HomeMy WebLinkAboutWILLOW BROOK, FILING THREE - PDP - 32-10 - CORRESPONDENCE -Number: 58 Created: 1 /4/2011
[1/4/11] Please correct the description of benchmark 17-01 on sheet 2 of the Utility Plans.
-Fixed
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 21 Created: 12/7/2010
11/7/11]
[12/7/10] Stormwater is ready for a hearing. —Acknowledged.
Number: 23 Created: 12/7/2010
[1/7/11]
[12/7/10] At final, a detailed lot grading plan is required. —Now Provided
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely:
Ted Shepard
Chief Planner
Page 4
2006 International Fire Code 502.2 2006 International Fire Code 505.2 -Street name
changed to Explcraticr Lane per discussions with PFA.
Department: Traffic Operations Issue Contact: Ward Stanford
Topic: Landscape Plan
Number: 43 Created: 12/8/2010
[1/5/11] Prefer the tree labeling take place currently. Reason for wanting the species
labeled is to discern any canopy height/width issues in relation to sight distances and
regulatory signage visibility. Please provide a revised Landscape plan before Final to
eliminate the possibility of changes at that late date.
[12/8/10) The Landscape Plan does not indicate the tree specie being used on the public
roadways. Please label the tree symbols on the plan. -Now provided
Department: Technical Services Issue Contact: Jeff County
Topic: Landscape Plan
Number: 10 Created: 12/6/2010
[1/4/11] There is still line over text issues on Landscape Plan sheet 2.
[12/6/10] There are many line over text issues on Landscape Plan sheet 2.
Number: 55 -For After 1" Reading of Vacation Created: 1/4/2011
[1/4/11] Please add the ROW Vacation Ordinance # to Landscape Plan sheet 2 prior to
filing. -Acknowledged. Will provide after first reading of ROW Vacation
Number: 56 Created: 1 /412011
[1/4/11] The Lot 27 label is crossing into Lot 28 on the Hydrozone Plan. -Fixed
Topic: Site Plan
Number: 52
Created: 1/4/2011
[1/4/11] Please remove the bearings & distances from the Site Plan. See redlines. These
are shown on the Subdivision Plat_ -Removed
Number: 53 Created: 1/4/2011
[1/4/11] Please correct the legal description on the Site Plan. See redlines. I
Number: 54 -For After 1'= Read,no Created: 1/4/2011
[114111] Please add the ROW Vacation Ordinance # to the Site Plan prior to filing.
-Acknowledged. Will provide after first reading of ROW Vacation
Topic: Subdivision Plat
Number: 51 -For After 1" Reading Created: 1/4/2011
[1/4/11] Please add the ROW Vacation Ordinance # to the Subdivision Plat prior to filing.
-Acknowledged. Will provide after first reading of ROW Vacation
Number: 59 Created: 1/4/2011
[1/4/11] The Subdivision Plat boundary & legal close. -Acknowledged
Topic: Utility Plan
Number: 57 Created: 1/4/2011
[1/4/11] There are line over text issues on sheet 1 of the Utiltiy Plans. Fixed
Page 3
Number: 48 Created: 12/9/2010
[1/3/11) Carried as a reminder
[12/9/10 ] Not needed prior to hearing however in final compliance please create a detail for
each of the street widening locations and show them as detail 7-24 with all of the information
and dimensions called out. -Details provided in Street Details sheet
Number: 60 Created: 1 /4/2011
[1/4/11] Please show any proposed phasing on all affected sheets (Utility, Grading, etc.).
-Now Provided
Number: 61 -Procedure for Reading Created: 1/4/2011
[1/4/111 Regarding the ROW vacation, I will route the provided legal and exhibit of the
proposed vacation area to all of the affected utility providers to get their final approval (2
week turnaround). Once that is done and the project has gone through hearing, I will
prepare a ordinance for city council. The vacation can be taken to first reading while the
project is still in final compliance, however it cannot be taken to second reading until after
the mylars have been signed (however we can not release the mylars for copies until after
the second reading). -Acknowledged
Number: 63 Created: 1 /6/2011
[1/6/11] 1 have only reviewed the plan set for items required prior to hearing, therefore
additional comments may be made after the project goes to hearing. -Acknowledged
Department: Forestry Issue Contact: Tim Buchanan
Topic: Landscape Plan
Number: 62 Created: 1 /5/2011
[1/5/11] Final landscape plan needs street trees labeled as to type. -%ow Provided
Minimum species diversity should apply 3.2.1 D. 3
Department: Light & Power Issue Contact: Bruce Vogel
Topic: Utility Plan
Number: 50 Created: 1 /4/2011
[1/4/11] Same comments as 12-8-10. -Acknowledged
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 33 Created: 12/7/2010
[1/4/11] 1 discussed Endeavour with the two other technical services/addressing personnel
within the Cit, and all three of us agree Endeavour should not be used, because there are
two ways to spell the word.
