Loading...
HomeMy WebLinkAboutELIZABETH & CITY PARK CORNER REDEVELOPMENT - PDP - PDP120008 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT (3)Design Procedure Form:. Rain Garden (RG) 2 of Designer. ES Company: Intatwest Cooaulting Group awe: March g, 2012 Project: Elizabeth and City Park Location: 5. Impermeable Geomembrane liner and Geoleiaile Separator Fabric Choose One O YES A) Is an impermeable liner provided due to proximity NO Of structures or grountlaater contamination? 6. Inlet / Outlet Control Choose One O Stwet Flow- No ElwrlIy Dissipation Required A) Inlet Control 0 Concentrated! pow Energy Dissipation I'mvded Ctwcse One 7. Vegetation O Satl (Pion for frequent: wasd control) * Planfings 10 Sand Grown or Other Ho IM lmaian Sod B. INlgalion Choose One O YES A) Will the rain garden be irrigated? ONO UD-BMP_v3_01 Rain Garden.xls, RG 3WO12, 11:39 AM { Design Procedure Form: Rain Garden (RG) Shutt of 22 Designer: ES Company: Interivest Consulting Group Date: March 8, 2012 project: Elisabeth and City Park Location: 1. Basin Storage Volume - A) Effective Imperviousness of Tributary Area, la I, . 100.0 % (100 % it all paved and roofed areas upstream of rain garden) B) Trbutary Area's Imperviousness Ratio (I . IJ100) I - tooft C) Water Quality Capture Volume (WOCV) for a 12-hour Drain Time WOCV - >%0.40. V miershed inches (WOCV. 0.8' (0.91' is- 1.19' P. 0.78' II D) Contributing Watershed Area (including rain garden area) Area. 16,096 sq fl E) Water Quality Capture Volume (WQCV) Design Volume Vw. - :-:'537 cu ff Vol - (WQCV / 12)' Area F) For Watersheds Outside of the Denier Region, Depth of J.. In Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, Vwp,, c,,sa :l'. cu h Water Quality Capture Volume (WQCV) Design Volume H) User input of Water Ouallty Capture Volume (WQCV) Design Volume Vwpm,. - cu ff (Only 9 a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DwocV • 12 in B) Rain Garden Side Slopes (Z.4 min., hor¢. dirt per unit vertical) Z. 0.00 ft / ft (Use'0' If rain garden has vertical valls) C) Mimimum Flat Surface Area A. - -''`3% - sq If of Actual Flat Surface Area Ak. - 400 sq ff E) Area at Design Depth (Top Surtace Area) A,.. 400 sq ft F) Rain Garden Total Volume Vr- 400 CO 11 TOTAL VOLUME c DESIGN VOLUME (Vr ((Arm . AA..1) / 2)' Depth) 3. Gmvnng Media Choose One 10 (9) w Rain Garden Groming Medla Other(Explaln): 4. Unnerduin System Choose One A) Are umlerdrairs provided? vE5� O No 8) Underdraln system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y- N/A h Volume to the Comer of the Odres i II) Volume to Drain in 12 Hours V0112 = NA cu ft I q ill) Orifice Diameter, 3/8' Minimum Dc IN A 11 ' 1 UD-6MP_v3_11 Rain Garderrxls. RG 3/8/2012, 11:39 AM Intenvest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 100-Yr Storm) LOCATION: Elizabeth & City Park Comer Redevelopment PROJECT NO: 1156-097-00 COMPUTATIONS BY: smb DATE: 3/8/2012 100 yr storm, Cf = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Point Area Design. A (ac) C Cf tc (min) i (in/hr) Q (100) (cfs) from Design Point Q (100) (cfs) all (cfs) 0 Existing 0.52 1.00 5.0 9.95 5.1 5.1 0 Proposed 0.52 1.00 5.0 9.95 5.1 5.1 0 1 0.19 1.00 5.0 9.95 1.9 1.9 Roof Drainage to 12" PVC 1 1 2 0.25 1.00 5.0 1 9.95 2.5 1 2.5 On site parking lot to 12' PVC 1 3 0.12 1.00 5.0 9.95 1.2 1.2 Off -site parking to 12- PVC 0 4 0.07 0.64 5.0 9.95 0.6 0.6 On site directly to Street Q=CiA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from City of Fort Collins OF curve (4/16/99) A = drainage area (acres) i = 84.662 i (10+ tc)°'a's Flow.