comment Number: i. u mment Originated: 05/09/2012 05/09/2012: BHR - Please provide monument records for all public land corners per Development Review Submittal requirement 3(v). Comment Number: 16 Comment Originated: 05/09/2012 05/09/2012: BHJF - The legal description does not match sheet 2. Comment Number: 17 Comment Originated: 05/09/2012 05/09/2012: BHJF - A closure was not done on the legal description or the boundary. Comment Number: 18 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please correct the typos in the sub -title. Comment Number: 19 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please correct the typos in the legal description. Comment Number: 20 Comment Originated: 05/09/2012 05/09/2012: BHJF - The acreage in the legal description does not match the acreage shown on sheet 2. Comment Number: 21 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please add 'Basis of Bearings" to general note #3. Comment Number: 22 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please cite the development agreement and/or other documents affecting use of the property. Comment Number: 23 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please revise general note #5, providing use, ownership & maintainance of Tracts per Development Review Submittal requirement 3(e). Comment Number: 24 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please correct the typo in general note #6. Comment Number: 25 Comment Originated: 05/09/2012 05/09/2012: BHJF - Where there any found pins? Comment Number: 26 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please change the vicinity map on sheet 2 to match the boundary. Comment Number: 27 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please show the adjoining street right of way, and how it was dedicated. Comment Number: 28 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please reference the all adjoining subdivision plats. Comment Number: 29 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please dimension all property lines. Comment Number: 30 Comment Originated: 05/09/2012 05/0912012: BHJF - Please increase the text size of the right of way widths. Comment Number: 31 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please dimension the waterline easement shown at the north end of the property. All easements existing & proposed must be locatable. 05/09/2012: BhjF - There are line over text issues on sheets LP401 & LP402. Comment Number: 71 Comment Originated: 05/09/2012 05/09/2012: BHJF - There are text over text issues on sheets LP403, LP404 & LP405. Topic: Lighting Plan Comment Number: 77 Comment Originated: 05/09/2012 05/09/2012: BHT - The details on sheets L101, L102 & L103 are hard to read. Please increase the size. Comment Number: 78 Comment Originated: 05/09/2012 05/09/2012: BHJF - There are line over text issues on sheet L101. Topic: Plat Comment Number: 2 Comment Originated: 05/08/2012 05/08/2012: BHR - The boundary & legal close. Comment Number: 3 Comment Originated: 05/08/2012 05/08/2012: BHR - Please change all lot lines to solid linetype. Comment Number: 4 Comment Originated: 05/08/2012 05/08/2012: BHR - Please add a curve table. Comment Number: 5 Comment Originated: 05/09/2012 05/09/2012: BHR - Please correct the typo in the legal description. Comment Number: 6 Comment Originated: 05/09/2012 05/09/2012: BHR - Please cite the development agreement and/or other documents affecting use of the property. Comment Number: 7 Comment Originated: 05/09/2012 05/09/2012; BHR - Please add ownership & maintenance for all Tracts. Comment Number: 8 Comment Originated: 05/09/2012 05/09/2012: BHR - Where there any found pins? Comment Number: 9 Comment Originated: 05/09/2012 05/09/2012: BHR - Please add a definition of the 9' UE. Comment Number: 10 Comment Originated: 05/09/2012 05/09/2012: BHR - Please state the scale that the scale bar is showing. Comment Number: 11 Comment Originated: 05/09/2012 05/09/2012: BHR - We recommend that the lot lines be straight lines not curved. This is not required. Comment Number: 12 Comment Originated: 05/09/2012 05/09/2012: BHR - Please show how all right of ways were dedicated. Comment Number: 13 Comment Originated: 05/09/2012 05/09/2012: BHR - Please reference the all adjoining subdivision plats. Comment Number: 14 Comment Originated: 05/09/2012 05/09/2012: BHR - Please darken the linework for the Sidehill - Filing Two. Comment Number: bu uumment Originated: 05/09/2012 05/09/2012: BHJF - There is a typo in the legal description on sheet CS1. Comment Number: 87 Comment Originated: 05/09/2012 05/09/2012: BHJF - There is a typo in the contact information, under Surveyor on sheet CS1. Comment Number: 88 Comment Originated: 05/09/2012 05/09/2012: BHJF - The benchmark descriptions are incomplete on sheet CS2. Comment Number: 89 Comment Originated: 05/09/2012 05/09/2012: BHT - The legal description on sheet CS1 doesn't match the subdivision plat. Comment