Loading...
HomeMy WebLinkAboutWILLOW BROOK, FILING THREE - FDP - 32-10/A - CORRESPONDENCE -This concludes the formal rounds of review. For resolution of remaining issues, please contact the individual department and staff . Sincere) T Ted Shepard Chief Planner Page 4 [3/7/11] On the utility sheets, please add a note or call out that the approximate limits of any street cuts are shown on the demo sheet. There is no need to clutter up the utility sheet with the street cuts but please call out that they are displayed on the demo sheets. Department: Forestry Issue Contact: Tim Buchanan Topic: Landscape Plan Number: 91 Created: 3/9/2011 [3/9/11] Additional appropriate species or tree selections can be used to increase diversity on this project with 15% maximum for the site or in the area for projects with 60 or more trees. Department: PFA Issue Contact: Carle Dann Topic: Fire Number: 74 Created: 3/7/2011 PFA has no additional comments or concerns at this time. Thank you for all your work and cooperation - we really appreciate it. Department: Technical Services Issue Contact: Jeff County Topic: Site Plan Number: 54 Created: 1 /4/2011 [3/7/11] This Ordinance # will be required prior to filing. [1/4/11] Please add the ROW Vacation Ordinance # to the Site Plan prior to filing. Topic: Subdivision Plat Number: 51 Created: 1 /4/2011 [3/7/11 ] This Ordinance # will be required prior to filing. [1/4/11] Please add the ROW Vacation Ordinance # to the Subdivision Plat prior to filing. Number: 75 Created: 3/7/2011 - ----[3/7/11]- The Subdivision -Plat legal-& boundary close. - - ---- - ---- -- Topic: Utility Plan Number: 76 Created: 3/7/2011 [3/7/11] Please add or correct the north arrows on sheets 14, 15 & 18 of the Utility Plans. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 87 Created: 3/8/2011 [3/8/11] Please provide an emergency spillway for the sump condition of sub -basin 3. This can be near the inlet at design point 3. See redlines. Number: 88 Created: 3/8/2011 [3/8/11 ] Please provide a 2% longitudinal slope for the swale at the southwest corner of the open space. Number: 89 Created: 3/8/2011 (3/8/11] Please show the 100-year HGLs on the storm sewer profiles. Number: 90 Created: 3/8/2011 [3/8/11] Please label cross-section A -A on the Drainage Plan. Page 3 [3/7/11] The new ADA ramps at Galileo and Lady Moon need to be directional ADA ramps. The existing ramps that are not to current standard are acceptable as long as they are in acceptable condition; however any new ramps need to be built to current standards. Number: 78 Created: 3/7/2011 [3/7/11] On the Phase 3 demo sheet, do not display the limits of development for phases 1 & 2. However, do show the limits for phase 3 (they are not currently displayed). Number: 79 Created: 3/7/2011 [3/7/11] On any Phase 3 sheet or plan, show any phase 1/2 improvements or changes as existing. Likewise, on any phase 1/2 sheets, do not display any phase 3 items. Number: 80 Created: 3/7/2011 [3/7/11] The limits and dimensions of any phase lines need to be consistent for all sheets in the utility plan set. Currently, the phase lines vary from the grading sheet to the utility sheet to the demo sheet etc., please revise to that the limits for phase 1 encompass all of phase one etc. Number: 81 Created: 3/8/2011 [3/8/11] On the street profile sheets, please more clearly show where the point grade changes are. It is difficult to tell in a few locations, see redlines. Number: 82 Created: 3/8/2011 [3/8/11] There are several locations where the point grade brakes are too large. Any single point brake must be less than 0.4%. See redlines. Number: 83 Created: 3/8/2011 [3/8/11] The scale on sheet #13 is incorrect. - - Number: 84 - - -- - - - -- — - — -- -- Created:-3/8/2011---- -- — -- - - - -- [3/8/11] On sheet #23, one spot elevation is missing, see redlines. Number: 85 Created: 3/8/2011 [3/8/11] Please add details 707 and 1606. Number: 86 Created: 3/8/2011 (3/8/11] With my redlines, I have supplied the applications for both the Development Agreement as well as the Development Construction Permit. Once returned to me, I will be able to begin work on both items. Topic: Utility Plan Number: 64 Created: 3/1 /2011 [3/1/11] Please label the existing and proposed ROW widths of all streets on the utility sheets, Voyager Lane is not dimensioned. Number: 65 Created: 3/1 /2011 [3/1/11] If the small existing utility easements along Rock Creek and Galileo are being vacated by this projects plat, they are not needed on the utility sheets. Number: 77 Created: 3/7/2011 Page 2 STAFF PROJECT REVIEW Citv of Fort Collins Jen Torrey Date: 3/14/2011 TST Inc 748 Whalers Way Fort Collins, CO 80525 Staff has reviewed your submittal for WILLOW BROOK, THIRD FILING PDP - TYPE I (Ref.#8-99), and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Andrew Carney Topic: General Number: 61 Created: 1 /4/2011 [3/7/11] Carried forward as a reminder. [1/4/111 Regarding the ROW vacation, I will route the provided legal and exhibit of the proposed vacation area to all of the affected utility providers to get their final approval (2 week turnaround). Once that is done and the project has gone through hearing, I will prepare a ordinance for city council. The vacation can be taken to first reading while the project is still in final compliance; however it can not be taken to second reading until after the mylars have been signed (however we can not release the mylars for copies until after the second reading). Number: 66 Created: 3/1/2011 [3/1/11] Comment from Engineering Inspection: All driveway entrances must be in Concrete from the curbline to the ROW line. Number: 67 Created: 3/1/2011 - — [3/1/1l]--On sheet-22; on -the -Right flowline of Exploration -Lane profile, -the -minimum length for a sag vertical curve is 70', there are several shown that are only 50'. Number: 68 Created: 3/1/2011 [3/1/11] On the flowline profiles please also label them as North/South or East/West not left or right. Number: 70 Created: 3/7/2011 (3/7/11] On sheet 6, is the shown easement for the FCLWD line existing or proposed? Number: 71 Created: 3/7/2011 [3/7/11] It appears as if all of the lot corner spot elevations are provided except for one. See sheet 9. Number: 72 Created: 3/7/2011 [3/7/11] Why are the limits of construction for Phase 1 encroaching on the lots to the south across Galileo Drive? If no impact is proposed to those lots, please revise the boundary line. Number: 73 Created: 3/7/2011 Page 1