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 10-Yr Storm) LOCATION: Elizabeth & City Park Corner Redevelopment PROJECT NO: 1156-097-00 COMPUTATIONS BY: smb DATE: 3/8/2012 10 yr storm, Cf = 1.00 DIRECTRUNOFF CARRYOVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) C Cf tc (min) i - (in/hr) 0 (10) (cfs) from Design Point 0 (10) (cfs) 0(10)tot (cfs) Existing 0.52 0.92 5.0 4.87 2.3 2.3 Proposed 0.52 0.89 5.0 4.87 2.2 2.2 1 0.19 0.95 5.0 4.87 0.9 0.9 Roof Drainage to 12' PVC - 1 1 2 0.25 0.92 5.0 4.87 1.1 1.1 On site parldng lot to 12' PVC 1 3 0.12 0.94 5.0 4.87 0.5 0.5 lOff-site parking to 12' PVC 4 0.07 0.67 5.0 4.87 0.2 0.2 On site directly to Street Q=CfCiA 0 = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor i = rainfall intensity (in/hr) from City of Fort Collins OF curve (4/16/99) A = drainage area (acres) i =41.44 / (10+tc)o n7' Flow.xls LOCATION: PROJECT NO: COMPUTATIONS BY: DATE: I00-yr storm Elizabeth & City Park Corner Redevelopment 1156-097-00 smb 3/8/2012 Cf = 1.25 STANDARD FORM SF-2 TIME OF CONCENTRATION - 100 YR Interwest Consulting Group SUB -BASIN DATA DESIGN SUBBASIN(s) Area PONIT (ac) (2) INITIAL /OVERLAND TIME (III C C'Cf Length Slope it (It) (min) (3) (4) 1 (5)(6) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) Length Slope n 1. (ft) Manning fV) (m) lt+it (s (7) (8) rough. 1 (9) (10) (11) tc CHECK (URBANIZED BASIN) Tote IL tc=(I/l80)+10 (it) (min) (12) (13) FINAL to (min)t (14) REMARKS Existing 0.52 0.92 1.00 1601 1.0 2.4 0 1.0 0.0161 2.0 0.001 2.4 160 10.9 5.0 Proposed 0.52 0.89 1.00 60 5.0 0.81 90 5.0 0.0161 4.5 0.331 1.21 150 10.8 5.0 1 1 1 2 3 0.19 0.25 0.12 0.95 0.92 0.94 1.00 1.00 1.00 0 60 55 2.0 5.0 3.0 0.0 0.8 1.0 125 90 0 0.5 5.0 3.0 0.0161 0.016 0.0161 1.4 4.5 3.5 1.471 0.331 0.001 1.51 1.21 1.01 125 150 55 10.7 10.8 10.3 5.0 5.0 5.0 4 0.07 0.67 0.84 14 2.0 1.4 0 2.0 0.0161 2.8 0.001 1.41 14 10.1 5.0 L _jj I I - EQUATIONS: tc=ti+It ti=[1.87(1.1-CCf)Lo.e)/S1/3 It = UVel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves Flow.xls Interwest Consulting Group STANDARD FORM SF-2 TIME OF CONCENTRATION -10 YR LOCATION: Elizabeth & City Park Corner Redevelopment PROJECT NO: 1156-097-00 COMPUTATIONS BY: snlb DATE: 3/8/2012 10-yrstorm Cl= 1.00 SUB -BASIN DATA DESIGN SUBBASIN(s) Area PONIT (ac) (1) (2) INITIAL /OVERLAND TIME (ti) C Length Slope ti (ft) (%) (min) (3) (4) (5) (6) TRAVEL TIME / GUTTER OR CHANNEL FLOW (tt) Length Slope n Vel. it tc = (ft) (%) Manning (ft/s) (min) tl+It (7) (8) rough. (9) (10) (11) tc CHECK (URBANRED BASIN) Total tc-(1/780)+10 (ft) (min) (12) (13 FINAL tc (min) (14) REMARKS Existing 0.52 0.92 160 1.0 4.3 0 1.0 0.016 2.0 0.00 4.3 160 10.9 5.0 Proposed 0.52 0.89 60 5.0 1.8 90 5.0 0.016 . 4.5 0.33 2.1 150 10.8 5.0 1 0.19 0.95 0 2.0 0.0 125 0.5 0.016 1.4 1.47 1.5 125 5.0 1 1 2 3 0.25 0.12 0.92 0.94 60 55 5.0 3.0 1.6 1.6 90 0 5.0 3.0 0.016 0.016 4.5 3.5 0.33 0.00 1.9 1.6 150 55 .10.7 10.8 10.3 5.0 5.0 4 0.07 0.67 14 2.0 2.4 0 2.0 0-016 2.8 0.00 2.4 14 10.1 5.0 EQUATIONS: tc=ti+tt tl=(1.87(1.1 -cct) L0.51/S. 113 It = UVel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of OF curves Flow.xls LOCATION: Elizabeth & City Park Corner Redevelopment PROJECT NO: 1156-097-00 COMPUTATIONS BY: smb DATE: 31812012 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks (concrete) Roofs Landscape Areas: Runoff % coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.25 0 NOTE - All impervious was lumped into this category. Interwest Consulting Group SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.ft) PAVED AREA (sq.ft) ROOF AREA (sq.ft) SIDEWALK AREA (sq.ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) % Impervious REMARKS Existing 0.52 22,500 21,512 0 0 988 0.92 96 Existing Proposed 0.52 22,500 20,440 0 0 2,060 -0.89 91 Proposed 1 0.19 8,237 8,237 0 0 0 0.95 100 Roof Area Draining Directly to Storm Sewer 2 0.25 1 11,020 f0,470 0 0 550 0.92 95 Area Draining to LID 3 4 0.12 0.07 5,163 3,243 5,063 1,958 0 L 0 0 0 100 1,285 0.94 0.67 98 60 Off Site Area Draining to LID Area Draining to Street Eauations - Calculated C coefficients & % Impervious are area weighted C = E (Ci Ai) / At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's FIow.xls No Text - _. - . - - W.ruZAS�E= � s —/z o - 3 -ice% �/L� �I � ��• '.