Loading...
HomeMy WebLinkAboutMOUNTAIN VIEW EYE SPECIALISTS @ RIGDEN FARM - FDP - FDP110012 - CORRESPONDENCE -Community Devei. vment and Neighborhood Services Gty of 281 North College Avenue Fort Collins PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to contact me at 970-221-6206. Sincerely, Emma McArdle City Planner Staff Review Letter Generated: 6/29/2011 at 10:38 am :- City, of F6rt Collins Community Devei.yment and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax fcgov.com Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wiamargue(a)fcaov.com Topic: General Number: 1 Issue Originated: 06/28/2011 06/28/2011: Please add the City's standard erosion control notes to the plans. An electronic version can be emailed to you. Number: 2 Issue Originated: 06/28/2011 06/28/2011: The construction fence needs to be replaced with silt fence to protect the Swale to the south and the property to the east. Number: 3 Issue Originated: 06/28/2011 06/28/2011: An erosion control escrow of $3,000 is required at time of building permit. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(a)fcgov.com Topic: Building Elevations Number: 45 Issue Originated: 06/24/2011 06/24/2011: No comments. Topic: Construction Drawings Number: 46 Issue Originated: 06/24/2011 06/24/2011: Is the title on sheet C5 correct? Sheet C1 shows it as grading only. Topic: Landscape Plans Number: 44 Issue Originated: 06/24/2011 06/24/2011: No comments. Topic: Site Plan Number: 43 Issue Originated: 06/24/2011 06/24/2011: No comments. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffingtoripfcaov.com Topic: General Number: 1 Issue Originated: 06/28/2011 06/28/2011: Legal description not received. May have been routed to Engineering. Department: Zoning Contact: Gary Lopez, 970-416-2338, cllopez(fcpov.com Topic: General Number: 1 Issue Originated: 06/29/2011 06/29/2011: no comment 3 Staff Review Letter Generated: 6/29/2011 at 10:38 am F6r Cottins t``%�, Department: Engineering Development Review Community Deveiu,.ment and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Contact: Susan Joy, 970-221-6581, siov(cDfcgov.com Topic: Easements Number: 10 Issue Originated: 06/28/2011 06/28/2011: The legal description is currently under review. Please email me at sjoy@fcgov.com for the dedication statement which will need to be completed and notarized. Filing fees with the County will apply. Topic: General Number: 1 Issue Originated: 06/28/2011 06/28/2011: Repeat Comment - A sidewalk connection is still missing to Lot 3 to the east. Number: 2 Issue Originated: 06/28/2011 06/28/2011: All plan sets and sheets need to show the existing sidewalk and ramps on the west side of Lot 1 and along Custer Drive. Topic: Landscape Plans Number: 8 Issue Originated: 06/28/2011 06/28/2011: Landscape Plan - title needs to match the Site and Utility plan sets. Number: 9 Issue Originated: 06/28/2011 06/28/2011: Missing the proposed easement or mislabeled as existing? Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine(cDfcgov.com Topic: General Number: 1 Issue Originated: 06/15/2011 06/15/2011: A location for an electric transformer will need to be coordinated. The transformer is approximately Tx 5' (plus required clearances), and must be located within 10' of an all-weather surface accessible to a utility line truck. It appears that some landscaping will need to be adjusted to provide for this transformer. Please contact Doug Martine at (970)224-6152 with any questions. Department: PFA Contact: Carie Dann, 970-219-5337, CDANN(Wpoudre-ffre.org Topic: General Number: 1 Issue Originated: 06/28/2011 06/28/2011: Thank you for the additions and clarifications. PFA has no additional comments or concerns at this time. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue(a)fcgov.com Topic: General 2 Staff Review Letter Generated: 6/29/2011 at 10:38 am Fort Collins June 29, 2011 Micah Taintor Ymker Building, LLC 3108 NW 15th Street Ankeny, IA 50023 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6760 970.224.6134 - fax /cgov.com City staff and outside reviewing agencies have reviewed your submittal for Mountain View Eve Specialists Ca. Rioden Farm, and we offer the following comments: Department: Current Planning Contact: Emma McArdle, 970-221-6206, emcardleofcgov.com Topic: General Number: 1 Issue Originated: 06/28/2011 06/28/2011: Ready for mylar plans. Make sure that all signatures are completed on the ownership end and that a bold black pen is used (like a sharpy not a ball point pen). Department: Engineering Development Review Contact: Susan Joy, 970-221-6581, sioy(afcgov.com Topic: Construction Drawings Number: 3 Issue Originated: 06/28/2011 06/28/2011: Repeat Comment - Please remove the "site plan" from the utility set. All construction information must be placed on the appropriate sheet within the set itself. Number: 4 Issue Originated: 06/28/2011 06/28/2011: Cover Sheet - General Notes, Line 48 - add "NA" Number: 5 Issue Originated: 06/28/2011 06/28/2011: Horizontal Control Plan - Missing the proposed easement. Number: 6 1 Issue Originated: 06/28/2011 06/28/2011: Horizontal Control Plan - All sidewalks need to be dimensioned and labeled on the horizontal control sheet and then shown on each sheet throughout the plan set (lineweights will suffice as you have the labeling on the horizontal control sheet). Number: 7 Issue Originated: 06/28/2011 06/28/2011: Grading Plan = correct the sheet title to match the index by removing "and erosion control'. There is a separate erosion control sheet already. Topic: Easements 1 Staff Review Letter Generated: 6/29/2011 at 10:38 am