HomeMy WebLinkAboutWILLOW BROOK, FILING THREE - PDP - 32-10 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYLIST OF TABLES
1. Current Peak Hour Operation.....................................................................................6
2. Trip Generation..........................................................................:... 9
3. Short Range (2015) Background Peak Hour Operation .................... :....................... 16
4. Short Range (2015) Total Peak Hour Operation......................................................18
1.
2.
3.
4.
5.
6.
7.
8.
I
C.
D.
E.
LIST OF FIGURES
SiteLocation..............................................................................................................3
Recent Peak Hour Traffic............................................................... 5
SitePlan..................................................................................................................10
TripDistribution.......................................................................................................11
Short Range (2015) Background Peak Hour Traffic................................................12
Site Generated Peak Hour Traffic............................................................................14
Short Range (2015) Total Peak Hour Traffic...........................................................15
Short Range (2015) Geometry ................................................................................20
APPENDICIES
Base Assumptions Form/Recent Peak Hour Traffic
Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
Short Range (2015) Background Peak Hour Operation
Short Range (2015) Total Peak Hour Operation
Pedestrian/Bicycle Level of Service
--/,/ L—DELICH Willow Brook, Filing 3 TIS, November 2010
-7.0,; [—ASSOCIATES
TABLE OF CONTENTS
1. INTRODUCTION .......................................................................................................1
II. EXISTING CONDITIONS.....................................
....................................................2
LandUse.........................................................................................................................2
Roads..............................................................................................................................2
ExistingTraffic.................................................................................................................4
ExistingOperation...........................................................................................................4
PedestriansFacilities.. .....................................................................................................
4
BicycleFacilities:.............................................................................................................8
TransitFacilities...............................................................................................................8
III. PROPOSED DEVELOPMENT.................................................................................9
Trip Generation...............................................................................
.................................9
TripDistribution...............................................................................................................9
Background Traffic Projections ........................................................................................
9
TripAssignment.............................................................................................................13
SignalWarrants .......... :................................................................
.................................. 13
OperationAnalysis...........................................................................................
............13
Geometry................................................................................................................:......13
Pedestrian Level of Service...........................................................................................13
Bicycle Level of Service.................................................................................................21
Transit Level of Service.................................................................................................21
IV. CONCLUSIONS/RECOMMENDATIONS..............................................................22
—/,/.LDELICH Willow Brook, Filing 3 TIS, November 2010
%1:I—ASSOCIATES
WILLOW BROOK, FILING 3
INTERMEDIATE TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
NOVEMBER 2010
Prepared for:
Village Homes
8480 E. Orchard Road, Suite 100
Greenwood Village, CO 80111
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
'00 REG/
' .� sF