� � � �� ELIZABETH & CITY PARK CORNER REDEVELOPMENT EXISTING IMPERVIOUS AREA 21,512 SF = 96% Mr. Wes Lamarque March 14, 2011 Page 3 of 3 All possible measures have been taken to provide water quality for the site through the proposed rain garden. The proposed redevelopment has improved upon the existing conditions by reducing the overall impervious area as well as providing water quality. The site has been designed with provisions for safe and efficient control of stormwater runoff in a manner that will not adversely affect the downstream storm system and will improve water quality for a lot that had no existing water quality system. Overall, it is evident that the proposed redevelopment will have a positive impact on the overall stormwater management system. We appreciate your time and consideration in reviewing this submittal. If you have any questions or need additional information please feel free to call at any time (970) 674-3300 Ext. 101. Sincerely, 4 "4tti Skylar Brower, P.E. Colorado Professional Engineer 44249 Interwest Consulting Group Attachments 1218 W. ASH, STE. C, WINDSOR, COLORADO 80550 TEL. 970.674.3300 - FAX 970.674.3303 Mr. Wes Lamarque March 14, 2011 Page 2 of 3 The site is required to provide water quality treatment. A pervious landscape detention system (rain garden) is proposed to achieve water quality treatment for this site. Because of the grades of the site, we are unable to drain all of the onsite water to the proposed rain garden. The onsite parking lot, in addition to 3,050 sf of the offsite parking lot to the south, will be conveyed to the rain garden. Due to site constraints, roof runoff and a portion of the sidewalks around the building will not be conveyed to the rain garden. The rain garden will be 12-inch deep and filled with a granular material following the guidelines in Urban Drainage. Once the rain garden is completely saturated, water will flow into an area drain and be conveyed north to the existing storm sewer in W. Elizabeth Street via a new 12-inch storm system. During large events water will overtop the curb surrounding the rain garden and follow the original flow path north along City Park Ave to W. Elizabeth Street. The existing and proposed imperviousness of the lot was compared as a part of this study. Exhibits are attached which show that the existing imperviousness is 96% while the proposed improvements will lower the imperviousness to 91%. This is due to an increased offset from the eastern property line to the building as well as a small landscape strip along the northern property line between the building and the sidewalk on W. Elizabeth Street. Because the impervious area will decrease with this project, detention is not required. Attached is a summary of the flows for the existing and the proposed site. With the reduction of impervious area by 5%, the 10-year flow off the site is reduced by 4%. However the 100-year flow off the site remains the same. The proposed private 12-inch PVC storm system is the only hydraulic system on the project. This system will be connected to the existing 24-inch main line in W. Elizabeth Street via a new manhole. Our calculations show a 10-year flow to the proposed 12-inch system of 2.5 cfs and a 100-year flow of 5.6 cfs. We have verified that the system can convey the 10-year flow. 100- year flows that cannot be conveyed underground will overtop and flow into City Park Ave where it is conveyed north to W. Elizabeth Street. All overtopping occurs below the finished floor. Following the Urban Drainage design procedure for sizing rain gardens, the required water quality capture volume for the proposed site is 537 cubic feet. The proposed rain garden provides 400 cubic feet of volume (approx. 