HomeMy WebLinkAboutMALDONADO SUBDIVISION - PDP - PDP120021 - CORRESPONDENCE - (4)Department: Electric Engineering
Contact: Justin Fields, 970.224.6150, ifields(cDfcgov.com
1. Electric development and system modification charges will apply. Contact Light and Power Engineering
(970) 221-6700 for an estimate of these charges.
2. Utility easements may need to be granted depending on the location of the existing service to 412 N
Whitcomb and how service will be routed to the new lot.
3. The new meter location needs to be coordinated with Light and Power Engineering.
Current Planning
Contact: Jason Holland, 970.556.3176, ihollandt7afcgov.com
1. LUC 3.2.2(K) One parking space is required on each lot. Plan concepts A and B would meet this
requirement; Plan C would not meet the requirement. For the driveway layout, Plan B appears to be the
most desirable, however please consider adding a traditional planting strip along the center of the
driveway.
2. The proposed development project is subject to a Type 1 review and public hearing, the decision maker
for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is
not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to
notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and
location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid
potential hiccups that may occur later in the review process.
3. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
4. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards. The entire LUC is available for your review on
the web at http://www.colocode.com/ftcollins/landuse/begin.htm. .
5. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard
Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of
the LUC for more information on criteria to apply for a Modification of Standard.
6. Please see the Submittal Requirements and Checklist at:
hftp://www.fcgov.com/developmentreview/applications.php.
7. The request will be subject to the Development Review Fee Schedule that is available in the Community
Development and Neighborhood Services office. The fees are due at the time of submittal of the required
documents for the appropriate development review process by City staff and affected outside reviewing
agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal.
8. When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224-6143, Iex(cDfcgov.com
1. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4)
protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree
having DBH (Diameter at Breast Height) of six inches or more. If any trees on site have a DBH of greater
than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221-6361) to
determine the status of the existing trees and any mitigation requirements as the result of development
impacts.
2. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3),
requires that you use native plants and grasses in your landscaping or re -landscaping and reduce
bluegrass lawns as much as possible.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970.221.6603, actin gerich(.fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit.
Please contact Matt Baker at 224-6108 if you have any questions.
2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see: http://www,fcgov.com/engineering/dev-review.php
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced
or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of Occupancy.
4. Any public improvements must be designed and built in accordance with the Larimer County Urban Area
Street Standards (LCUASS). They are available online at:
hftp://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
5. This project is responsible for dedicating any right-of-way and easements that are necessary for this
project.
6. A Development Agreement is required and will be recorded once the project is finalized with recordation
costs paid for by the applicant.
7. Access will need to be granted to both property owners if a driveway is to be shared and the driveway is
not wide enough on each individual property for each owner to access on their property. For example,
options A and C will both require access easements. Option B allows access to each lot without
requiring access easements.
8. A drive approach permit may be required depending on the improvements, widening, and aligning of the
proposed driveway. This permit has been included with this letter and if you have any questions please
call Engineering Inspections (970) 221-6605.
9. Sidewalk width is 4.5' wide minimum for local street cross section. Verify if the sidewalk is actually 4 feet yAXl�cC
in width as shown on the sketches? The sidewalk will need to meet the minimum width standard. �Q _ �„
rrr-''1�
Department: Electric Engineering
Contact: Justin Fields, 970.224.6150, ]fields(7fcgov.com
Department: Stormwater Engineering
Contact: Glen Schlueter, 970.224-6065, gschlueter(a)fcgov.com
http://www.fcgov.com/utilities/businesstbuilders-and-developers/plant-investment-development-fees or
contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow ^� 1
required before the Development Construction permit is issued. The amount of the escrow is
determined by the design engineer, and is based on the site disturbance area or a minimum amount in Ljy
accordance with the Fort Collins Stormwater Design Criteria.
5. The design of this site must conform to the drainage basin design of the Old Town Master Drainage Plan
as well the City's Stormwater Criteria Manual.
Department: Historical Preservation
Contact: Josh Weinberg, 970.221.6206, iweinbera(.fcgov.com
Any exterior changes to or demolition of buildings 50 years old or older will need to be reviewed under
the City's Demolition/Alteration Review Process, Municipal Code Section 14-72. This process begins
with a determination of eligibility, which identifies the appropriate review process(es). The determination
of eligibility requires current color photographs, of all sides of each building or structure. Sufficient
photos should be taken to show the current condition of the building, especially any previous alterations
or additions. Digital photos are encouraged, and may be sent to jeinberg@fcgov.com or
kmcwilliams@fcgov.com. Hardcopies may be sent to P.O. Box 580, 80522; or dropped off at CDNS, 1st
Floor, 281 N. College Ave.
2. The eligibility of a property for landmark designation does not, in any way, designate the property as a
Landmark; it does define which of the various City review processes the development application would
be reviewed under. If any of the buildings or structures are found to be individually eligible for Landmark
designation, then the project would be reviewed for compliance with LUC Section 3.4.7. Section 3.4.7. is
intended to ensure that, to the maximum extent feasible: (1) historic sites, structures or objects are
preserved and incorporated into the proposed development and any undertaking that may potentially
alter the characteristics of the historic property is done in a way that does not adversely affect the integrity
of the historic property; and (2) new construction is designed to respect the historic character of the site
and any historic properties in the surrounding neighborhood.
