Loading...
HomeMy WebLinkAboutWILLOW BROOK, FILING THREE - PDP - 32-10 - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDYDELICH ASSOCIATES Traffic & Transportation Engineering � f j 2272 Glen Haven Drive Loveland, Colorado 80538 A Phone: (970) 669-2061 Fax: (970) 669-5034 �7s r MEMORANDUM TO: Peter Benson, Village Homes�L Ryan Banning/Jen Torrey, TST Inc. City of Fort Collins FROM: Matt Delich DATE: December 16, 2010 SUBJECT: Willow Brook, Filing 3 ITIS — Response to City staff comments (File: 1048ME02) This memorandum responds to Comment 42 from Ward Stanford as contained in the Staff Comment Review letter dated December 10, 2010. The comment refers to incorrect posted speeds on Harmony Road and Kechter Road in the "Willow Brook, Filing 3 Intermediate Transportation Impact Study" dated November 2010. The incorrect posted speeds impact the reported operation at the Harmony/Lady Moon -HP East Access intersection and the Kechter/Lady Moon intersection. The short range (2015) morning and afternoon peak hour analyses at the Harmony/Lady Moon -HP East Access intersection were rerun with the 55 mph posted speed on Harmony Road. At the higher speed, the level of service categories for all movements do not change. The overall calculated delay at the intersection increases by 0.1 seconds in each of the peak hours. The short range (2015) morning and afternoon peak hour analyses at the Kechter/Lady Moon intersection were rerun with the 40 mph posted speed on Kechter Road. At the higher speed, the level of service categories and the calculated delay for all movements does not change. It is concluded that the higher posted speeds on Harmony Road and Kechter Road do not have a significant impact on the operation of these intersections.