Loading...
HomeMy WebLinkAboutZIEGLER - HARVEST PARK - PDP - PDP120033 - CORRESPONDENCE -Bob Bob Rulli Field Engineer Centuryl-ink 3702 Automation Drive Suite 106 Fort Collins, CO 80528 Direct: (970) 490.7503 Cell: (970) 988.2120 robert. rulliacentur✓link.com SherryAlbertson-Clark From: Emma McArdle S Sent: Tuesday, December 18, 2012 11:45 AM To: 'Rulli, Robert' Cc: Sherry Albertson -Clark Subject: RE: 5305 Ziegler Road Multi family Hi Bob, I do not work in this department anymore, but I wanted to forward your message to Sherry bertson Clark, the planner for the project you are referring to. She is cc'd on this email and can respond to your quest' ns better than I can at this time. Thanks, and good luck with your review of this project. Emma McArdle ( Transfort / 1� From: Rulli, Robert [mailto:Robert. Rulli(aCenturyLink.com] Sent: Tuesday, December 18, 2012 11:31 AM a ,� To: Emma McArdle (/V Cc: Rulli, Robert Subject: 5305 Ziegler Road Multi family Hi Emma, / 6 We just received RDP120033 Ziegler Harvest Parkd PD Type II request for comments. Couple of things: cCenturylink has facilities (copper cable) -on the west side of Ziegler road that currently feeds this house and the adjacent one to the north. To relocate that access pedestal will beat the developers expense as may conflict with the extension of County Fair Lane into Saber Cat Drive. There is also a fiber line running express through here south to fossil lake ranches. The copper line may also need to be extended south to service these 4 buildings (at CTL expense) however, once that access ped is established in the city utility easement, it will be the developer/builders responsibility to provide a backbone and entrance conduits to the buildings from that point. Because these are only 6 plexes at most, the current design is to service with dual 6-Pair service drops from the access pedestal This will provide spare capacity should any tenant need more than one line to their unit. No actual design will be put in place until the construction permit is issued. It will also be required by the builder to provide a suitable backboard on the units to mount network interface units (as on a single family residence) along with proper grounding. Lastly, It appears that a new storm water line will need to be placed from Ziegler south to the wetlands area. Centurylink has a backbone fiber (mentioned above) that runs along the west side of Ziegler to feed Fossil Lake. If the installation of the SS line (or the road build) conflicts with the fiber in the city utility easement, it will be lowered or raise at the developers expense. Because the CTL policy is to engineer and release the job to construction ONLY once the estimated bill is paid, it's imperative for the developer to locate existing utilities via potholing to determine any conflicts well in advance and any last minute conflicts/resolutions will inevitably impact their times. Thank you in advance,