HomeMy WebLinkAboutREGENCY LAKEVIEW - PDP & APU - PDP120013 - CORRESPONDENCE - (9)Collins mot.__. CURRENT STATUS AND CONSTRUCTION SCHEDULE: We are anticipating the "advertisement for bids" to begin on August 31, 2011. We will open bids for the proposed construction work on September 21, 2011 and expect to begin construction the week of October 10, 2011. Construction will begin at the Harmony and Lemay intersection then move to the Drake and Lemay intersection. The approximate dates at Drake and Lemay will be from October 31; 2011 through November 14, 2011. Citizens should expect minor vehicle delays while travelling westbound on Drake during the construction. The roadway will be narrowed to one travel lane from the hours of 8:OOam to 6:OOpm. Bicycle traffic may intermittently be asked to merge with traffic along the work zone, depending upon the construction operations for that day. As a reminder, bicycles are asked to "take the lane" when merging with vehicles. Pedestrian traffic routes will be signed accordingly. NEXT STEPS: I am meeting with the City Forester and Jordan's Tree Service on August 23`d to evaluate the required tree relocations along the north side of Drake Road. We expect to relocate the trees at the end of October. I am meeting Mike Frank from Greening Up on August 18`h to discuss the relocation of the existing irrigation system and options for watering and monitoring the relocated trees. Feel free to contact me with any questions related to the proposed turn lane. Construction updates can be found at the following web link: http://zeus.fcgov.com/fetrip . Respectfully, Timothy . K mp, E Capital Projects Engineer City of Fort Collins (970) 416-2719 tkemp@fc og v.com City of 0 M F6rt CoRins Memo Date: August 17, 2011 To: Ted Shepard, Chief Planner From: Tim Kemp, Capital Projects Engineer Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 - fax fcgov. corn/engine eying Re: West Bound Drake to North Bound Lemay Right Turn Lane Update PROJECT NEED AND FUNDING: The City received a Federal Grant under the category of Congestion Mitigation and Air Quality (CMAQ) Improvements to construct various turn lanes throughout the City. The Federal Grant pays for 80% of the project cost, with the other 20% contributed by the City. The goal of the project, and requirements for the funding, is to.improve air quality by reducing the amount of vehicle wait time at the intersections. The air quality benefits are measured as the reduction in kilograms per year of carbon monoxide (CO). Currently, about 50% of vehicles in the outside, westbound lane on Drake Road are right turning vehicles during the peak hours of operation. BACKGROUND AND ACQUISITIONS: The turn lane at Drake and Lemay required right-of-way (ROW) and temporary construction easement (TCE) acquisition from the Parkwood HOA and the Vance Family. The Vance Family owns a small area of land on the northeast corner of the intersection between the existing roadway and Parkwood Lake. This area of land was leftover from the original farmstead days, prior to the Parkwood developments. In order to meet the federal requirements for land acquisition, known as the "Uniform Act", the City had to do a "friendly condemnation" to acquire the ROW and TCE needed from the Vance Parcel. All surviving heirs to the Vance Estate have been paid at the "fair market value" for the land and have signed quit claim deeds over to the City. The last step in the process is to go to court on September 23, 2011 to officially transfer ownership of the proposed ROW over to the City. The money for the Parkwood HOA acquisitions has been escrowed into an account and is expected to close in the next week or two.