HomeMy WebLinkAboutWILLOW BROOK, FILING THREE - FDP - 32-10/A - CITY COUNCIL PACKET - RECOMMENDATION/REPORTEXHIBIT A
CENTER QUARTER CORNER SEC
4-6-68 FOUND q6 REBAR WITH _
2-1/2" ALUMINUM CAP LS 33193
ROCK CREEK DRIVE _ _ BASIS OF BEARINGS — EAST 1/4 CORNER SEC 4-6-68
�0' POINT OF BEGINNING S 88'36'36" E 2642.45' 6) S?,, S 88-36.36" E FND. #6 REBAR WITH 2-1/2"
S0 f _ —S 88'36'36" E—
261.20' B7.00' L=23 56' ALUMINUM CAP LS 33193
1 — — -
L=23.56'
R-15.00'
I A= 90'00' 00"
Ch=N 43'36'36" W
21.21'
k
y�I
>
I
v
PARCEL A
WILLOW BROOK
0
�I
01
a
J
I
I
L=23.56'
R=15.00'
6=90'00'00"
Ch=N 46'23'24" E
21.21'
I
— GALILEO DRIVE
Fi=15.00'
A=90'"
Ch=S
46'23'23'24" W
NOTE: THIS EXHIBIT DRAWING IS NOT INTENDED TO BE
A MONUMENTED LAND SURVEY. ITS SOLE PURPOSE IS
21.21
AS A GRAPHIC REPRESENTATION TO AID IN THE
a'
VISUALIZATION OF THE WRITTEN DESCRIPTION WHICH
aq
IT ACCOMPANIES. THE WRITTEN DESCRIPTION
oQ
SUPERSEDES THE EXHIBIT DRAWING.
x�U
U
m
Sheet 2 of 2
No
X
W
W
rn
Z
PARCEL B
3
WILLOW BROOK
to
0
N
Ix
N
F
o
En
In
N N
V1CJ
V
r a ¢
vq n o
100 0 100 200
N a) a
O V
z
scale 1"=200' feet
L=23.56'
R=15.00'
/—A-90'00'00"
Ch=S 43'36'36' E
21.21'
N 88'36'36" W —
81.00' — —
T—r—
imTST, INC. CGNSVLTING ENGINEERS
760 Whalen Way, Bldg. C
Fort Collins. Colorado
Phone: 970.226.0557
Fax: 970.226.0204
Job No. 0963.0005.00
Rename: 0963.0005\ROW Vocation PDP.dwg
February 24. 2011
EXHIBIT A
RIGHT OF WAY VACATION
FOR STAR DUST LANE
WILLOW BROOK
THE RIGHT OF WAY FOR STAR DUST LANE AS SHOWN ON THE PLAT OF WILLOW BROOK
RECORDED AUGUST 27, 2001 UNDER RECEPTION NO. 2001075030 BEING MORE
PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT THE CENTER OF SAID SECTION 4, A NO. 6 REBAR WITH ALUMINUM CAP,
L.S. 33193 IN MONUMENT BOX; THENCE SOUTH 54"20'52" EAST, A DISTANCE
OF 67.50 FEET TO THE NORTH LINE OF PARCEL A, WILLOW BROOK; THENCE SOUTH
88"36'36" EAST, ALONG THE NORTH LINE OF SAID PARCEL A, A DISTANCE OF 261.20 FEET
TO THE POINT OF BEGINNING;
THENCE SOUTH 88036-36" EAST, CONTINUING ALONG THE NORTH LINE OF SAID PARCEL
A, A DISTANCE OF 81.00 FEET TO THE BEGINNING OF A NON TANGENT CURVE TO THE
LEFT; THENCE 23.56 FEET ALONG THE ARC OF SAID CURVE TO THE LEFT HAVING A
RADIUS OF 15.00 FEET, A CENTRAL ANGLE OF 90000'00", AND BEING SUBTENDED BY A
CHORD WHICH BEARS SOUTH 46'23'24". WEST, A CHORD DISTANCE OF 21.21 FEET;
THENCE SOUTH 01023'24" WEST, A DISTANCE OF 544.69 FEET TO THE BEGINNING OF A
TANGENT CURVE TO THE LEFT; THENCE 23.56 FEET ALONG THE ARC OF SAID CURVE TO
THE LEFT HAVING A RADIUS OF 15.00 FEET, A CENTRAL ANGLE OF 90"00'00% AND BEING
SUBTENDED BY A CHORD WHICH BEARS SOUTH 43"36'36" EAST, A CHORD DISTANCE OF
21.21 FEET; THENCE NORTH 88°36'36" WEST, A DISTANCE OF 81.00 FEET TO THE
BEGINNING OF A NON -TANGENT CURVE TO THE LEFT; THENCE 23.56 FEET ALONG THE
ARC OF SAID CURVE TO THE LEFT HAVING A RADIUS OF 16.00 FEET, A CENTRAL ANGLE
OF 90000'00", AND BEING SUBTENDED BY A CHORD WHICH BEARS NORTH 46023'24" EAST,
A CHORD DISTANCE OF 21.21 FEET; THENCE NORTH 01"23'24" EAST, A DISTANCE OF
544.69 FEET TO THE BEGINNING OF A TANGENT CURVE TO THE LEFT; THENCE 23.56 FEET
ALONG THE ARC OF SAID CURVE TO THE LEFT HAVING A RADIUS OF 15.00 FEET, A
CENTRAL ANGLE OF 90"00'00", AND BEING SUBTENDED BY A CHORD WHICH BEARS
NORTH 43036'36" WEST, A CHORD DISTANCE OF 21.21 FEET TO THE POINT OF
BEGINNING.