Number: 90 Comment Originated: 05/09/2012 05/09/2012: BHT - The sheet index on sheet CS1 doesn't match sheet DR1. Comment Number: 91 Comment Originated: 05/09/2012 05/09/2012: BHT - There is a typo in the legal description on sheet CS1. Comment Number: 92 Comment Originated: 05/09/2012 05/09/2012: BHT - The benchmark descriptions are incomplete on sheet CS2. Comment Number: 93 Comment Originated: 05/09/2012 05/09/2012: BHT - The details on sheets EC2 is hard to read. Please increase the size. Comment Number: 94 Comment Originated: 05/09/2012 05/09/2012: BHT - There are line over text issues on sheets HC1, HC2, HC3, G1, G2 & G3. Comment Number: 95 Comment Originated: 05/09/2012 05/09/2012: BHT - There are text over text issues on sheets HC2 & HC3. Comment Number: 96 Comment Originated: 05/09/2012 05/09/2012: BHT - There is an incorrect matchline number on sheet G3. Topic: General Comment Number: 1 Comment Originated: 05/08/2012 05/08/2012: For clarity each project will be referenced as the following. Bucking Horse Residences will be BHR, Bucking Horse - Jessup Farm Artisan Village will be BHJF, Bucking Horse - Townhomes will be BHT, and Bucking Hore First Filing will be BHFF. Topic: Landscape Plans Comment Number: 66 Comment Originated: 05/09/2012 05/09/2012: BHFF - The legal description on the cover sheet doesn't describe what is shown on the plans. Comment Number: 67 Comment Originated: 05/09/2012 05/09/2012: BHFF - There are line over text issues on sheets LP101 & LP102. Comment Number: 68 Comment Originated: 05/09/2012 05/09/2012: BHT - The legal description on the cover sheet doesn't match the subdivision plat. Comment Number: 69 Comment Originated: 05/09/2012 05/09/2012:. BHT - There are line over text issues on sheets LP101, LP102, LP103 & LP104. Comment Number: 70 Comment Originated: 05/09/2012 05/04/2012: Please provide 10 feet of separation between the storm sewer and the trash enclosure located in the townhome area. Comment Number: 4 Comment Originated: 05/04/2012 05/04/2012: If grading is changed in the single family portion of this PDP, reanalysis of the storm water infrastructure may be required. This could include street capacity, inlet sizing, etc. Comment Number: 5 Comment Originated: 05/04/2012 05/04/2012: At final compliance stage, review of all hydraulics and detailed grading will take place. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty(a.fcgov.com Topic: Building Elevations Comment Number: 72 Comment Originated: 05/09/2012 05/09/2012: BHT - No comments. Comment Number: 73 - Comment Originated: 05/09/2012 05/09/2012: BHJF - There is a typo on sheet PDP 4. Comment Number: 74 Comment Originated: 05/09/2012 05/09/2012: BHJF - Please add "Elevation" to sheets PDP 5 -11. Comment Number: 75 Comment Originated: 05/09/2012 05/09/2012: BHJF - There are typos on sheet PDP 7. Comment Number: 76 Comment Originated: 05/09/2012 05/09/2012: BHJF - There are line over text issues on sheet PDP 9. Topic: Construction Drawings Comment Number: 79 _ Comment Originated: 05/09/2012 05/09/2012: BHR - The legal description doesn't match the subdivision plat. Comment Number: 80 Comment Originated: 05/09/2012 05/09/2012: BHR - There are problems with the benchmarks on sheets 1 & 2. Please contact Technical Services @ 221-6588 for a current copy of the City of Fort Collins Vertical Control Network. Comment Number: 81 Comment Originated: 05/09/2012 05/09/2012: BHR - There are line over text issues on many sheets. Comment Number: 82 Comment Originated: 05/09/2012 05/09/2012: BHR - There are text over text issues on many sheets. Comment Number: 83 Comment Originated: 05/09/2012 05/09/2012: BHR - There is cut off text on sheets 18, 29 & 61. Comment Number: 84 Comment Originated: 05/09/2012 05/09/2012: BHR - Could sheet 28 be enlarged? . Comment Number: 85 Comment Originated: 05/09/2012 05/09/2012: BHR - There is an incorrect matchline number on sheet 50. FAr • The developer shall contact the City Forester to inspect all street tree plantings at the completion of each phase of the development. All trees need to have been installed as shown on the landscape plan. Approval of street tree planting is required before final approval of each phase. Failure to obtain approval by the City Forester for street trees in a phase shall result in a hold on certificate of occupancy for future phases of the development. Comment Number: 4 Comment Originated: 05/09/2012 05/09/2012: The number of mitigation trees required for each significant tree being remove should be added to the labeled descriptions on Sheet LP401 and LP402. Comment Number: 5 Comment Originated: 05/09/2012 05/09/2012: Add street trees between the sidewalk and curb along Timberline north of Nancy Gray. As slope increases in the parkway to the north it may be difficult to include street trees. Explore if this is possible or if back of walk street trees would be more suitable in this section. City Forester is available to