3. Owners of properties that are eligible as landmarks may choose to have the property officially
recognized as a landmark, and then qualify for financial incentives. Financial programs include 20%
State Tax Credits, $7,500 yearly no -interest loans, $15,000 Historic Structure Assessment grants, State
Historic Fund grants of $200,000 and more, and, for income producing properties, an additional 20%
Federal Tax Credit. Any work, both interior and exterior, which protects or promotes a building's historic
character by meeting the Secretary of the Interior's Standards
(http://www.cr.nps.gov/hps/tps/standguide/index.htm) can qualify. For more details on financial
incentives, please contact Historic Preservation staff.
4. The Design Assistance Program pays for up to $2,000 each year, for the design of alterations, additions,
or new construction located in the Eastside and Westside Neighborhoods (roughly, north of Prospect,
and between Taft and Lemay). The owner selects from the Design Assistance Program Consultant's
Master List, and the design must meet the requirements of the city's building codes. This assistance is
available to anyone, regardless of the building's age or eligibility for designation.
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeals@fcgov.com
LUC 4.8(E)(4) The side setback is 5feet or 15 along a Street on a corner lot.
A site plan will be required with the replat to establish the shared driveway access. In turn a Modification
will be necessary for the garage to be placed zero (0) feet from the side property line and five (5) feet
from the rear property line. 1� �j
5. LUC 4.8(F) The development standards in this section do apply. t%X� f ql
" (ad r.od V
LUC 3.5.2(D) The garage standards in this section do apply.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffington0ftgov.com
Existing water mains and sanitary sewers in this area include an 8-inch water main and an 8-inch sewer in
Whitcomb.
2. The water and sewer services for the houses to the east (518 and 520 Cherry Street) extend from
Whitcomb east through this lot or the lot to the south (530 cherry Street).. These services need to be
located and possibly moved if there are conflicts with the proposed house.
3. Provide an easement for the water and/or sewer services on this site that extend to the houses to the
east
4. Development fees and water rights will be due.at building permit.
Department: Stormwater Engineering
Contact: Glen Schlueter, 970.224-6065, aschlueter(ftaov.com
1. It is important to document the existing impervious area since drainage requirements and fees are based
on new impervious area. An exhibit showing the existing and proposed impervious areas is required.
2. In the Old Town drainage basin a drainage and erosion control report and construction plans are required
if there is an increase in impervious area greater than 5000 square feet. They must be prepared by a
Professional Engineer registered in Colorado. If there is less than 5000 square feet of new impervious
area, a drainage letter should be sufficient to document the existing and proposed drainage patterns. If
there is less than 5000 but more than 350 square feet of new impervious area; a site grading and erosion
control plan is required instead of a complete construction plan set.
3. Water quality treatment is also required as described in the City's Stormwater Criteria Manual. Extended
detention is the usual method selected for water quality treatment; however the use of any of the BMPs is
encouraged. (http://www.udfcd.org/downloads/down_critmanual_vollll.htm)
4. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious
area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for
existing impervious area. These fees are to be paid at the time each building permit is issued.
Information on fees can be found on the City's web site at
It
Fort Collins
May 20, 2012
412 N WHITCOMB ST
Fort Collins, CO 80521-2044 .
Re: 412 N. Whitcomb
Community Development and
Neighborhood services
281 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6760
970.224.6134 - fax
fcgov.com
Description of project: This project proposes to subdivide one existing 9,000 s.f. lot into two new lots for
single family houses. The proposal is located in the Neighborhood Conservation Medium Density District
(N-C-M) and also within the boundaries of the West Side Neighborhood Plan area.
Please see the following summary of comments regarding the project request referrenced above. The
comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed
components of the project application. Modifications and. additions to these comments may be made at the
time of formal review of this project. If you have any questions regarding these comments or the next steps in
the review process, you may contact the individual commenter or direct your questions through the Project
Planner, Jason Holland, at 970-556-3176 orjholland@fcgov.com.
Comment Summary:
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeals &fcgov.com
1. Land Use Code (LUC) 4.8 In the Neighborhood Conservation Medium Density District (NCM) single family
detached is reviewed by a basic development review. However single family detached with more than
one principal structure on one lot is a Type 1 review.
If a replat is included then the whole proposal will be a Type 1 review.
2. LUC 4.8(D)(1) Each lot is required to have at least 5,000 sq ft for each single family dwelling.
Current proposal lot size does not meet the minimum standard and will require a Modification.
Density standards also requires that the lot be at least 2 times greater than the total square footage of the
buildings
3. LUC 4.8(D)(5) Floor Area Ratio for the rear one half of a lot is maximum of 33% square footage (note this
is not foot -print)
4. LUC 4.8(E)(1) The minimum lot width shall be 40 feet for each lot.
LUC 4.8(E)(2) The Front setback is 15 feet and 20 feet for garage doors.
LUC4.8(E)(3) The Rear setback is 15 feet from a non -alley and 5 feet from an alley.