Loading...
HomeMy WebLinkAboutPENNY FLATS, LOT 1B, FIRST REPLAT - MAJOR AMEND. - MJA110002 - CORRESPONDENCE - (5)• City of Fort Collins STAFF PROJECT REVIEW Department: Water -Wastewater Engineering Contact: Roger Buffington Number: 1 Created: 04/19/2011 04/19/2011: Water services for Bldg 4 apparently need further discussion. The "normal' practice is to abandon service stubs that are not used. If there is a valid potential use for the 1-inch commercial service, this needs to be presented for consideration. Department: Water -Wastewater Engineering Contact: Roger Buffington Number: 2 Created: 04/19/2011 04/19/2011: Provide water service sizing calcs for Bldg 4 to determine if the 1.5-inch service is adequate for 30 units. Number: 3 Created: 04/19/2011 04/19/2011: The Penny Flats utility plans show the sanitary sewer connection for the development in Maple rather than Mason as noted in the response letter. Please clarify. Department: Zoning Contact: Peter Barnes Number: 1 Created: 04/06/2011 04/06/2011: Show building footprint dimensions on site plan. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to contact me at 970-221-6343. Sincerely: T.�C Ted Shepard Chief Planner City of FOBI C611ins STAFF PROJECT REVIEW There are two future transformers planned (both will be 120/208 volt three phase). One will be located near the N.E. corner of building #2, and is planned to serve buildings 1 through 4. The other future transformer is planned to be located near the N.W. corner of building #7, and will serve both buildings #7 & #8. Note that the total of the service cables to any transformer cannot exceed 48 (12 per'leg'). Also, no service cable can exceed 500 kcm. Please contact Doug Martine at 224-6152 if any discrepancies or questions. Number: Created: 04/08/2011 Department: PFA Contact: Carie Dann Number: 1 Created: 04/18/2011 04/18/2011: The structure still must meet NFPA 13 fire -sprinkler requirements. Issues related to emergency vehicle access, water -supply and standpipes have been resolved for the time being. Department: Stormwater Engineering Number: 1 04/19/2011: No Stormwater comments, follow for the Utility plan revisions. - Department: Stormwater Engineering Contact: Wes Lamarque Created: 04/19/2011 1 floodplain comment for replat. Comments may Contact: Wes Lamarque Number: 2 Created: 04/21/2011 04/21/2011: Floodplain Management Comments, April 12, 2011. Reviewer: Jennifer Petrik 221-6221, jpetrik@fcgov.com, Brian Varrella 416-2217, bvarrella@fcgov.com First Re -Plat and Composite Site Plan SA2: Please correct and clarify the floodplain boundaries. See redlines and attached flood risk map. Attachments: Redlines and Flood risk map. Department: Technical Services Contact: Jeff County Number: 1 Created: 04/20/2011 04/20/2011: Please put "Lot 1 B" behind "Penny Flats Subdivision First Replat" in the title on all sheets. Number: 2 Created: 04/20/2011 04/20/2011: There are many line over text & text over text issues. -I Y. of Forrt Collins STAFF PROJECT REVIEW April 22, 2011 Dave Derbes Brinkman Partners LLC 3003 E Harmony Rd Fort Collins, CO 80528 City staff and outside reviewing agencies have reviewed your submittal for Penny Flats First Replat, Building 4, and we offer the following comments: Department: Engineering Development Review Contact: Marc Virata Number: 1 Created: 04/19/2011 04/19/2011: If the "project" is specifically Lot 1 B of Penny Flats Subdivision First Replat, is there a reason why the City is listed as an owner since the underlying ownership of the lot appears to only be BPPL, Penny Flats, LLC? If perhaps the City is listed because the site plan document depicts all of Penny Flats not just Lot 1 B, then does that mean that Penny Flats LLC, and other property owners on Building 5 would also need to be signatories to the site plan? Number: 2 Created: 04/19/2011 04/19/2011: Sheet SA6, the phasing plan, should also be in the construction plan set -(and if not needed as part of the planning set, removed accordingly). I'm confused by the note regarding -this Phase 1 B stating "construction of.... right-of-way improvements directly East of building 4." 1 believe all the right-of-way improvements are already in place and the only work needing to be done in right-of-way is the removal of the temporary asphalt curb head. If this is the case, the note should reference removal of all the temporary existing asphalt curb along Mason Street. This sheet should also then be renumbered to fit into the Penny Flats construction plan set numbering system, with the notation of an additional sheet on the original cover sheet index. Number: 3 Created: 04/19/2011 04/19/2011: The title of the document would be preferred to start with Penny Flats Subdivision First Replat Lot 1 B. Department: Light And Power Contact: Doug Martine Number: 1 Created: 04/08/2011 04/08/2011: This information is provided to make sure there are no misunderstandings about how the remainder of the site will be served with electric power. There are two electric transformers existing on the site. One is a 1000 kVa 120/208 volt three phase. It is located near the N. E. corner of future building #6, and is planned to serve both building #5 and future #6. The second transformer is a 750 kVa 277/480 volt three phase, and is located near the S.E. corner of future building #2. This transformer serves the U.G. parking, elevator, and the fire pump. N