discuss best placement in this area. Comment Number: 6 Comment Originated: 05/09/2012 05/09/2012: If there are any dead existing street trees in the parkway on Timberline by Bucking Horse Town Homes they should be identified and noted form replacement. Comment Number: 7 Comment Originated: 05/09/2012 05/09/2012: Ornamental trees are shown as symbols on the townhome site but are not identified as to species on the Preliminary plan. Comment Number: 8 Comment Originated: 05/09/2012 05/09/2012: Final landscape plans should incorporate the species diversity requirements in 3.2.1. Comment Number: 9 Comment Originated: 05/09/2012 05/09/2012: The landscape architect should schedule a meeting with the City Forester to discuss species choices for street trees on these three projects. Department: Historical Preservation Contact: Josh Weinberg, 970-221.6206, jwe!nber-g(cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 05/01/2012 Comments are pending Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue aMcgov.com Topic: General Comment Number: 1 Comment Originated: 05/02/2012 05/02/2012: Please provide a drainage summary describing any changes to the original design of Sidehill, Filing 2 and confirm that this PDP is in conformance with City criteria. Comment Number: 2 Comment Originated: 05/02/2012 05/02/2012: Please document all flows from Jessup Farm (north and south) and confirm that these flows are either less than historic or adequate conveyance is provided. Comment Number: 3 Comment Originated: 05/04/2012 Comment Number: 38 Comment Originated: 07/31/2012 07/31/2012: Does lot 2 Block 4 extend to the right of way at Scarecrow? It is unclear but it appears the lot stops short of the right of way. The lot must be connected to right of way with the blanket access easement to form a legal lot. Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex(cDfcgov.com Topic: General Comment Number: 1 Comment Originated: 04/30/2012 07/31/2012: Staff did not receive this memo - can you please send it on? 04/30/2012: Based on the discussion during the ODP review last week, staff has reviewed the ECS where numerous resources were originally documented (2001) on the site. Based on a discussion with the applicant and their site visit with their ecological consultant, these resources no longer exist. Please provide a memo to me, from your ecological consultant, detailing the site visit dates and what was/was not observed on the site. After I receive this memo, it would be good to schedule a site visit to confirm these findings and to officially determine that Section 3.4.1 of the Land Use Code does not apply to this project. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan(a)fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 05/09/2012 05/09/2012: Mitigation trees need to be upsized and shown on final landscape plan. Canopy Shade Trees 3.0 inch caliper. Ornamental Trees 2.5 inch caliper. Conifer trees 8 feet height Comment Number: 2 Comment Originated: 05/09/2012 05/09/2012: Evergreen trees are not shown on the preliminary landscape plans. Explore adding them in appropriate areas to add tree diversity and interest. Comment Number: 3 Comment Originated: 05/09/2012 05/09/2012: Please add these notes to the landscape plans landscape. • The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. • A permit must be obtained from the City forester before any trees or shrubs as noted on this plan are planted, pruned or removed on the public right-of-way. This includes zones between the sidewalk and curb, medians and other city property. This permit shall approve the location and species to be planted. Failure to obtain this permit may result in replacing or relocating trees and a hold on certificate of occupancy. Comment Number: bu L.omment Originated: 07/31/2012 07/31/2012: Sheet R4 - It appears storm and inlet are turned off in this viewport. Comment Number: 60 Comment Originated: 07/31/2012 07/31/2012: Sheet R7 - recommend adding a storm inlet in the intersection of Yearling Drive and Cocklebur lane to eliminate the need for 2 cross pans. Comment Number: 61 Comment Originated: 07/31/2012 07/31/2012: Sheet R7 - Minimum flowline slopes in the bulb of a cul de sac are 1%. Consider raising the spot elevation at the end of the bulb to create steeper flowline slopes into the proposed inlets. Topic: General Comment Number: 40 Comment Originated: 07/31/2012 07/31/2012: Some line over and text over text issues still exist on a few sheets. Comment Number: 42 Comment Originated: 07/31/2012 07/31/2012: Sheet PH - Is the grading intended to be overlot for all phases or will grading be done with each phase? This could affect how street phasing is terminated and in respects to drainage. Comment Number: 62 Comment Originated: 07/31/2012 07/31/2012: Sheet R13 - See redlines regarding additional intersection detail and preferred flowline grades at cross pan curb returns. Topic: Plat Comment Number: 5 Comment Originated: 05/02/2012 07/31/2012: There are still some missing labels and line over text issues. 