August 27, 2012
Mr. Glen Schlueter
City of Fort Collins Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
RE: Maldonado Subdivision (412 N. Whitcomb St)
Response to 08/10/2012 Stormwater Engineering Comments
QE Project No. 6054-001
Dear Mr. Schlueter:
We offer the following responses to the Stormwater Engineering items listed in the city plan
review comment letter from you dated August 10, 2012. City comment references are listed in
italic text with our responses in bold.
Comment No. I Response:
Acknowledged. Please see the attached grading/drainage/erosion control plan and
drainage letter.
Comment No. 2 Response:
Acknowledged. Please see the attached grading/drainage/erosion control plan and
drainage letter. Existing drainage has been documented and is shown on the existing
drainage plan. Proposed drainage is shown on the grading/drainage/erosion control plan.
As shown in the drainage letter, the proposed drainage flowing to the east is less than the
existing runoff. Since the house and garage layout currently shown is very conceptual, the
exact downspouts and gutters will not be known until time of building permit submittal.
Basin lines have been drawn showing a worst -case roof drainage scenario and an updated
grading plan should be submitted at time of permit if the house layout is significantly
different than as proposed.
Comment No. 3 Response:
Acknowledged. See report discussion.
Comment No. 4 Response:
Acknowledged. Please see the impervious area exhibit attached to the drainage letter.
QUALITY ENGINEERING, LLC (970) 416-7891 724 BRAMBLEBUSH STREET FORT COLLINS, COLORADO
Page 2
RE: Maldonado Subdivision (412 N. Whitcomb St)
Response to 08/10/2012 Stormwater Engineering Comments
QE Project No. 6054-001
Comment No. 5 Response:
Acknowledged.
Comment No. 6 Response:
Acknowledged.
Comment No. 7 Response:
Acknowledged. Please see revised plans showing 5' easements at the north, south, and east
property lines as well as two 5' easements at the shared property line. There will be no
access easement.
We are confident that we have addressed your concerns. If you have any questions or require
additional information please contact us at (970) 416-7891.
Sincerely,
QUALITY ENGINEERING, LLC
9" -DP Lt0�
O?`sF .F2s
41326 T
Cody sendorfer, P. 'O m,
Cc: Christine Maldonado �FSS/ONAL
Dennis Sovick