HomeMy WebLinkAboutBUCKING HORSE FIRST FILING - PDP - PDP120010 - REPORTS - CORRESPONDENCE-NEIGHBORHOOD MEETINGA. We will try to save as many as we can. We also plan on planting a
significant number of new trees.
32. The Jessup Farm has a north -facing slope which may cause problems
for the internal access drives and the opportunity for solar gain. Have
you given any thought to these constraints?
A. Yes, we are aware of these conditions. We have a talented design
team that is prepared to address these issues.
33. What about chickens?
A. We anticipate having chickens at the Jessup Farm. We have not
reached a decision as to allowing backyard chickens (up to six
hens, no roosters, per City regulations) on the single family lots.
We know that the City now allows backyard hens but private H.O.A.
covenants can prohibit them.
34. What other projects has Bellisimo been involved in?
A. We have completed approximately 1,000 single family projects,
both new and remodels. We have done most of the office
development on Timberline Road south of Horsetooth Road. We
recently completed a commercial development on East Harmony
Road next to Front Range Village. We developed the Fossil Creek
Condos on Fossil Creek Parkway next to the park. We have done
numerous other projects that we can share with you if you would
like more examples.
35. 1 support a revised Sidehill project as you have envisioned but my
preference is that you honor the existing architectural theme that has
been established to date. In my opinion, Sidehill has a pleasing
consistency unlike Rigden Farm which is more eclectic.
A. Thank you for comment.
24. Where Haymarket intersects with Nancy Gray, in order to make a west
bound left turn, you have to turn right and go around the future
neighborhood park. This is inconvenient.
A. We are aware of this condition and will work with the City on how this
could be addressed, if at all.
25. The proposed trail system looks like a nice addition to the
neighborhood. Who would maintain this trail?
A. Maintenance would be the obligation of the H.O.A.
26. Would the horses from the proposed equestrian center be allowed on
the trail?
A. We envision a separate space for horses adjoining the trail that would
be of a softer surface like the crusher fines you see on the City's trails.
Like Parks and Rec, we want to separate the horses from the bicycles
and runners and walkers.
27. Would the trail be graded for handicap accessibility?
A. Yes, that is our intent.
28. Would there be multiple builders for the single family lots? If so, would
there be design guidelines for consistency?
A. Yes, there would be multiple builders and we are working on the
design guidelines which are not finalized yet.
29. Have you done your market study? Is there a demand for all these
lots?
A. It is our opinion that existing inventories are shrinking and that
absorption rates are rising. We think we are in a favorable position to
meet the anticipated demand as the market turns around.
30. Do you own the existing patio home lots? As you build these out, do
you plan on maintaining architectural consistency with what has
already been built?
A. Yes, these lots are permit -ready and our intention is to maintain
architectural consistency.
31. What about all the existing trees on the Jessup Farm? Will you save
the existing trees?
6
18. Who is Bellisimo Development?
A. We are a family -owned, multi -generational, local development and
construction company. As mentioned, we purchased the property from
a financial institution. Bucking Horse is our vision for a new master
planned community that features a wide variety of uses and a mix of
residential densities that will be unique to Fort Collins.
19. You mentioned that the undeveloped neighborhood park could include
a pool. Could you elaborate?
A. Essentially, whether or not a pool is included would be up to the H.O.A.
20. I'm concerned about additional traffic on Timberline Road. What about
congestion at the Timberline intersections with both Prospect and
Drake?
A. As mentioned, we will be required to submit a Transportation Impact
Analysis to the City. The traffic generated by Bucking Horse will be
evaluated. If we have to make improvements to the intersections
based on our trip generation, then we will do so. Keep in mind that the
City has classified Timberline Road as a major arterial so at full build -
out, it will have a total of six lanes, three in each direction like South
College Avenue. The east side of Timberline, north of Drake Road, is
already at its full major arterial width.
21. With the proposed multi -family apartments, what's the difference
between the number of dwelling units per the approved O.D.P. and the
proposed Amended O.D.P.?
A. We don't have the exact number at this time.
22. What do you see as the primary access to the project?
A. We see Nancy Gray Avenue as the primary access as it is classified as
a collector roadway. The other intersections along Timberline Road
are with local streets and may, in the future with a median, be limited to
right-in/right-out only access. There are two intersections along Drake
and we see Miles House as the primary access.
23. Regarding the multi -family, would these be apartments or condos?
A. We have not reached a decision on this yet.
W
A. At this point, we are planning on providing a separate amenity package
for the multi -family tenants so it is unlikely that they will have access to
the neighborhood pool.
12. What kind of retail are you envisioning for the Jessup Farm? Would
there be national retailers and national brands?
A. No, we are seeking locally owned and operated retailers. For
example, we are talking to a cheese company, bakery, coffee shop
and distillery all of which are local. We are planning on converting
some of the out -buildings and anticipate retail space for about 15
tenants. This is the vision behind the "Artisan Village."
13. Will a new gas line be needed?
A. The gas lines should be existing and located within the public right-of-
way so there should be no new construction activity for gas lines.
14. Spring Creek Farms North is a large-scale multi -family project south of
the Police Building with a high number of tenants. If these tenants
patronize your retailers, will there be enough parking?
A. We are planning on about 84 spaces within Artisan Village. Plus, with
the proposed network of trails, we are hoping that neighborhood
residents will find it convenient to walk or ride their bike.
15. What is your timeline for construction?
A. We plan on submitting to the City in next several weeks. A key
component of the submittal will be an Amended Overall Development
accompanied by the request for the Additions of Permitted Use. These
submittals could go to the Planning and Zoning Board in May. Then
the first P.D.P. phases would be the townhomes and Jessup Farm
(Artisan Village). These would go to public hearing later as the review
is more detailed.