74%). Please see the attached Urban Drainage Design Procedure form for more information. With the redevelopment of the site, the design team has followed the four step low impact development process outlined in Urban Drainage. With the decrease in impervious area we have reduced the runoff from the site during small storms and there is no increase in runoff during the 100-year event. A rain garden has been incorporated into the design to treat and slowly release the approximately 74% of the water quality capture volume. When runoff leaves the site it is conveyed to a public storm sewer system so there are no streams or channels associated with the project to stabilize. An erosion control plan will be implemented during construction that will address source control and unwanted materials (hazardous materials, sediment) from entering the downstream storm systems. The contractor will be responsible for implementing the erosion control plan and adequately addressing any spills or clean up on site. 1218 W. ASH, STE. C, WINDSOR, COLORADO 80550 TEL. 970.674.3300 - FAX 970.674.3303 INTERWEST = CONSULTING G R 0 U P March 14, 2012 Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80522 Re: Elizabeth & City Park Corner Redevelopment — Storm Drainage Report Dear Wes, We are pleased to submit for your review and approval this drainage letter showing the drainage impacts from the proposed redevelopment at the confer of Elizabeth Street and City Park Ave. The project is located at 1401 West Elizabeth Street and is platted as Lot 2 of Eleventh Fairview Subdivision. The site currently has an existing Mexican Restaurant (Consuelo's) and an asphalt parking lot on the site. The project will demolish the existing building and parking lot. In its place a new commercial/mixed use building and parking lot will be constructed. The proposed improvements will reduce the impervious area by approximately 5% and will provide for stormwater quality on site. The area of the site that will be improved is approximately 0.52 acres. The site is just west of the Colorado State University campus and is bounded on the north h„ West Elizabeth Street and bounded on the east by City Park Avenue. There is approximately 0.12 acres of offsite area just south of the proposed lot that is tributary to the site. Today, the entire site sheet flows to the east and northeast where it is intercepted by either City Park Ave or W. Elizabeth Street. Flow continues east along W. Elizabeth Street until it is intercepted by a Type R inlet where it enters the city storm sewer along W. Elizabeth Street. With the building addition and reconfiguration, the majority of water in the parking lot will sheet flow to the east to a pervious landscape detention area (rain garden). Water will then be piped north to the existing city storm system in W. Elizabeth Street. All roof water will be piped directly to a new 12-inch storm system that connects to the existing city storm system in W. Elizabeth Street. The site is located in a City regulatory 100-year flood fringe and floodway in the Canal Importation Floodplain. The base flood elevations based on City modeling range from 5033.7 to 5032.0. Following the guidelines of Chapter 10 in the City Code the finish floor elevation of the proposed building will be 18 inches above the base flood elevation and is at 5035.2. A floodplain use permit will be completed with the final plans. 1218 WEST ASH, SUITE C WINDSOR, COLORADO 80550 TEL. 970.674.3300 • FAX. 970.674,3303