Terms to Note
Lowest Floor Elevation — Elevation of the lowest floor of the lowest enclosed area
(including bottom of basement or crawlspace). This is not the same as finished floor. The
lowest floor should be distinguished from finished floor on plans and reports.
Regulatory Flood Protection Elevation — For all floodplains except the Poudre River, the
regulatory flood protection elevation is eighteen (18) inches above the base flood
elevation. For the Poudre River floodplain, the regulatory flood protection elevation is
twenty-four (24) inches above the base flood elevation. If there is both a FEMA and a
City BFE, the higher BFE should be used to determine the regulatory flood protection
elevation.
Additional floodplain terminology is defined in Chapter 10 of City Code.
NOTE: Issues specific to individual sites may arise that result in additional
requirements. These will be discussed during initial meetings with the applicant.
The use of the structures is described. This is to determine if the structure is
residential, non-residential, or mixed -use. Also, structures in all 100- year and Poudre
River 500-year floodplains cannot be used as a critical facility. (See Chapter 10 of
City Code for definitions.)
The report describes how the development will be in compliance with the applicable
floodplain regulations (Chapter 10 of City Code). (Examples: elevation of lowest
floor above regulatory flood protection elevation, floodproofing, floodway
regulations, erosion buffer zone regulations, no -rise, etc.)
❑ The type of foundation construction for the structures (i.e. slab -on -grade, crawl space,
basement, etc.) is discussed in the report.
NA_ ❑ The type of foundation matches with the details shown on the grading plan.
❑ The report states that the lowest floor (including basement or crawl space) and HVAC
will be required to be elevated above the regulatory flood protection elevation. Non-
residential structures can be floodproofed instead of elevated to the regulatory flood
protection elevation.
tA/,A, ❑ If garages are not going to be elevated to the regulatory flood protection elevation,
then a note is included stating the following requirements:
❑ There shall be 1 square inch of venting for every 1 square foot of enclosed
area.
❑ There bottom of the venting shall not be higher than 1 foot above grade.
❑ The venting shall be on at least two sides, preferably on upstream and
downstream sides. (Does not have to be divided equally).
❑ If a non-residential structure is to be floodproofed, then 'a note is included stating that
all requirements on separate sheet titled "Floodproofing Guidelines" shall be met.
(Floodproofing guidelines can be obtained at http://fcgov.conVstormwater/pdf/fp-
floodproofing.pdf)
❑ For manufactured homes, a note is included stating that all submittal requirements on
separate sheet titled "Installation of a Mobile Home Located in a Floodplain:
Submittal Requirements" shall be met. (Mobile Home guidelines can be obtained at
_ http://fcgov.com/stormwater/pdf/fp-mobilhome.pdf)
The report states that a floodplain use permit will be required for each structure and
each site construction element (detention ponds, bike paths, parking lots, utilities,
etc.) in the floodplain.
❑_ A note is in the report stating that a FEMA elevation or floodproofing certificate
¢` be completed and approved before the CO is issued.
In the compliance section, Chapter 10 of City Code is listed.
❑ No driveways or parking areas.
0 No irrigated vegetation and non-native trees, grasses, or shrubs.
❑ No utilities except as necessary to cross streams or waterways.
❑ No grading or excavation except as required for permitted activities in
erosion buffer zone.
❑ No construction traffic except as required for permitted activities in
erosion buffer zone.
0 Any construction in the erosion buffer zone shows that it will not impact
the channel stability.
❑ Any necessary floodplain modeling has been submitted and approved. All modeling
must follow the City's floodplain modeling guidelines.
Special Poudre River Regulations
Poudre River Floodway Regulations have been met.
No construction of new residential, non-residential or mixed -use
structures.
No redevelopment of residential, non-residential or mixed -use structures.
P� No additions to residential, non-residential or mixed -use structures.
No fill unless hydraulic analysis shows "no -rise".
YPoudre River floodplain regulations have been met
l No construction of new residential or mixed -use structures
No additions to residential structures
C No additions to mixed -use structures if there is an expansion in the
residential -use area of the structure.
EX -No floatable materials on non-residential sites
Information Related to Structures in the Floodplain
04C ❑ The regulatory flood protection elevation shown on the plans is at least 2 ft above the
BFE for the Poudre River and at least 18" above the BFE for new development and
redevelopment, 6" above the BFE for additions, substantial improvement and
accessory structures for all other floodplains.
❑ A note is on the plans that the lowest floor (including basement or crawl space) and _
HVAC will be required to be elevated abo_ve the regulatory flood protection
elevation. Non-residential structures can be floodproofed instead of elevated to the
regulatory flood protection elevation.
N /P❑ A typical drawing detail is included for each foundation type proposed (slab -on -
grade, basement, crawl space) showing the elevation of the HVAC and lowest floor
elevation (which includes bottom of the basement or crawl space) relative to the BFE.
City of Fort Collins Floodplain Review Checklist
50 % Development Review Submittals
Instructions: Complete this checklist by marking all boxes that have been adequately
completed. Put an "NA" next to any items that are not applicable to this particular
submittal. Any boxes that are left blank and do not have an "NA" marked next to them
are considered incomplete.
Date of Review: Reviewer's Name:
Plat Map
The following required items are on the plat:
100-year floodplain boundary
❑ City
i� FEMA
❑ Floodway boundary
❑ City
❑ FEMA
XThe benchmark number and elevation of benchmark
These items match the FIRM. (FEMA Basin)
❑ These items match the Master Plan. (City Basin)
The benchmark number and elevation match with those published in the City of Fort
Collins benchmark system.
Site Plan
The following required items are on the site plan:
UL 100-year floodplain boundary- FEMA and City
0/p. ❑ 500-year floodplain boundary (if proposed structure is a "critical facility"
and a 500-year floodplain is mapped)
Floodway boundary
/or ❑ Erosion buffer zones
Restriction related to use (i.e. critical facility or no residential use of lower
floor if floodproofed mixed -use structure)
Drainage and/or Grading Plan (or a separate Floodplain Sheet if it is too cluttered on
Drainage and Grading Plan)
The
ing required items are on the drainage and/or grading plan:
_-1.00_.year_floodplain,boundary- FEMA.and_City__ __..__.__-_ _ _
500-year floodplain boundary (if proposed structure is a "critical facility"
and a 500-year floodplain is mapped)
Floodway boundary