16. Are the single family lots sufficiently separated from the railroad?
A. The separation varies. The multi -family would be a bout 60 feet from
the railroad and the single family would range from 20 to 50 feet.
17. Would the trail run along side the railroad right-of-way?
A. Yes, but we are intending to provide some meandering and buffering
so it is not a straight shot.
4
A. The townhomes would be constructed as attached single family
dwellings separated by a common wall but each would be on their own
individual lot. They would be two-story in height. The multi -family
would be apartments.
6. Is there enough parking for the multi -family?
A. Yes, we are required to provide a minimum amount of parking in order
to comply with the Land Use Code. The parking would be distributed
such that there would be a mix of surface parking and garage spaces.
7. Are any of the parcels in the floodplain? Some of the property appears
to be boggy.
A. No, but we are aware of the high groundwater. As the project moves
forward in phases, we will continue to monitor the groundwater level. If
necessary, we may have to do some de -watering.
8. What about the existing wildlife?
A. If the wildlife is found to be significant, we may required by the City to
perform an Ecological Characterization Study. This study would
evaluate the wildlife and determine if any mitigation is necessary. The
City's Environmental Planner would provide guidance on this issue and
we plan on working with the City to comply with all applicable
standards.
9. Would the Urban Estate lots be large enough for having horses?
A. Probably not since the lot sizes will likely not exceed one-half acre.
But, we plan on an equestrian facility where residents can board their
horses.
10. Regarding additional traffic on Drake, would there be any new traffic
signals on Drake in the area of the Johnson Farm and Cargill facility?
A. As part of our submittal to the City, we are required to provide a
Transportation Impact Study which will be prepared by our traffic
engineer. This analysis will help the City determine whether or not a
new traffic signal is warranted. Note that the City's traffic operations
department will not install a new signal unless it meets the necessary
warrants.
11. Would the tenants of the multi -family apartments be able to share the
neighborhood pool?
3
Another distinct phase is the 13-acre Jessup Farm along Timberline Road which
includes preserving the historic farmstead located at the north end of the site.
Referred to as "Artisan Village," this phase includes renovation of the existing
farmhouse, barn and other outbuildings. New uses include a restaurant in the
farmhouse and adding small-scale retail and commercial in the existing out-
buildings. A new child care facility is proposed. Two'new multi -tenant buildings
totaling 40,000 square feet would be available for a variety of tenants such as
food production or light industry. Five new single family lots are also proposed.
This area is zoned Industrial.
Unless otherwise noted, all responses are from the applicant or consultants.
QUESTIONS, CONCERNS, COMMENTS
1. Would the crossing of the railroad tracks by Nancy Gray Blvd. be at -
grade?
A. Yes, the crossing would be at grade and include on -street bike lanes.
This will allow better access from the neighborhood to the Poudre
River Trail
2. Would there be an increase in traffic?
A. Actually when compared with original Sidehill Overall Development
Plan, there would be a reduction in vehicle trips per day from 12,000 to
9,400.
3. Could you describe in more detail what the multi -family phase would
look like?
A. These would be a mix of two and three-story buildings. The two-story
buildings would be at the edge to allow a transition in density from the
single family lots. The three-story buildings would be in the middle.
The concept is to arrange the buildings around a central green and
clubhouse so the activity would be internal to the project.
4. Would you be purchasing the parcel that is supposed to be our private
neighborhood park?
A. Yes, we are purchasing this parcel. At this time, we are thinking about
a developing this as a play area, pool, and green space.
5. What's the difference between the townhomes and the multi -family?
2
NEIGHBORHOOD MEETING SUMMARY
PROJECT: Sidehill/ /Bucking Horse
DATE: March 19, 2012
APPLICANT: Mr. Gino Campana, Bellisimo, Inc.
CONSULTANTS: Craig Russell, Russell Mills Studios
Paul Mills, Russell Mills Studios
Nick Hawes, Northern Engineering
Matt Delich, Delich and Associates
CITY PLANNERS: Ted Shepard, Chief Planner, City of Fort Collins
As proposed, the request is to amend the balance of Johnson Property (Sidehill)
Overall Development Plan that remains vacant, including both the Jessup Farm
and Johnson Farm historic farmsteads. These parcels have been foreclosed
upon and were owned by the bank. This area consists of approximately 153
acres and is generally located east of Timberline Road and north of Drake Road.
The request would be to adjust the mix and location of single family, townhome
and multi -family dwellings in order to meet current market conditions. Amending
the Overall Development Plan allows the applicant to construct the project in
individual phases. The O.D.P. would be accompanied by a request for Additions
of Permitted Use to allow a wider variety of uses than otherwise would be
permitted under existing regulations. (There are three zone districts on the
property and not all proposed uses fit the zoning pattern.) The new project name
would be "Bucking Horse."
One distinct phase would include modifying the layout of the townhomes on the
three blocks along Timberline Road. Approximately 78 townhomes are proposed
within this 9.5 acre area. Another phase includes single family (30 acres) which
will not change significantly from the original plat. The proposed multi -family
parcel (24 acres) in the L-M-N zone is new phase and would be an Addition of a
Permitted Use.
The Urban Estate parcel would now be a cluster development plan consisting of
about 56 lots ranging in size from one -quarter acre to one-half acre on 26 acres.
Per the regulations for a cluster plan, about 50% of the U-E area would be
reserved as active open space for an equestrian facility and passive open space
including a community garden and a walking and biking trail. In addition,
preservation of the Johnson farmstead along Drake Road, with a possible office