STREET NAMES
Street names shall be reviewed and verified by LETA prior to being put in service.
PLEASE NOTE: While proposed street name of Voyager is acceptable, the proposed street
name of Endeavour is NOT permitted The submitted plans spelled it two ways (Endeavour
and Endeavor) - thus, it fails to meet the Larimer County Rules of the Streets requirement
that the commonly accepted spelling be used. Please submit an alternative suggestion.
Additionally, you must also receive LETA approval for suggested names.
Page 2
STAFF PROJECT REVIEW
City of Fort Collins
Jen Torrey Date: 1/10/2011
TST Inc
748 Whalers Way
Fort Collins, CO 80525
Staff has reviewed your submittal for WILLOW BROOK, THIRD FILING PDP - TYPE I
(Ref.#8-99), and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Andrew Carney
Topic: Utility Plan
Number: 18
Created: 12/7/2010
[1/3/111 Carried as a reminder
[12/7/10] Not needed prior to hearing but added as a reminder: Please add the following
note to the cover sheet of the Utility Plans (Checklist item I.J.): -
I hereby affirm that these final construction plans were prepared under my direct
supervision, in accordance with all applicable City of Fort Collins and State of Colorado
standards and statutes, respectively; and that I am fully responsible for the accuracy of all
design, revisions, and record conditions that I have noted on these plans.
Number: 19 Created: 12/7/2010
[1/3/11] Carried as a reminder/not addressed
[12/7110] Not needed prior to hearing but added as a reminder: Please add the following
note to the cover sheet of the Utility Plans (Checklist item I.M.): -Provided
These plans have been reviewed by the Local Entity for concept only. The review does not
imply responsibility by the reviewing department, the Local Entity Engineer, or the Local
Entity for accuracy and correctness of the calculations. Furthermore, the review does not
imply that quantities of items on the plans are the final quantities required. The review shall
not be construed in and reason as acceptance of financial responsibility by the Local Entity
for additional quantities of items shown that may be required during the construction phase.
Number: 20 Created: 12/7/2010
[1/3/111 Carried as a reminder
[12/7/10] Not needed prior to hearing but added as a reminder: Finish grade elevations are
needed for streets, lot corners, and finish floors/top of foundation of buildings for all lots.
-Provided or Detailed Grading Plan
Number: 47 Created: 12/9/2010
[1/3/11] Carried as a reminder
[12/9/10] Not needed prior to hearing however in final compliance be sure to include detail
7-27 for each of the two proposed intersections and also include all of the required spot
elevations and dimensions. -i rovided with Street Plans
Page I
760 Whalers Way
Bldg C Suite 200
Fort Collins, CO 80525
970.226.0557
metro 303.595. 9103
fax 970.226. 0204
info@tstincco
w tstinc. co
TST, INC. CONSULTING ENGINEERS
February 8, 2011
Mr. Ted Shepard
City of Fort Collins
Chief Planner
281 North College Avenue
Fort Collins, CO 80522
Re: Willow Brook Filing No. 3 — Observatory Village
Project No. 0963.0005.00
Dear Mr. Shepard,
Please find attached our response to the second round of staff comments for the
Willow Brook Filing No. 3 — (Observatory Village) Preliminary Development Plan.
We believe that we have adequately addressed any comments that have been
made and that the revised plan reflects the changes required by the City for
Preliminary Plan.
We look forward to your review and comments and will gladly answer any
questions that you may have.
Sincerely,
TST, INC. CONSULTING ENGINEERS
Ryan O. Banning, P.E.
ROB/mlm
Jen Torrey, RLI�
0