Loading...
HomeMy WebLinkAboutMALDONADO SUBDIVISION - PDP - PDP120021 - CORRESPONDENCE -J� Department: Technical Services Contact: Jeff County, 970.221.6588, bounty@fcgov.com Topic: Building Elevations Comment Number: 19 09/11/2012: No comments. Topic: Plat Comment Number: 1 09/11/2012: The subdivision boundary closes. 08/07/2012: The subdivision boundary closes. Comment Originated: 09/11/2012 Comment Originated: 08/07/2012 Comment Number: 5 Comment Originated: 08/07/2012 09/11/2012: This has not been addressed. Please show both right of way lines, and the right of way widths. 08/07/2012: Please show the full street right of way on all streets with the widths. - Comment Number: 9 Comment Originated: 08/07/2012 09/11/2012: Per phone conversation, please describe method of block breakdown. 08/07/2012: Please label the record calls, and change the north & south lines to distances of 90.00'. Comment Number: 17 Comment Originated: 09/11/2012 09/11/2012: Please correct the descriptions of all easements that have changed since the last review. Topic: Site Plan Comment Number: 18 Comment Originated: 09/11/2012 09/11/2012: No comments. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970.221.6854, rbuffington( fcgov.com Topic: General Comment Number: 2 Comment Originated: 09/07/2012 09/07/2012: Connect Lot 2 to the existing tap which currently serves 520 Cherry and install a new tap farther to the south for the re -located water service for 520 Cherry. this will avoid the confusion of having the water services crossing one another. Department: Zoning Contact: Peter Barnes, 970.416.2355, pbarnesna.fcgov.com Topic: Building Elevations Comment Number: 6 Comment Originated: 09/05/2012 09/05/2012: The site plan shows the future home on Lot 2 to be at a 5' setback from the south lot line. At a 5' setback, the maximum height of the building wall along that side can't exceed 18'. It appears that the height of the south wall on the illustrations for Houses #1 and #2 exceed that (about 25' for House 1 and 20' for House 2). r Department: Engineering Development Review Contact: Andrew Gingerich, 970-221.6603, agingerich(a,fcgov.com Topic: General Comment Number: 6 Comment Originated: 09/12/2012 09/12/2012: Please note that since this is a site plan document that at the time of final mylars a copy will need to be provided to Engineering along with with signed paper copies for inspection staff. Comment Number: 8 Comment Originated: 09/12/2012 09/12/2012: Engineering still has some concern on how the water and sanitary sewer services will tie to the connections on the front of Lot 2 and if this impact the existing sidewalk or if street cuts will be required in Whitcomb. Topic: Site Plan Comment Number: 7 Comment Originated: 09/12/2012 09/12/2012: Please add a note 5) similar to the following; " Water and Sewer service are proposed for adjacent lot to the east. Contractor shall coordinate with adjacent property owner regarding replacement and service outage prior to starting work on these services. Contractor shall notify City of Fort Collins Water/Wastewater Department prior to starting work." Department: Environmental Planning Contact: Lindsay Ex, 970.224-6143, lex(fcgov.com Topic: General Comment Number: 1 07/31/2012: No comments. Department: Park Planning Contact: Craig Foreman, 970.221.6618, cforeman(o)fcgov.com Topic: General Comment Number: 1 07/20/2012: No comments Department: Stormwater Engineering Contact: Wes Lamarque, 970.416.2418, wlamargue(a)fcgov.com Topic: General Comment Number: 8 Comment Originated: 07/31/2012 Comment Originated: 07/20/2012 Comment Originated: 09/12/2012 09/12/2012: Please add swale cross -sections on the grading plan per redlines. Comment Number: 9 Comment Originated: 09/12/2012 09/12/2012: Please add the basin summary table on the grading plan and label Qexist and Qprop at the design points. Department: Technical Services Contact: Jeff County, 970.221.6588, icounty(�fcgov.com C0 tµMbl J`i S City of Fort Collins September 17, 2012 Christine Ann Maldonado 412 N. Whitcomb St. Fort Collins, CO 80521 RE: Maldonado Subdivision (412 N. Whitcomb St.), PDP120021, Round Number 2 Community Development and Neighborhood services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224,6134 - fax fcgov.com/deve/opmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com. Comment Summary: Department: Current Planning Contact: Jason Holland, 970.224.6126, jhollandna.fcgov.com Topic: General Comment Number: 2 Comment Originated: 09/10/2012 The proposed shade tree needs to be moved to the north or south so that 6 feet of separation exists from the utility service lines. Please relocate to the tree parkway area between the curb and sidewalk, and label the tree as 3" caliper. Comment Number: 3 Comment Originated: 09/10/2012 Please. add a label on the lot one garage indicating 264 sq. feet Comment Number: 4 Comment Originated: 09111/2012 Indicate the location of the existing trees to be removed. Also, show the existing crabapple location so that potential conflicts with utilites can be determined. Comment Number: 5 Comment Originated: 09/17/2012 Add a note to the plan: Refer to Sheet Al for the approved building elevations for this plan. Building elevations shall be positioned in the buiding envelope in accordance with the setback and building height requirements in Land Use Code Section 4.8(E)(4). Comment Number: 6 Comment Originated: 09/17/2012 Shift House footprint 2 north on the plan to conform with 4.8(E)(4), and show a dimension on the plan indicating the distance the footprint is set back from the south property line. It appears that House #1 will need an additional 5 feet of setback and House #2 will need an additional 2 feet of setback. This is estimated based on the scaled drawing, the exact heights are not shown. Department: Engineering Development Review