SAID RIGHT OF WAY CONTAINS 29,502 SQUARE FEET (0.677 ACRES), MORE OR LESS.
BASIS OF BEARINGS: ASSUMED SOUTH 88"36'36" EAST ALONG THE NORTH LINE OF THE
SOUTHEAST QUARTER OF SECTION 4; TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6T"
P.M., SAID LINE BEING MONUMENTED AT BOTH ENDS BY NO. 6 REBARS WITH 2 '/"
ALUMINUM CAPS, L.S. 33193 IN MONUMENT BOXES. ALL BEARINGS SHOWN HEREON ARE
RELATIVE THERETO. _,Goazmv�
PREPARED FOR AND QOY8SHALf AQF_-.Te&INC.
31j
L�jfiLtf Q, I
LAINE A. LANDAU F' •.•
COLORADO P.L.S. 31159 `�'/OfyAt�pS10
K:1963100051documents\RO ar Dust Vacation Description.doc
Sheet 1 of 2
Passed and adopted on final reading on the 3rd day of May, A.D. 2011.
Mayor
ATTEST:
City Clerk
ORDINANCE NO. 049, 2011
OF THE COUNCIL OF THE CITY OF FORT COLLINS
VACATING THE RIGHT-OF-WAY FOR STAR DUST LANE AS
DEDICATED ON THE PLAT OF WILLOW BROOK
WHEREAS, on February 2, 2011, the Decision Maker under the Land Use Code approved
an application for approval of a project development plan (PDP) for a project entitled "Willow
Brook Filing No. 3", which PDP replats said property and right-of-way; and
WHEREAS, the original plat of Willow Brook PDP includes a dedication to the public of
right-of-way for Star Dust Lane; and
WHEREAS, the approval of Willow Brook Filing No. 3 necessitates the vacation of the
right-of-way for Star Dust Lane as dedicated on the plat of Willow Brook, which proposed vacation
is more particularly described on Exhibit "A", attached hereto and incorporated herein by this
reference; and
WHEREAS, said right-of-way is no longer necessary or desirable to retain for street
purposes due to the approval of Willow Brook Filing No 3, which does not utilize the prior street
layout; and
WHEREAS, pertinent City agencies and private utility companies have been contacted and
reported no objection to the proposed vacation; and
WHEREAS, the right of the residents of the City will not be prejudiced or injured by the
vacation of said street right-of-way.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF FORT
COLLINS that the street right-of-way for Star Dust Lane, more particularly described on Exhibit
"A" attached hereto and incorporated herein by this reference, is hereby vacated, abated and
abolished.
Introduced, considered favorably on first reading, and ordered published this 19th day of
April, A.D. 2011, and to be presented for final passage on the 3rd day of May, A.D. 2011.
ATTACHMENT
DATE: April 19, 2011 L AGENDA ITEM SUMMARY•
STAFF: Andrew Carney FORT COLLINS• •
First Reading of Ordinance No. 049, 2011, Vacating the Right -of -Way for Star Dust Lane as Dedicated on the Plat of
Willow Brook.
EXECUTIVE SUMMARY
In 2001, the Willow Brook Plat, located between Rock C�eek1Drive-to th&#rth and Kechter Road to the southeast
of Lady Moon Drive and west of North` Lights`D`�platted several lots and public streets. Star Dust Lane was
originally dedicated to provide access to -Parcels A -and B, located southeast of Rock Creek Drive and Lady Moon
Drive. To date, neither Parcel A nor B have been developed. The property owner has requested that the Star Dust
right-of-way be vacated to allow the parcels to be replatted into 61 single family lots that will be served by three new
internal streets taking access off of Galileo Drive.
BACKGROUND / DISCUSSION
The property that Star Dust Lane would serve is currently going through the development review process and the
project is in final review. The proposed design prod desaccessto_-tne va\ious lots with three new internal streets. The
vacation of this roadway does not impact the ability to develop or provide adequate access to this property in the future.
LJ
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on First Reading.
PUBLIC OUTREACH
All public and private utilities have been not e`d of th_. posed vl aca; ion annd they report no objections to the vacation.
1_)) y
ATTACHMENTS (�
Location map
Second Reading of Ordinance No. 049, 2011, Vacating the Right -of -Way for Star Dust Lane as Dedicated on the Plat
of Willow Brook.
EXECUTIVE SUMMARY
In 2001, the Willow Brook Plat, located between Rock Creek Drive to the north and Kechter Road to the southeast
of Lady Moon Drive and west of Northern Lights Drive, platted several lots and public streets. Star Dust Lane was
originally dedicated to provide access to Parcels A and B, located southeast of Rock Creek Drive and Lady Moon
Drive. To date, neither Parcel A nor B have been developed. This Ordinance, unanimously adopted on First Reading
on April 19, 2011, vacates the Star Dust right-of-way at the request of the owner, to allow the parcels to be replatted
into 61 single family lots that will be served by three new internal streets taking access off of Galileo Drive.
Vacations of public right-of-way are governed by City Code Section 23-115, which provides for an application and
review process prior to submission to the City Council for formal consideration. The process includes review by
potentially affected utility agencies, City staff, emergency service providers, and affected property owners in the vicinity
of the right-of-way proposed to be vacated. This review process was followed in connection with this proposal, and
based on comments received, the City Engineer has recommended that the vacation be approved.
STAFF RECOMMENDATION
Staff recommends adoption of the Ordinance on Second Reading.
ATTACHMENTS
Copy of First Reading Agenda Item Summary - April 19, 2011
(w/o attachments)