05/02/2012: JFAV - Appears there is missing dimensions, curve and line text, tract labels, and block labels. Comment Number: 32 Comment Originated: 07/31/2012 07/31/2012: Tracts D, F, I should not be exclusive to "private access", Is it the intent to have tracts A, B, C, etc. have private access as well? Comment Number: 33 Comment Originated: 07/31/2012 07/31/2012: If the Townhome streets are named, than they need to be added to the plat and after the name "(private drive)" should be added. Comment Number: 34 Comment Originated: 07/31/2012 07/31/2012: Block 7 does not appear to have a tie to any corners. Comment Number: 35 Comment Originated: 07/31/2012 07/31/2012: Check the scale on Sheet 3 of 4. Comment Number: 36 Comment Originated: 07/31/2012 07/31/2012: On sheet 3 of 4 it doesn't appear that outlot A has a blanket utility easement on it, therefore a 15' utility easement will need to be provided behind the right of way. Comment Number: 37 Comment Originated: 07/31/2012 07/31/2012: Label the width of the emergency access easement on sheet 3 of 4 Comment Number: 46 Comment Originated: 07/31/2012 07/31/2012: Sheet OM - Please delineate utility phasing more clearly on this sheet. Topic: Construction Drawings Comment Number: 47 Comment Originated: 07/31/2012 07/31/2012: Sheet SS4 - Finished and existing grades appear to have duplicated and shifted on this profile. Comment Number: 48 Comment Originated: 07/31/2012 07/3112012: Sheet ST4 - Please revise the miscellanous callouts on this profile. Comment Number: 49 Comment Originated: 07/31/2012 07/31/2012: Sheet OG1 - Revise scale reference Comment Number: 50 Comment Originated: 07/31/2012 07/31/2012: Sheet G1 - Label existing contour elevations (all sheets). Comment Number: 51 Comment Originated: 07/31/2012 07/31/2012: Sheet G1 - Provide a detail for retaining wall. A seperate building permit may be required and separate review for a wall of this height and magnitude. Comment Number: 52 Comment Originated: 07/31/2012 07/31/2012: Sheet G1 - Emergency Access off Timberline. Provide additional grade and spot elevations in this vicinity. What materials will be used for the emergency access road? Is the Timberline access going to be a curb cut or will it be intended for the emergency vehicles to mount the vertical curb? Provide details (i.e. material and type) for the proposed bollards. Comment Number: 53 Comment Originated: 07/31/2012 07/31/2012: Sheet G9 - Provide additional grading, slope and spot information for the tail in this location. Comment Number: 54 Comment Originated: 07/31/2012 07/31/2012: Sheet R1 - Provide existing grade and grade break for tie-in to existing at end of road profile (typical, all sheets). Comment Number: 55 Comment Originated: 07/31/2012 07/31/2012: Sheet R2 - Please include intersection callout, stationing and elevation within street profiles (all sheets) Comment Number: 56 Comment Originated: 07/31/2012 07/31/2012: Provide existing information and detail on Timberline and tie-in to Blackbird Drive. Include this additional detail on "detail A" on R13. Comment Number: 57 Comment Originated: 07/31/2012 07/31/2012: Sheet R3 - Is it intended to rebuild centerline of Kerry Hill Drive? Proposed grade line exists on profile past saw cut line. Comment Number: 58 Comment Originated: 07/31/2012 07/31/2012: Sheet R3 - Please provide some additional grade spot elevations and cross slopes within the street curve to ensure minimum and maximum cross slopes are maintained in the curve. F6rt Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/d`eve/opmentreview August 01, 2012 Craig Russell Russell + Mills Studios 141 S. College Ave., Suite 104 Fort Collins, CO 80525 RE: Bucking Horse, First Filing, FDP120008, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221-6343 or tshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Andrew Gingerich, 970-221.6603, agingerich fcgov.com Topic: Construction Drawings Comment Number: 39 Comment Originated: 07/31/2012 07/31/2012: Please add the standard street cut note to the existing condition and demolition plan. Comment Number: 41 Comment Originated: 07/31/2012 07/31/2012: Sheet PH - Utilities should be labeled more specifically as to what phase they will be constructed in. Some utilities may need to be built across future phases to serve a current phase. Comment Number: 43 Comment Originated: 07/31/2012 07/31/2012: Sheet PH - End of street termination may require rip rap or erosion control protection and/or temporary swales for drainage that will run off end of terminated streets. Comment Number: 44 Comment Originated: 07/31/2012 07/31/2012: Sheet PH1 - Will phases be built in order of A, B, C1, C2 or do these just label the phase but not the order of build out? Comment Number: 45 Comment Originated: 07/31/2012 07/31/2012: Sheet OU1 - Revise scale reference