Subject: RE: Mountain View Eye Specialists
Jerry,
Please see the attached submittal requirements and routing sheet (ignore the number requirements on the
requirements sheet and use the routing sheet numbers). The blue is the typical submittal requirements. I've
eliminated some department reviews as needed. Please resubmit the last letter with how you've addressed each
comment (that is the Planning Response).
Let me know when you plan to submit. We prefer the submittals to be done in person and we do not accept
incomplete submittals, so please make sure you have everything required.
Let me know if you have any questions.
Thanks,
Emma McArdle I City of Fort Collins
From: Jerry Davidson [mailto:jdavidson@perceptiondesigngroup.com]
Sent: Monday, May 30, 2011 11:46 PM
To: Emma McArdle
Cc: 'Micah Taintor'
Subject: Mountain View Eye Specialists
Emma,
The revisions to the planning documents are complete. How many sets do you want? Also the utility plans are
ready to re -submit. How many copies of those do you need?
Thanks,
JWD
Jerry W. Davidson, P.E.
Perception Design Group, Inc.
6732 West Coal Mine Avenue, Suite 419
Littleton. Colorado 80123
303-232-8088
303-520-2773 Cell
5/31 /2011
Pagel of 2
Emma McArdle
From:
Emma McArdle
Sent:
Tuesday, May 31, 2011 4:06 PM
To:
'Jerry Davidson'
Cc:
'Micah Taintor'
Subject: RE: Mountain View Eye Specialists
Jerry,
The Planning application fee is typically $1000, I've asked the Chief Planner to make a waiver for $500 rather
than the $1000. There is also a TDR fee for final of $1000, that is an Engineering fee and is part of the TDR
application form. The City's development review process is in 2 phases, PDP which goes to hearing, then Final
Plan, each have fees associated with them. This is in the Development review guide as indicated at conceptual
review.
Yes the application form is the same as the previously submitted one.
Drainage and Erosion Control Plan or Reports typically say `Preliminary" on them, for final we need those plans to
be updated indicating any comments that were made during development review. Wes had a comment in the
letter about addressing flows on the southern edge of the property at final. This needs to be addressed in the
Drainage Report for final. If there were no comments on the erosion control plan, then please submit a new one
with preliminary taken off of it, or if Wes is ok with using the previously submitted plan, it is fine with me. Either
you or I can email him to ask if you like, let me know if you want me to check with him.
I've already talked to Micah about the Mineral Rights Certification, so we're taken care of there.
I apologize if my email took you by surprise. Please let me know if you need any further clarification.
Emma McArdle I City of Fort Collins
From: Jerry Davidson [mailto:jdavidson@perceptiondesigngroup.com]
Sent: Tuesday, May 31, 2011 3:29 PM
To: Emma McArdle
Cc: 'Micah Taintor'
Subject: RE: Mountain View Eye Specialists
Emma,
A couple questions on the requirements.
How much more review fee do you need? Is it $5.00 or $500.
Is the application form the same one we submitted originally?
The Drainage and Erosion Control box is circled. We have previously submitted a drainage letter. There was no
mention of a requirement for an erosion control report in the comments. We provided an erosion control plan and I
don't believe there were any comments made on it.
Do we need to notify mineral holders on this site? Would that not have been before the hearing if required?
Thanks,
JWD
Jerry W. Davidson, P.E.
Perception Design Group, Inc.
6732 West Coal Mine Avenue, Suite 419
Littleton, Colorado 80123
303-232-8088
303-520-2773 Cell
From: Emma McArdle [mailto:EMcArdle@fcgov.com]
Sent: Tuesday, May 31, 2011 11:58 AM
To: Jerry Davidson
Cc: 'Micah Taintor'
5/31 /2011